Forwards IE Insp Rept 50-445/82-30 on 821213-16 & Notice of Violation
ML20028E745
Person / Time
Site: Comanche Peak 
Issue date: 01/12/1983
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20028E746 List:
References
NUDOCS 8301280166
Download: ML20028E745 (2)


See also: IR 05000445/1982030

Text

- --

-

-

. .

. . . . .

- . . . - -

~...

..

.

.

.

.

JAN 121983

Docket: 50-445/82-30

Texas Utii tties Generating Company

ATTN:

R. J. Gary, Executive Vice

President & General Manager

2001 Bryan Tower

Dallas, Texas 75201

f

Gentlemen:

l

This refers to the inspection conducted by Mr. R. H.'Brickley of our staff-

during the period of December 13-16, 1982, of activities authorized by NRC

'

!

Construction Permit CPPR-126 for the Comanche Peak, Unit'1, and to the

discussion of our findings with Mr. R. G. Tolson and other members of your

staff at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspector.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements.

Consequently, you are required to respond to

l

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10,-Code of Federal Regulations.

Your response should be based on the specifics contained in the Notice of-

Violation enclosed with this letter.

In accordance with 10 C.FR 2.790(a), a copy of this letter and the enclosures

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within 10 days of the'date of this letter, and submit written

application to withhold information contained therein within 30 days of the

date of this letter. Such application must be consistent with the

requirements of 2.790(b)(1).

l

i

RSS*T8N'

RSS

VPB8

DV

RPS-

RPB

DRR

P

D/E

RA

V~

RBrickley/dsm CHa

UPptapov

a art TWesterman GMadsen JGap

ardgfJ nson(J ' lins

,

i i /83

t

1/tT/83

1/5 783 1/5 /83

/\\ /83 1he /83

1/h /831/ ft/83 [,1/it/83 )

,

I

L

- Po 01

8301280166 830112

-

PDR ADOCK 05000445

(D

PDR

- -- - - . . - - - . - . . . -

. . - .. -

.- -

- - . --- . . . - - . . -.

.

,

JAN 121983

Texas Utilities Generating

2

Company

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

" Original Sign d b

e

y:

G. L. MADSEN9

G. L. Madsen, Chief

Reactor Project Branch 1

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report 50-445/82-30

cc w/encis:

Texas Utilities Generating Company

ATTN:

H. C. Schmidt, Project Manager

2001 Bryan Tower

Dallas, Texas 75201

.

bec to DMB (IE01)

bec distrib. by RIV:

BC

PM

RPB2

Resident Inspector

AEOD

ELD

TPB

Section Chief (RSS)

IE FILE

NRR/DHFS/0LB

MIS SYSTEM

R. Brickley

(

NRR/DSI/RAB

RES

RIV File

T. Westerman

LPDR

NRC PDR

RA

VPB

NSIC

NTIS

C. Wisner

E. Johnson /J. Marshall

TX STATE DEPT. OF HEALTH

Juanita Ellis

David Preister

.

9

4

---o2

-r--

ew er#-wrm .e-w we+e

-

p.-g. ge-wew-9.-

y

e-

r rg < w re e

e-=

n