| Site: | Clinton |
| Issue date: | 01/03/1983 |
| From: | Little W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gerstner W ILLINOIS POWER CO. |
| Shared Package | |
| ML20028E334 | List: |
| References | |
| NUDOCS 8301210232 | |
| Download: ML20028E333 (2) | |
See also: IR 05000461/1982015
Text
+
.
JAfl 3
1983
Docket No. 50-461
Illinois Power Company
AT7N:
Mr. W. C. Gerstner
Executive Vice President
500 South 27th Street
Decatur, IL 62525
Gentlemen:
This refers to the routine safety inspection conducted by Mr. R. S. Love of
this of fice on August 30 through September 3, November 1-5 and December 6-10,
1982, of activities at Clinton Nuclear Power Station, Unit 1, authorized by
NRC Construction Permit No. CPPR-137 and to the discussion of our findings
with you at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
l
please notify this office promptly so that a new due date may be estab-
I
lished. Consistent with Section 2.790(b)(1), any such application must
i
be accompanied by an affidavit executed by the owner of the information
l
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the base s for the
claim that the information should be withheld from public disclosure.
8301210232 830103
PDR ADOCK 05000461
o
/bl
.
-
_ - .
-_
..__- . .- _
-.
_.
.
-
_ - .
, .
Illinois Power Company
2
JM 3
E
.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
<
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above,.a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
k
Sincerely,
i
" Original ctr,cd by U. S. Little"
q
W. S. Little, Chief
Engineering Programs Branch
!
Enclosure:
Inspection Report
No. 50-461/82-15(DETP)
cc w/ enc 1:
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Karen Borgstadt, Office of
Assistant Attorney General
Gary N. Wright, Manager,
Nuclear Facility Safety
Randall L. Plant, Prairie
Alliance
,
i
!
a
i
4
1
RIJI
RIII
RI I
RIII
RI
gy
w
gcd
>
1
,
i
ve/sv
Williams
ayes
Kno
Lt e
)g
12/23/82
gu
i
f
, . . _ . . , - . . . - ,
. . , . . - - , _ . - - .
- - . . - . . .
,.,,-,---.n.
- . , ,
,_, . , . , , , ~ , , , . . - , _ _ _ . -
,_n
--
, , . . , _ - . _ , - - , . , . - - , - - -
- - . . ,
.