ML20028E745
| ML20028E745 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 01/12/1983 |
| From: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20028E746 | List: |
| References | |
| NUDOCS 8301280166 | |
| Download: ML20028E745 (2) | |
See also: IR 05000445/1982030
Text
- --
-
-
. .
. . . . .
- . . . - -
~...
..
.
.
.
.
JAN 121983
Docket: 50-445/82-30
Texas Utii tties Generating Company
ATTN:
R. J. Gary, Executive Vice
President & General Manager
2001 Bryan Tower
Dallas, Texas 75201
f
Gentlemen:
l
This refers to the inspection conducted by Mr. R. H.'Brickley of our staff-
during the period of December 13-16, 1982, of activities authorized by NRC
'
!
Construction Permit CPPR-126 for the Comanche Peak, Unit'1, and to the
discussion of our findings with Mr. R. G. Tolson and other members of your
staff at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews
with personnel, and observations by the inspector.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
l
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10,-Code of Federal Regulations.
Your response should be based on the specifics contained in the Notice of-
Violation enclosed with this letter.
In accordance with 10 C.FR 2.790(a), a copy of this letter and the enclosures
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within 10 days of the'date of this letter, and submit written
application to withhold information contained therein within 30 days of the
date of this letter. Such application must be consistent with the
requirements of 2.790(b)(1).
l
i
RSS*T8N'
VPB8
DV
RPS-
RPB
DRR
P
D/E
V~
RBrickley/dsm CHa
UPptapov
a art TWesterman GMadsen JGap
ardgfJ nson(J ' lins
,
i i /83
t
1/tT/83
1/5 783 1/5 /83
/\\ /83 1he /83
1/h /831/ ft/83 [,1/it/83 )
,
I
L
- Po 01
8301280166 830112
-
PDR ADOCK 05000445
(D
- -- - - . . - - - . - . . . -
. . - .. -
.- -
- - . --- . . . - - . . -.
.
,
JAN 121983
Texas Utilities Generating
2
Company
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
" Original Sign d b
e
y:
G. L. MADSEN9
G. L. Madsen, Chief
Reactor Project Branch 1
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report 50-445/82-30
cc w/encis:
Texas Utilities Generating Company
ATTN:
H. C. Schmidt, Project Manager
2001 Bryan Tower
Dallas, Texas 75201
.
bec to DMB (IE01)
bec distrib. by RIV:
RPB2
Resident Inspector
ELD
TPB
Section Chief (RSS)
IE FILE
NRR/DHFS/0LB
MIS SYSTEM
R. Brickley
(
NRR/DSI/RAB
RIV File
T. Westerman
LPDR
NRC PDR
VPB
C. Wisner
E. Johnson /J. Marshall
TX STATE DEPT. OF HEALTH
Juanita Ellis
David Preister
.
9
4
---o2
-r--
ew er#-wrm .e-w we+e
-
p.-g. ge-wew-9.-
y
e-
r rg < w re e
e-=
n