Revised Monthly Operating Rept for Oct 1982
ML20028F072
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 11/04/1982
From: Hairston W
ALABAMA POWER CO.
To:
Shared Package
ML20028F066 List:
References
NUDOCS 8301310093
Download: ML20028F072 (5)


Text

__

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 O

NARRATIVE

SUMMARY

OF OPERATIONS October, 1982 In the month of October there was one unit shutdown on October 22, 1982, which initiated the Cycle I - Cycle II refueling.

The following safety-related maintenance was performed in the month of October:

1.

Performed miscellaneous maintenance on diesel generators.

2.

Repacked 2E Service Water pump.

3.

Repacked #7 River Water pump.

4.

Performed annual inspection on Spent Fuel Pool Cask crane.

5.

Repaired leaking Spent Fuel Pool check valve V013 (Pen. #95).

O I

I

' O B301310093 830124 PDR ADOCK 05000364 PDR g

STEAM GENERATOR TUBE PLUGGING O

Based on industry experience and past experience at FNP, the majority of Westinghouse steam generator tube leaks occur on the steam generator inner row tubes. Therefore, a management decision was made to plug all the inner row tubes of the three Unit 2 steam generators to prevent unplanned outages in the future. Also, three additional tubes on Steam Generator 2A were plugged.

Dates of Plugging:

10/28/82 - 11/01/82 All (94) S/G 2A inner row tubes were plugged.

In addition, the three following tubes on S/G 2A were also plugged.

Row Column 28 10 29 11 30 12 All (94) S/G 2B inner row tubes were plugged.

All (94) S/G 2C inner row tubes were plugged.

O 1

N OPERATING DATA REPORT DOCKET NO. 50-364 DATE 11/04/82 COMPLETED BY W.G.Hairston, III TELEPHONE (205)899-5156 OPERATING STATUS Notes

1. Unit Name:

Joseoh M. Farlev - Unit 2

2. Reporting Period:

October, 1982

1) Cumulative data since 2652 7/30/81, date of
3. Licensed Thermal Power (MWr):
4. Nameplate Rating (Grow MWe):

commercial operation.

860 829 S. Design Electrical Rating (Net MWe):

854.7

6. Maximum Dependable Capacity (Gross MWe):

813.7

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:

N/A N/A

9. Power LevelTo Which Restricted,If Any(Net MWe):
10. Reasons For Restrictions,If Any: N/A This Month Yr.-to-Date Cumulatise 745 7,296 11,017 II. Hours in Reporting Period l
12. Number Of Hours Reactor Was Critical 528 6,346.2 10,032.4 0

97.6 138.4

13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 527.7 6,254.2 9,920.7
15. Unit Resene Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 1.387.065 15,955,657 25,421,814 l Rev. 1 5,102,520 8,173,898
17. Gross Electrical Energy Generated (MWH) 441,252 _,

4,832,614 7,753,334

18. Net Electrical Energy Generated (MWH) 417,138
19. Unit Senice Factor 70.8 85.7 90.0
20. Unit Availability Factor 70.8 85.7 90.0 68.8 81.4 86.5
21. Unit Capacity Factor (Using MDC Net) 67.5 79.9 84.9
22. Unit Capacity Factor (Using DER Net) 0.0 11.6 8.1
23. Unit Forced Outage Rate l
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date,and Duration of Eachl:

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

12/12/82

26. Units In Teu Status (Prior to Commercial Operation):

Forecast Achiesed INITIA L CRITICALITY 5/06/81

, /08/81 INITIAL ELECTRICITY 5/24/81 5/25/81 ye COMMERCIAL OPERATION 8/01 /81 7/30/81 (9/77I

UOC}:EI NO. _50-364 UNIT J M-Feriry-Unit 2 11/04/82 DA1E --

i)

W. G. Hairston, III

..,m

  • /

\\

CO.stPLETED Dy

'\\ )

/

IELLPl!ONE (205)899-5156 s

October

,yo nig AVEli AC'J P \\11.Y l't)h tit LEVEL '

DAY AVERACE DTILY PowC:t f.EVEL (MWe Net)

DAY

(,'.i h e.Nei l 809 800 17 g

13 803 791 795 804 19 3

789 4

u 797 785 795

.I 742

~m

. 9 ',

~

,- 795

.g

~

-0

, m/

'. c !.

A.J

a
c 796 796 m..

I,.,

794

3 s.-
  • 797 9

g3 806 30 g.; 809 3:

15 806 16 l

~

INSTi;UCllONS On this formtr.litt the s=ersg daily umt power !cvelin MWe. Net for each d:y in the repostmg mo

, the neare.t whole nc;2 wit.

\\

l l

'- -~

p DOCKET NO. 50-364 UNIT SilUTDOWNS ATID l'GWER ltEDtJCT10NS UNIT NAhlE

.T. M.

Farlev-Unit 2 DATE 11/04/82 COhlPLETED uy u c. Hai rston. III Hil' ORT hlDiluf n'tchac*1982

~~

TELEPilONE (205) 899-5156 e.

E E

jg

}

j $Q Litemec

@t f'8 Causc 1 Corrective No.

Date g

3g 2s5 Even 3, 'd Action to gu jE 5

y ;f3 Pscveni Recunence Report a vs U F

=

o u

e 6

013 823022 S

217.3 C

1 NA IIA NA Unit was taken o'ff line for the Cycle I - Cycle II refueling outage.

i I

2 3

4 F: l'orced Reason:

llenho.1:

Exhibit G - Instructions S: ! cheduled A Equipment Failure (Explain) 14tanual for Pseparatism of Data 114taintenance or Test 24tanual Scram.

Episy Slieces foe 1.icensee C-Hefuelmg

.1 Automatic Scram.

Event ReposI(l.FR) File (NUREG-D Regulaiusy Restriction 1 Othes (Emplain) 0161)

E-Opesaior Tsia is & license Exauunation F Adminisisasive 5

19/77)

G Opesaison.il I.sson (l!= plain)

Ushibit I - Same Sinuce 11 Othes (F mplain) 1 W--

-