Clarifies Implementation Schedule for Generic Ltr 88-17 Re Loss of Dhr.Shutdown Cooling Sys Tests Completed on 901023
ML20028H150
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 11/05/1990
From: Creel G
BALTIMORE GAS & ELECTRIC CO.
To: Mcdonald D
NRC
References
GL-88-17, NUDOCS 9011140017
Download: ML20028H150 (2)


Text

__

n.

A BALTIMORE GAS' AND ELECTRIC CHARLES CENTER o. P.O. BOX 1475 e BALTIMORE, MARYLAND 21203 1475 OtoRot C.- CRttL Vice Passiorni Nucatan regnov.

t (30s)#60 4455 I

- November 5,1990 q

U. S, Nuclear Regulatory Commission Washin8 ton, DC-20555 ATTENTION:

Mr.. Daniel G.. Mcdonald, Jr.

-Project Manager

-- SUBJ ECT:

Calvert Cliffs Nuclear : Power Plant Unit Nos. I' &-2; Docket Nos '50-317 & 50-318 -

Clarification - of - Generic Letter.: 88-17 Implementation 1 Schedule.

(TACs 69730 and 69731)

REFERENCES:

'(a) l Generic 1 Letter 88-17

" Loss ' of Decay.

Heat Removal," dated October = 17,.1988

-(b) ; Letter from Mr. "J. A.; Tiernan- (BG&E); to NRC Document Control Desk, dated ' January 3,1989,t Response :to Generic-Letter, " Loss of Decay Heat Removal,"

~

(c)iletterifrom.--Mr. J. A. Tiernan- (BG&E) to NRC Document
Control

-I

-_ Desk, dated' January 27, g1989, same subject

(d) -Letter from Mr. G.- C. Creel (BG&E) to NRC_ Document - Control' Desk,. dated June ' 30,1989, same subject

.l (c) ' Letter from ' Mr. Gi C. Creel -(BG&E) _ to NRC Document Control Desk, dated September 18.,1990, same subject-Gentlemen:

Generic. Letter 88.17, - Reference' (a), requested = we take. actions to-address Lloss 'of; decay heat ' removal = concerns. ' References - (b) - through (e) ~ reported - our. planned - actions and provided schedules. Our' --updated e status e-of m actions and schedule -for ' the - Programmed

- EnhancementsE(Recommended.- Actions) of the generic letter follows:

t) ')

r eon nuace 03000317

, t,I P

PDC i

'I p.

c i-

3 - =*:,;#MLD. G. LMcDonald,"Jr.

November 5,1990.-

Page 2-Completion Dates Orielnal Current -

_l__

instrumentation Modifications U-1 Spring 92 Spring 92 U-2 Spring 91 Spring 93 1

i 2.

Procedure Changes Spring 90 Complete ---

q

~ 3. _.

. Equipment Modifications U-l Spring 92

. Spring 92 -

U-2 Spring 91 Spring 93 4.

Analyses to Develop Basis-for Spring 90 Complete-

.1, 2 and 3.above 5.

Technical Specifications

' April'90 November 90 !

Changes Submitted 6.

Reactor Coolant System -

Spring 90 Complete Perturbations Minimized

}

- The necessary : instrumentation and equipment modifications will be developed after we

complete our analysis.of-the shutdown cooling system tests. The tests were ecmpleted

~

October ~ 23,.1990.

. Should. you. :h' ave -Lany ; further Questions : regarding this matter, _. we : will be. pleased to 1

discuss them 'with.you.

i Very. truly -. yours, j

/

GCC/JMO/ dim-y

cc:

D.i A.' Brune; Esquire J..E; JSilberg, Esquire e

R. JA. Capra, NR C '

D. -G.' Mcdonald, Jr., NRC

- T. T. Martin, No.C L. E. Nicholson, NRC:

.R.1.L McLean, DNR.

?

r

,o

.