Forwards IE Insp Repts 50-313/82-35 & 50-368/82-35 on 821206-10.No Noncompliance Noted
ML20028G123
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 01/03/1983
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Cavanaugh W
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20028G124 List:
References
NUDOCS 8302070425
Download: ML20028G123 (2)


See also: IR 05000313/1982035

Text

.

-

-

-_

,

3

,mH 0 3198f

Dockets:

50-313/82-35

50-368/82-35

Arkansas Power and Light Company

ATTN: William Cavanaugh, III

Senior Vice President-Energy Supply

P.O. Box 551

Little Rock, Arkansas 72203

Gentlemen:

This refers to the inspection conducted by Mr. M. E. Murphy of our staff during

the period December 6-10, 1982, of activities authorized by NRC facility

Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear One, Units 1 and 2,

and to the discussion of our findings with Mr. B. Baker and other members of

your staff at the conclusion of the inspection.

,.

Areas exam ned during the inspection and our findings are discussed in the

-

enclosed inspection report. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of the inspection, no violations or deviations were

identified.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within 10 days of the date of this letter, and submit written

appilcation to withhold information contained therein within 30 days of the

date of this letter.

Such application must be consistent with the

requirements of 2.790(b)(1).

/E0l

,

i

b'

j

RPS-C],

RPS-C

RPB2 h

ORRP&EP

MMu[r dsm

WJohnson

WSeidle

JGagliar50

JC 111ns

i

1/ 5 /83

1/f/83

1/t /83

1/p/83

1/ /83

f

\\

l

8302070425 830103

PDR ADOCK 05000313

G

PDR

_.

_

..

_

,

_

_ - _

.

-

--

.

__

..

__

_

_

__

. . _ _ _ .

'

.

Arkansas Power and Light

2

Company

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

,ggg . r-n>: t'/'

y;. C. J "I

W. C. Seidle, Chief

1

Reactor Project Branch 2

Enclosure:

Appendix - NRC Inspection Report 50-313/82-35

50-368/82-35

cc w/ enc 1:

'

J. M. Levine, General Manager

Arkansas Nuclear One

P.O. Box 608

Russellville, Arkansas 72801

"

bec to DMB (IE01)

bec distrib. by RIV:

BC

PM

RPB1

Resident Inspector

AE00

ELD

TPB

Section Chief RPS-C

'

IE FILE

NRR/DHFS/0LB

MIS SYSTEM

M. Murphy

NRR/DSI/RAB

RES

RIV File

AK State Dept. Health

LPDR

NRC PDR

RA

0. Lynch, NRR

NSIC

NTIS

G. Vissing, NRR

i

.

_

,

.

__ _ _ . _

_ . , _

, .

--.

. . _ _ _

_

_ _ _ _ _ _

. . . .-

-. _ _ _ , .

-

__