a JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS NOVEMBER, 1982 The Cycle I - Cycle II Refueling Outage continued through the month of November.

The following safety-related maintenance was performed in the month of November:

1.

Performed miscellaneous maintenance on diesel generators.

Cleaned, inspected and repaired miscellantous valves in containment.

2.

3.

Performed hydraulic snubber functional test and repaired snubbers

'I as necessary.

4.

Repacked #2, #4, #6, #7 and #10 River Water pumps.

O l

O 8301310089 830124 PDR ADOCK 05000364 R

PDR g

OJ OPERATING DATA REPORT DOCKET NO. 50-364 DATE 12/04/82 COMPLETED BY W.G.Hairston$

III TELEPHONE (Z03)899-515 OPERATING STATUS I. Unit Name: J seph M. Farley - Unit 2 Notes

2. Reporting Period:

November, 1982

1) Cumulative data since 2652 7/30/81, date of
3. Licensed Thermal Power (MWt):

860

4. Nameplate Rating (Gross MWr):

commercial operation.

829

5. Design Electrical Rating (Net MWe):

854.7

6. Maximum Dependable Capacity (Gross MWe):

813.7

7. Maximum Dependable Capacity (Net MWe):
8. If C mges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A N/A

9. Power Level To Which Restricted,If Any (Net MWe):
10. Reasons For Restrictions,If Any:

N/A O

This Month Yr.-to-Date Cumulatise 720 8,016 11,737 i1. Ilours In Reporting Period 12.4 6,358.6 10,044.8

12. Number Of flours Reactor Was Critical 0

97.6 138.4

13. Reactor Reserse Shutdown flours
14. Ilours Generator On.Line 0

6,254.2 9,920.7

15. Unit Reserve Shutdown Hours 0

0 0

0 15,955,657 25,421~,814 lRev. 1

16. Gross Thermal Energy Generated (MWH) 28 5,102,548 8,173,926
17. Gross Electrical Energy Generated (MWH) 4,825,150 7,745,870
18. Net Electrical Energy Generated (MWH)

-7,464 0.0 78.0 84.5

19. Unit Service Factor 0.0 78.0 84.5
20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net)

-1.3 74.0 81.1

22. Unit Capacity Factor (Using DER Net)

-1.3 72.6 79.6

23. Unit Forced Outage Rate 0.0 11.6 8.1
24. Shutdowns Scheduled Oser Next 6 Months (Type.Date,and Duration of Eacht:

M/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup: 12/03/82
26. Units in Test Status IPrior to Commercial Operation):

Forecast Achiesed INITIAL CRITICA LITY 5/06/81 5/08/81

(])

f INI'llAL ELECTRICITY 5/24/81 5/2531 COMMERCIAL OPER ATION 8/01/81 7/30/81 (9/77i

=

F Uth.!Lis1U.

.,J.

2 UNIT 12/04/82

~

DATE 7

W. G. Hairston, III C05tPLETED BY g

(205) 899-5156 TELEPl!ONE November

)!ONTl!

DAY AVEFACE DAILY POWER LEVEL '

DAY' AVERAGE DAILY POWER LEVEL (SIWE-Net)

(MWe-Net) 0 O

g7 I.

0 13 0

2 0

0 39 3

0 0

20

'4'

~

~

0 O

21 5

0 0

6

. 22 0

7

.__0 23 0

0 2/

3 0-f 0

25 9

0

' O IO O

'6 L/

0 l

0 27 gg 0

0 23 12 0

0 29 13 0

0 30 4

g4 0

3g e

IS 16 0

l l

INSTRUCIlONS On tiiis fonnst. list the svenge daily unit power levelin MWe Net for each d:y in the reporting month. Compute to

. the nessest whole ne;2 watt.

(9(77) l g

e..,

y 3,,,,

a.

w

.m DOCKET NO. 50-364 UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAME J.M.Farley - Unit D ATE l? /04 /R7 COMPLETED BY k'.G. ila irs t on, III REPORT MONTil November TELEPil0NE (205)899-5156 w.

E E

! i w

jg

}

  • E5 Licensee Ev, f.,

Cause & Corrective Action to

' i No.

Date g

5g 2s5 Event g3 g3 u, o u

Prcvent Recurrence y5 5

y= 5 g lupurt #

g H

j 6

1 l

013 821101 S

720 C

1 NA NA NA Unit outage was continued from 10/31/82 for refueling.

l i i

i c

I

(

l 3

4 I

2 Method:

Exhibit G. Instructions F: Forced Reason:

S: Soliedu'ed A. Equipment Failure (Explain) 1 Manual for Preparation of Data 11 Maintenance o(Test

2. Manual Scraen.

Entry Sheets for 1.icensi:e 3 Automatic Scram.

Ewns Report (1.ER) File (NUREG-C.Refuelmg D Regulatory Resiriction 4-Other (Explain) 0161)

E-Operatur Tsaining & Ucense Examination 5

F Adminisitative lislabis I Same Sonice G Opciational 1.ison (Enplam) 19/17) 114 hhce ll:aplaini a

.