Text
.
.
JAN 17 583
Docket No. 50-334
Duqesne Light Company
ATTN: Mr. J. J. Carey
Vice President
Nuclear Division
Post Office Box "4"
Shippingport, Pennsylvania 15077
Gentlemen:
Subject:
Inspection No. 82-31
This refers to the routine inspection conducted by Dr. J. C. Jang of this
office on December 14 - 17, 1982 of activities authorized by NRC License No.
DPR-66 and to the discussions of our findings held by J. C. Jang with Messrs.
'
Lipchick, Linnenbom, and Wenkhous at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I In -
spection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
In addition, our Mobile Laboratory was also brought to your site and used by
the inspector to make certain independent measurements.
The basic purpose of
these independent measurements is to verify your capability for analyzing
radioactive effluents, and to achieve and maintain comparable methods of
analyses between your facility and the NRC. The complete data from these
measurements will be reported in a subsequent Inspection Report.
Our inspector also verified the steps you have taken to correct the violation
brought to your attention in the enclosure to our letter dated October 8, 1981.
We have no further questions regarding your action at this time.
Within the scope of this inspection, no violations were observed.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of
the date of this letter. Such application must be consistent with the require-
ments of 2.790(b)(1).
The telephone notification of your intent to request
..'
withholding, or any request for an extension of the 10 day period which you
believe necessary, should be made to the Supervisor, Files Mail and Records,
USNRC Region I, at (215) 337-5223.
OFFICIAL RECORD COPY
[Ob
8301310189 830117
PDR ADOCK 05000334
Q
I
I
.
.
Duquesne Light Company
2
No reply to this letter is required. Your cooperation with us in this matter
is appreciated.
Sincerely,
10EIGINAL SIGNED BT
XobecY $ bm
T omas T. Martin, Director
Division of Engineering and
Technical Programs
Enclosure: NRC Region I Inspection Report Number 82-31
cc w/ encl:
F. Bissert, Manager, Nuclear Support Services
R. Washabaugh, QA Manager
W. S. Lacey, Station Superintendent
Chief Engineer
R. Martin, Nuclear Engineer
J. Sieber, Manager, Nuclear Safety and Licenisng
-
T. D. Jones, Manager, Nuclear Operations
R. M. Mafrice, Nuclear Engineer
N. R. Tonet, Manager, Nuclear Engineering
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
bec w/ encl:
Region I Docket Room (with concurrences)
Senior Operations Officer (w/o encls)
Chief, Reactor Projects Section 2A
l
RI:DETP
RI:DETP
- DETP
RI:
P
Jang/nm
Kottan
ores
M tin
1/11/83
Iqp63
/ Y
3
e I'C AL RECOR COPY
( pu
b
O)
.