Forwards IE Insp Repts 50-317/82-13 & 50-318/82-11 on 820511-14.No Noncompliance Noted
ML20028F476
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 01/17/1983
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20028F478 List:
References
NUDOCS 8302010380
Download: ML20028F476 (2)


See also: IR 05000317/1982013

Text

.

.

  1. fl1 7 7933

Docket No. 50-317

50-318

Baltimore Gas and Electric Company

ATTN: Mr. A. E. Lundvall, Jr.

Vice President, Supply

P. O. Box 1475

Baltimore, Maryland 21203

Gentlemen:

Subject:

Inspection Report No. 50-317/82-13; 50-318/82-11

This refers to the routine safety inspection conducted by Mr. K. Plumlee of

this office on May 11-14, 1982, at the Calvert Cliffs Nuclear Power Plant

Units 1 and 2, Lusby, Maryland of activities authorired by NRC License No.

DPR-53; DPR-69 and to the discussions of our findings held by Mr. Plumlee with

Mr. D. Latham, and others of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspectio. consisted of selective examinations of procedures and representa-

tive records, interviews with personnel, measurements made by the inspector,

and observations by the inspector.

Within the scope of this inspection, no v 41ations were observed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of

the date of this letter. Srch application must be consistent with the re-

quirements of 2.790(b)(1). The telephone notification of your intent to

request withholding, or any request for an extension of the 10 day period

.

which you believe necessary, should be made to the Supervisor, Files, Mail and

l

Records, USNRC Region I, at (21') 337-5223.

s

No rep?y to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

ORIGI'*AI, SIG5-5k

Wobed 3 B<ao

p Thomas T. Martin, Director

Division of Engineering and Technical

Programs

Eclosure: Combined NRC Region I Inspection Report Number

50-317/82-13; 50-118/82-11

0FFICIAL RECORD COPY

8302010300 830117

FN

PDR ADOCK 05000317

G

PDR

.

.

Baltimore Gas and Electric Company

2

g y 7 79gy

cc w/ enc 1:

R. M. Douglass, Manager, Quality Assurance

L. B. Russell, Plant Superintendent

T. Sydnor, General Supervisor, Operations QA

R. C. L. Olson, Principal Engineer

J. A. Tiernan, Manager, Nuclear Power

R. E. Denton, General Supervisor, Training and Technical Services

Public Document Room (PDR)

Local Public Dccument Room (LPDR)

Nuclear Safety Information Center (NSIC)

State of Maryland (2)

NRC Resident Inspector

bec w/ enc 1:

Region I Docket Room (with concurrences)

Senior Operations Support Officer (w/o encis)

OPRP Section Chief

4

D TP

RI:DETP

P

RI-

TP

Plumlee.pja

Shana{ky

Bores

p.artin

1/4/&3-

Q

/g/y)

f

OFFICIAL RECORD COPY

l

ec

-

-

.,.r