ML20028F065

From kanterella
Jump to navigation Jump to search
Forwards Revised Monthly Operating Repts for Oct & Nov 1982
ML20028F065
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 01/24/1983
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML20028F066 List:
References
NUDOCS 8301310083
Download: ML20028F065 (1)


Text

_

M;iling Addrtes Alabama Power Company 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.

%"$pCgd*"'

AlabamaPower g

tte southern elecinc system January 24, 1983 Docket No. 50-364 Director, Office of Management Information and Program Control V.

S.

Nuclear Regulatory Commission Washington, D.C.

20555

Dear Si r:

RE: Joseph M. Farley Nuclear Plant Ur~

e.

Monthly Operating Data Report Attached are two (2) copies of the revised October, 1982 and November, 1982 Monthly Operating Reports for Joseph M.

Farley Nuclear Plant, Unit 2, required by Section 6.9.1.10 of the Unit 2 Technical Specifications.

As requested by letter from Mr. John F. Stol z to Mr. Al an R.

Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Yours very truly,

}Y F. L.

Cl ayton, J r.

FLCJr/KWM:nac Enclosures xc: Mr. Ted Ci n t ul a (1 copy)

Director, IE (10 copies)

Director, RII (1 copy)

[G 8301310083 830124 PDR ADOCK 05000364 R

PDR J