ML20028F972

From kanterella
Jump to navigation Jump to search
Forwards QA Program Insp Rept 99900736/82-01 on 821115-19 & Notice of Nonconformance
ML20028F972
Person / Time
Issue date: 01/18/1983
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Takeuchi J
NPS INDUSTRIES, INC.
Shared Package
ML20028F973 List:
References
REF-QA-99900736 NUDOCS 8302070257
Download: ML20028F972 (2)


Text

.

34N 181983 Docket No. 99900736/82-01 NPS Industries, Incorporated ATTN:

Mr. J. D. Takeuchi Corporate Manager of Quality Assurance 2750 S. W. Moody Portland, OR 97201 Gentlemen:

This refers to the inspection conducted by Mr. J. T. Conway of this office on November 15-19, 1982, of your facility at Portland, Oregon, associated with the fabrication of piping supports and'to the discussion of our findings with you and members of your staff at the conclusion of the inspection.

This inspection was made as a result of a potential 10 CFR Part 50.55(e) notification by Texas Utilities Generating Company relating to weld defects in a pipe whip restraint support structure furnished to the Comanche Peak Steam Electric Station, Unit 1.

Areas examined and our findings are discussed in the enclosed report.

Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.

During the inspection, it was found that the implementation of your QA program failed to meet certain NRC requirements.

The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.

Please provide us within 30 days from the date of this letter a written statement containing:

(1) a description of steps that have been or will be taken to correct these itenis; (2) a description of steps that have been or will be taken to prevent recurrence; and (3) the date your carrective actions and preventive measures were or will be completed.

Consideration may be given to extending your response time for good cause shown.

The response requested by this letter is not subject t9 the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

5

/

f RIV f/.

[$

S [ / RA:RIV / W CI:R& CPS SC:R& CPS BC:R& CPS D:09Qd D:

JTConway/jkh IBarnes UPotapovs RLBangart EHJohnson JTColli s

//9/g3

/ l19/ d

)/(Y y/ '/Q

,// /

[lllf'/

fB

-Q'T

  1. p G302070257 830110 PDR GA999 EMVNPS 99900736 PDR

NPS Industries, Incorporated In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

If this report contains any information that you believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone within 10 days from the date of this letter of your intention to file a request for withholding; and (b) submit within 25 days from the date of this letter a written application to this office to withhold such information.

If your receipt of this letter has been delayed such that less than 7 days are available for your review, please notify this office promptly so that a new due date may be established.

Consistent with Section 2.790(b)(1), any such application must be accompanied by an affidavit executed by the owner of the information which identifies the document or part sought to be withheld, and which contains a full statement of the reasons on the basis which it is claimed that the information should be withheld from public disclosure. This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specified periods noted above, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with yeu.

Sincerely, D$

i

.cd

~

    • O dd 947 C
u. P l

Uldis Potapovs, Chief Vendor Program Branch

Enclosures:

1.

Appendix A - Notice of Nonconformance 2.

Appendix 8 - Inspecticn Report No. 99900736/82-01 3.

Appendix C - Inspection Data Sheets (4 pages) bec:

IE Files AE0D QAB NRC:PDR Reg. Administrators I, II, III, IV, V EHJohnson, RIV RLBangart, RIV JEGagliardo, RIV