JAN 101983
NT
Docket No. 50-10
-//
Docket No. 50-237
Docket No. 50-249
Commonwealth Edison Company
ATIN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. T. M. Tongue,
M. J. Jotian and S. Stasek during the period of October 30, 1982 through
December 1, 1982, of activities at Dresden Nuclear Power Station, Units 1, 2,
and 3, authorized by NRC Operating License Nos.-DPR-02,.DPR-19, and DPR-25 and
to tha discussion of our findings with Mr. D. Scott and others of your staff
at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined'during
the inspection. Within these areas, the inspection consisted of a selective
,
examinacion of procedures and representative records, observations, and-
interviews with personnel.
-
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's-
Public Document Room.
If this report contains any information that you"(or
your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within ten (10)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date o,f
this letter a written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than seven
(7) days are available for your review, please notify this office pro'ptly"
m
so that a new due date may be established. Consistent with Section 2.790(b)(1),
any such application must be accompanied by an affidavit executed by _t'ae
owner of the information which identifies the document or part sought to
,
-)
,
f-
/
4
a
+
,h
/^
->
8301200280 830110
PDR ADOCK 050000g
>
[E01
'
=
-
.
a
,
,
-.
Commonwealth Edison Company
2
January 10, 1983
'
,
r
be withheld, and which contains a full statement of the reasons which are
the bases for the claim that the information should be withheld from public
disclosure. This section further requires the statement to address with
specificity the considerations listed in 10 CFR 2.790(b)(4)., The informa-
tion sought to be withheld shall be incorporated as far as possible into
a separate part of the affidavit.
If we do not hear from you in this
regard within the specified periods noted above, a copy of this letter-
and the enclosed inspection report will be placed in the Public Document
Room.
,
We will glad
discuss any. questions you have concerning this inspection.
'
Sincerely,
/
Wh
J. F. Streeter, Chief
Projects Branch 2
- ,
'
Enclosure:
Inspection Report
No. 50-10/82-21(DPRP);
No. 50-237/82-29(DPRP);
and No. 50-249/82-30(DPRP)
cc w/ enc 1:
Louis O. De1 George, Director
of Nuclear Licensing
D. J. Scott, S tatic.n
Superintendent
'
DMB/ Document Control Desk (RIDS)
'
Resident Inspector, RIII
>
- 3
Karen Borgstadt, Office of
'
Assistant Attorney General
'
il
,
.
-.
l
16
,
'
i
.-
/
>
- (2.$r
R II
RIII
i
ANb^
$kV
!
1ker/jp
St eeter
g
,
1/a /83
slt/6)
1/4/83
'
c
7
i