APPEN0!X A
]
GPU Nuclear Corporation Docket No. 50-219 i
Oyster Creek Nuclear Generating Station License No. DPR-16 i
j As a result of the inspection conducted on November 12 - December 31,1982,and in accordance with the NRC Enforcement Policy (10 CFR 2, Appendix C) published in the Federal Register on March 9,1982 (47 FR 9987), the following violations were identified:
A.
Technical Specification 6.8.1 requires that written procedures be estab-lished, implemented and maintained that meet or exceed the requirements of Appendix "A" of NRC Regulatory Guide 1.33-1972.
m l
Regulsi.o.y Guide 1.33-1972 requires that shift and relief turnover be covered 1
by written procedures.
Administrative Procedure 106 Revision 21. June 1,1982, " Conduct of Opera-
]
tions " requires that proper and conservative turnover of shift responsibili-i ties be conducted. Pertinent information shall be transferred between par-j ties and turnover checklists shall be used as guides and signed prior to j
the oncoming personnel assuming the shift duties.
Contrary to the above, on November 16, 1982, shift turnover was not properly 4
conducted in that the offgoing midnight to 8:00 a.m. shift did not inform the relieving shift that a normally closed containment isolation valve had been left open, nor had all required personnel signed the turnover checklist 4
prior to oncoming personnel assuming shift duties.
l This is a Severity Level IV Violation (Supplement I).
}
B.
Technical Specification 6.8.1 requires that written procedures be estab-lished, implemented and maintained that meet or exceed the requirements of Appendix "A" of NRC Regulatory Guide 1.33-1972.
I Regulatory Guide 1.33-1972 requires that appropriate procedures for the Rod Worth Minimi::er be prepared for reactor startup, shutdown, and changing modes of oparation.
i l
Contrary to the above, as of December 14,1982, appropriate procedures were not established and implemented for the Rod Worth Minimizer in that no veri-fication of the Rod Withdrawal Sequence entered in the Rod Worth Minimizer l
(RWM) was required prior to reactor startup. The failure to have an appro-priate procedure contributed tc conducting a Reactor Startup on December 14, 1982 with the wrong rod withdrawal sequence entered in the RWM.
This is a Severity Level IV Violation (Supplement I).
8301310183 830118
'. PDR ADOCK 05000219 O
" W DATEf
.......... ~.. ~
~.. ~ ~... ".
FFICI AL R ECOR D COPY.
l une ronu m ao no, unc" "
O
Appendix A 2
Pursuant to the provisions of 10 CFR 2.201, GPU Nuclear Corporation is hereby re-quired to submit to this office within 30 days of the date of the letter trans-mitting this Notice, a written statement or explanation in reply, including for each violation:
(1) the corrective steps which have been taken and the results achieved; (2) the corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.