ML20028E700
| ML20028E700 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 01/11/1983 |
| From: | Knop R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gerstner W ILLINOIS POWER CO. |
| Shared Package | |
| ML20028E701 | List: |
| References | |
| NUDOCS 8301280128 | |
| Download: ML20028E700 (2) | |
See also: IR 05000461/1982024
Text
._
.
e
.
'JAN 11 1983
Docket No. 50-461
Illinois Power Company
ATTN:
Mr. W. C. Gerstner
Executive Vice President
500 South 27th Street
Decatur, IL 62525
-
Gentlemen:
This refers to the routine safety inspection conducted by Mr. H.H. Livermore
of this office on November 1 through December 13,1982, of activities at the
Clinton Power Station, Unit 1, authorized by NRC Construction Permit
No. CPPR-137 and to the discussion of our findings with Mr. D. P. Hall at
the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you (or
your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within ten (10)
days from the date of this letter of your intention to file a req' test for
withholding; and (b) submit within twenty-five (25) days from the oc+e of
this letter a written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than seven
(7) days are available for your review, please notify this office promptly
so that a new due date may be established. Consistent with Section 2.790(b)(1),
any such application must be accompanied by an affidavit executed by the
owner of the information which identifies the document or part sought to be
withheld, and which contains a full statement of the reasons which are the
bases for the claim that the information should be withheld from public
0301280128 830111
PDR ADOCK 05000461
G
.
ZE 01
- . _
_
-
-
_
i
.
.
.
Illinois Power Company
2
!
1
disclosure. This section further requires the statement to address with'
specificity the considerations listed in 10 CFR 2.790(b)(4). The informa-
tion sought to be withheld shall be incorporated as far.as possible into
a separate part of the affidavit.
If we do not hear from you in this
regard within the specified periods noted above, a copy of this letter and
the enclosed inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
/{c(d
R. C. Knop, Chi f
Projects Branch 1
i
Enclosure:
Inspection
Report No. 50-461/82-24(DPRP)
cc w/ enc 1:
DMB/ Document Control Desk (RIDS)
!
Resident Inspector, RIII
Karen Borgstadt, Office of
Assistant Attorney General
Gary N. Wright, Manager,
Nuclear Facility Safety
Randall L. Plant, Prairie
,
Alliance
i
4
i
l
?
'
\\
I
i
RI
RI
RIII,
9./p
gcK
Ll ekmore/jp
,J
onski
Knop /5,
l
1 9/83
lj /0
'
. _ . , - _ , _ _ _ _
, _ _ _ _ . .
_
. . , _ _ _ _ _ . . . . _ .
.
, _ _ _
_ _ _
.
-