JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 O
NARRATIVE
SUMMARY
OF OPERATIONS October, 1982 In the month of October there was one unit shutdown on October 22, 1982, which initiated the Cycle I - Cycle II refueling.
The following safety-related maintenance was performed in the month of October:
1.
Performed miscellaneous maintenance on diesel generators.
2.
Repacked 2E Service Water pump.
3.
Repacked #7 River Water pump.
4.
Performed annual inspection on Spent Fuel Pool Cask crane.
5.
Repaired leaking Spent Fuel Pool check valve V013 (Pen. #95).
O I
I
' O B301310093 830124 PDR ADOCK 05000364 PDR g
STEAM GENERATOR TUBE PLUGGING O
Based on industry experience and past experience at FNP, the majority of Westinghouse steam generator tube leaks occur on the steam generator inner row tubes. Therefore, a management decision was made to plug all the inner row tubes of the three Unit 2 steam generators to prevent unplanned outages in the future. Also, three additional tubes on Steam Generator 2A were plugged.
Dates of Plugging:
10/28/82 - 11/01/82 All (94) S/G 2A inner row tubes were plugged.
In addition, the three following tubes on S/G 2A were also plugged.
Row Column 28 10 29 11 30 12 All (94) S/G 2B inner row tubes were plugged.
All (94) S/G 2C inner row tubes were plugged.
O 1
N OPERATING DATA REPORT DOCKET NO. 50-364 DATE 11/04/82 COMPLETED BY W.G.Hairston, III TELEPHONE (205)899-5156 OPERATING STATUS Notes
- 1. Unit Name:
Joseoh M. Farlev - Unit 2
- 2. Reporting Period:
October, 1982
- 1) Cumulative data since 2652 7/30/81, date of
- 3. Licensed Thermal Power (MWr):
- 4. Nameplate Rating (Grow MWe):
commercial operation.
860 829 S. Design Electrical Rating (Net MWe):
854.7
- 6. Maximum Dependable Capacity (Gross MWe):
813.7
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
N/A N/A
- 9. Power LevelTo Which Restricted,If Any(Net MWe):
- 10. Reasons For Restrictions,If Any: N/A This Month Yr.-to-Date Cumulatise 745 7,296 11,017 II. Hours in Reporting Period l
- 12. Number Of Hours Reactor Was Critical 528 6,346.2 10,032.4 0
97.6 138.4
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line 527.7 6,254.2 9,920.7
- 15. Unit Resene Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 1.387.065 15,955,657 25,421,814 l Rev. 1 5,102,520 8,173,898
- 17. Gross Electrical Energy Generated (MWH) 441,252 _,
4,832,614 7,753,334
- 18. Net Electrical Energy Generated (MWH) 417,138
- 19. Unit Senice Factor 70.8 85.7 90.0
- 20. Unit Availability Factor 70.8 85.7 90.0 68.8 81.4 86.5
- 21. Unit Capacity Factor (Using MDC Net) 67.5 79.9 84.9
- 22. Unit Capacity Factor (Using DER Net) 0.0 11.6 8.1
- 23. Unit Forced Outage Rate l
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date,and Duration of Eachl:
N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
12/12/82
- 26. Units In Teu Status (Prior to Commercial Operation):
Forecast Achiesed INITIA L CRITICALITY 5/06/81
, /08/81 INITIAL ELECTRICITY 5/24/81 5/25/81 ye COMMERCIAL OPERATION 8/01 /81 7/30/81 (9/77I
UOC}:EI NO. _50-364 UNIT J M-Feriry-Unit 2 11/04/82 DA1E --
i)
W. G. Hairston, III
..,m
- /
\\
CO.stPLETED Dy
'\\ )
/
IELLPl!ONE (205)899-5156 s
October
,yo nig AVEli AC'J P \\11.Y l't)h tit LEVEL '
DAY AVERACE DTILY PowC:t f.EVEL (MWe Net)
DAY
(,'.i h e.Nei l 809 800 17 g
13 803 791 795 804 19 3
789 4
- u 797 785 795
.I 742
~m
. 9 ',
~
,- 795
.g
~
-0
, m/
'. c !.
A.J
- a
- c 796 796 m..
I,.,
794
- 3 s.-
- 797 9
g3 806 30 g.; 809 3:
15 806 16 l
~
INSTi;UCllONS On this formtr.litt the s=ersg daily umt power !cvelin MWe. Net for each d:y in the repostmg mo
, the neare.t whole nc;2 wit.
\\
l l
'- -~
p DOCKET NO. 50-364 UNIT SilUTDOWNS ATID l'GWER ltEDtJCT10NS UNIT NAhlE
.T. M.
Farlev-Unit 2 DATE 11/04/82 COhlPLETED uy u c. Hai rston. III Hil' ORT hlDiluf n'tchac*1982
~~
TELEPilONE (205) 899-5156 e.
E E
jg
}
j $Q Litemec
@t f'8 Causc 1 Corrective No.
Date g
3g 2s5 Even 3, 'd Action to gu jE 5
y ;f3 Pscveni Recunence Report a vs U F
=
o u
e 6
013 823022 S
217.3 C
1 NA IIA NA Unit was taken o'ff line for the Cycle I - Cycle II refueling outage.
i I
2 3
4 F: l'orced Reason:
llenho.1:
Exhibit G - Instructions S: ! cheduled A Equipment Failure (Explain) 14tanual for Pseparatism of Data 114taintenance or Test 24tanual Scram.
Episy Slieces foe 1.icensee C-Hefuelmg
.1 Automatic Scram.
Event ReposI(l.FR) File (NUREG-D Regulaiusy Restriction 1 Othes (Emplain) 0161)
E-Opesaior Tsia is & license Exauunation F Adminisisasive 5
19/77)
G Opesaison.il I.sson (l!= plain)
Ushibit I - Same Sinuce 11 Othes (F mplain) 1 W--
-