ML20028F447

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-373/82-52 & 50-374/82-20 on 821101-30 & Notice of Violation
ML20028F447
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 01/19/1983
From: Streeter J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20028F448 List:
References
NUDOCS 8302010362
Download: ML20028F447 (2)


See also: IR 05000373/1982052

Text

7-

,

.

JAN 191983

Docket No. 50-373

Docket No. 50-374

Commonwealth Edison Company

ATTN:

hr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

This refers to the routine safety inspection conducted by K. Raglin, R. Anderson,

A. Madison, and W. Guldemond of this office on November 1-30, 1982, of activities

at LaSalle Station, Units 1 and 2, authorized by NRC Operating License NPF-11

and NRC Construction Permit CPPR-100 and to the discussion of our findings with

Mr. G. J. Diederich at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in the enclosed Appendix.

A written response is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a wrieten application to this office to

withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are availe51e for your review,

please notify this office pronptly so that a new due date- may be estab-

lished. Consistent with Secta.n 2.790(b)(1), any such application must

be accompanied by an affidavi? executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure,

i

!

830201M62 830119

60/

PDR AL:KK 05000373

P

Q

PDR

..

.

.

Commonwealth Edison Company

2

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard witnin

the specified periods noted above, a copy of this letter, the enclosures,

and your response to this letter will be placed in the Public Document

Room.

The responses directed by this letter (and the accompanying Notice) are

not subject to the clearance procedures of the Office of Management and

Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Yd

J. F. Streeter, Chief

Projects Branch 2

Enclosures:

1.

Isppendix, Notice

of Violation

2.

Inspection Report

No. 50-373/82-52(DPRP);

No. 50-374/82-20(DPRP)

cc w/encls:

Louis 0. De1 George, Director

of Nuclear Licensing

D. L. Shamblin, Site

Construction Superintenden'.

T. E. Quaka, Quality

Ascurance Supc-intendent

G. J. Diederi'1, Station

Superintendent

n. E, Holyoak, Project Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Karen Borgstadt, Of# ice of

Assistant Attorney General

RITI

RIII

% $5;xs-

%g

W&lker/jp

Streeter

1/9/83

l/lgyg3