7-
,
.
JAN 191983
Docket No. 50-373
Docket No. 50-374
Commonwealth Edison Company
ATTN:
hr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
This refers to the routine safety inspection conducted by K. Raglin, R. Anderson,
A. Madison, and W. Guldemond of this office on November 1-30, 1982, of activities
at LaSalle Station, Units 1 and 2, authorized by NRC Operating License NPF-11
and NRC Construction Permit CPPR-100 and to the discussion of our findings with
Mr. G. J. Diederich at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in the enclosed Appendix.
A written response is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a wrieten application to this office to
withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are availe51e for your review,
please notify this office pronptly so that a new due date- may be estab-
lished. Consistent with Secta.n 2.790(b)(1), any such application must
be accompanied by an affidavi? executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure,
i
!
830201M62 830119
60/
PDR AL:KK 05000373
P
Q
..
.
.
Commonwealth Edison Company
2
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard witnin
the specified periods noted above, a copy of this letter, the enclosures,
and your response to this letter will be placed in the Public Document
Room.
The responses directed by this letter (and the accompanying Notice) are
not subject to the clearance procedures of the Office of Management and
Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
Yd
J. F. Streeter, Chief
Projects Branch 2
Enclosures:
1.
Isppendix, Notice
of Violation
2.
Inspection Report
No. 50-373/82-52(DPRP);
No. 50-374/82-20(DPRP)
cc w/encls:
Louis 0. De1 George, Director
of Nuclear Licensing
D. L. Shamblin, Site
Construction Superintenden'.
T. E. Quaka, Quality
Ascurance Supc-intendent
G. J. Diederi'1, Station
Superintendent
n. E, Holyoak, Project Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Karen Borgstadt, Of# ice of
Assistant Attorney General
RITI
RIII
% $5;xs-
%g
W&lker/jp
Streeter
1/9/83