ML20028D477

From kanterella
Jump to navigation Jump to search
Proposes Procedure for Handling Reporting of Semiscale Tests SR-1 & SR-2 in Order to Stay within Funding Constraints.Eg&G to DOE Transmitting, Analysis of Primary Feed & Bleed Cooling in PWR Sys Forwarded
ML20028D477
Person / Time
Issue date: 07/06/1982
From: Landry R
Office of Nuclear Reactor Regulation
To: Tiller R
ENERGY, DEPT. OF
Shared Package
ML20027A678 List:
References
FOIA-82-543 NUDOCS 8301190170
Download: ML20028D477 (2)


Text

U.S. liUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REGULATORY RESEARCH UNCLASSIFIED WAShlNGT0li D.C.

20555 DIS M BUT M original Signed ty..

h00 Y l

  • C Ralph R. Landry Chron hanchR/F PALPH R. LANDRY (301 427-4260 X

OEBassett das""

MR. ROBERT E. TILLER, U.S. DEPARTMENT OF ENERGY, IDAHO OPERATIONS OFFICE, 550 SEC0 lid STREET, IDAHO FALLS, IDAHO 83401 TELEX liUMBER:

IliF0: MR. PAUL NORTH, EC&G IDAHO, INCORPORATED, 550 SECOND STREET.

IDAHO FALLS, IDAHO 83401 TELEX NUMBER: 8-583-9539 11R. WILLIS YOUNG, U.S. DEPARTHENT OF ENERGY, IDAHO OPERATIONS OFFICE, 550 SECOND STREET, IDAHO FALLS, IDAHO 83401 TELEX NUMBER: 8-583-9539 IN ORDER TO STAY WITHIN FUNDING CONSTRAINTS AT THIS TIME, PLEASE HANDLE THE REPORTING OF SEMISCALE TESTS SR-1 AND SR-2 IN THE FOLLOWING MANNER.

1.

PU5LISH A NORMAL QLR COVERIliG THE RESULTS OF GREATEST INTEREST AND PRELIMINARY CONCLUSIONS.

2.

DISPENSE WITH THE EDR FOR THE PRESENT.

INCLUDE THE EDR PUBLICATION IN NEXT YEAR'S PROGRAM.

3.

PROVIDE ALL DATA TO THE INEL DATA BANK FOR USE BY THOSE PARTIES NEEDING THE DETAILED RESULTS.

THIS PROCEDURE HAS BEEN DISCUSSED WITH EG&G AND YOUR STAFF AND IS ACCEPT-ABLE TO THEM.

UNCLASSIFIED 01 01 8301190170 821122 PDR FOIA SHOLLY82-543 PDR o"'" >.9.AE,3,EPg,,,,,,QAE,:

h,,,,

l *=" ' >.R iDM.;iol..LHSd.

il9.U.....................

i

  • * " >.7.(pW.E..... 0,?/,(,,/,82,,,,,,

uxc roa. u. iio..o uncu on' OFFICIAL RECORD COPY

.