Category:Letter type:CP
MONTHYEARCP-202400335, License Amendment Request to Adopt TSTF-51, TSTF-471, and TSTF-571-T to Eliminate Use of the Term Core Alterations and Revise Requirements During Handling of Irradiated Fuel2024-09-12012 September 2024 License Amendment Request to Adopt TSTF-51, TSTF-471, and TSTF-571-T to Eliminate Use of the Term Core Alterations and Revise Requirements During Handling of Irradiated Fuel CP-202400294, (CPNPP) - Response to RAI for Exemption Request from 10 CPR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 (CPNPP) - Response to RAI for Exemption Request from 10 CPR 50.71(e)(4) Final Safety Analysis Update Schedule CP-202400319, (CPNPP) - Revision to CPNPP Letter to the NRC, Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality2024-08-13013 August 2024 (CPNPP) - Revision to CPNPP Letter to the NRC, Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality CP-202400315, (Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality2024-08-0505 August 2024 (Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality CP-202400253, (Cpnpp), Units 1 & 2 Inservice Testing Plan for Pumps & Valves Third Interval, Revision 52024-06-26026 June 2024 (Cpnpp), Units 1 & 2 Inservice Testing Plan for Pumps & Valves Third Interval, Revision 5 CP-202400235, (Cpnpp), Units 1 & 2, Inservice Testing Plan for Pumps & Valves Fourth Interval, Revision 02024-06-18018 June 2024 (Cpnpp), Units 1 & 2, Inservice Testing Plan for Pumps & Valves Fourth Interval, Revision 0 CP-202400120, (Cpnpp), Unit 1, Condition Prohibited by Technical Specifications Due to Inoperable Remote Shutdown System Functions2024-06-0303 June 2024 (Cpnpp), Unit 1, Condition Prohibited by Technical Specifications Due to Inoperable Remote Shutdown System Functions CP-202400205, (Cpnpp), Units 1and 2, Submittal of the Snubber Inservice Program Plan for the Fourth Ten Year Interval2024-05-30030 May 2024 (Cpnpp), Units 1and 2, Submittal of the Snubber Inservice Program Plan for the Fourth Ten Year Interval CP-202400175, (CPNPP) - Supplement to License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator2024-05-16016 May 2024 (CPNPP) - Supplement to License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator CP-202400100, (Cpnpp), Unit 2, Two Recurring Reactor Scrams Associated with Main Feedwater System Modifications2024-05-13013 May 2024 (Cpnpp), Unit 2, Two Recurring Reactor Scrams Associated with Main Feedwater System Modifications CP-202400097, Re Potential Loss of Safety Function Due to Inoperability of Both Trains of Uninterruptible Power Supply Heating, Ventilation & Air Conditioning2024-05-0606 May 2024 Re Potential Loss of Safety Function Due to Inoperability of Both Trains of Uninterruptible Power Supply Heating, Ventilation & Air Conditioning CP-202400153, (Cpnpp), Registration of Dry Spent Fuel Storage Canisters2024-04-29029 April 2024 (Cpnpp), Registration of Dry Spent Fuel Storage Canisters CP-202400107, (CPNPP) - 2023 Annual Radiological Environmental Operating Report2024-04-18018 April 2024 (CPNPP) - 2023 Annual Radiological Environmental Operating Report CP-202400099, (CPNPP) - Registration of Dry Spent Fuel Storage Canisters2024-04-0909 April 2024 (CPNPP) - Registration of Dry Spent Fuel Storage Canisters CP-202400092, (CPNPP) - Supplement to Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-04-0101 April 2024 (CPNPP) - Supplement to Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program CP-202400089, Property Damage Insurance2024-03-25025 March 2024 Property Damage Insurance CP-202400087, (CPNPP) - Notification of Deviation from Electric Power Research Institute (EPRI) MRP 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in Non-Isolatable2024-03-21021 March 2024 (CPNPP) - Notification of Deviation from Electric Power Research Institute (EPRI) MRP 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in Non-Isolatable CP-202400085, (CPNPP) - Revised Requested Compliance Date - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-03-0707 March 2024 (CPNPP) - Revised Requested Compliance Date - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CP-202400073, (CPNPP) - Response to RAI for License Amendment Request to Extend Allowed Outage Time for an Inoperable Emergency Diesel Generator2024-03-0404 March 2024 (CPNPP) - Response to RAI for License Amendment Request to Extend Allowed Outage Time for an Inoperable Emergency Diesel Generator CP-202400072, (Cpnpp), Unit 1, Special Report 1-SR-24-001-00, Inoperable Post Accident Monitoring Instrumentation2024-02-29029 February 2024 (Cpnpp), Unit 1, Special Report 1-SR-24-001-00, Inoperable Post Accident Monitoring Instrumentation CP-202300470, (Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-02-28028 February 2024 (Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown CP-202300474, (Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-02-28028 February 2024 (Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions CP-202400063, (CPNPP) - Inservice Inspection (ISI) Owners Activity Reports (OAR-1 Forms) for Unit 1 Refueling Outage 23 (1RF23)2024-02-12012 February 2024 (CPNPP) - Inservice Inspection (ISI) Owners Activity Reports (OAR-1 Forms) for Unit 1 Refueling Outage 23 (1RF23) CP-202400030, License Renewal Application Revision 0 - Supplement 3, Revision 12024-01-31031 January 2024 License Renewal Application Revision 0 - Supplement 3, Revision 1 CP-202400034, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1)2024-01-29029 January 2024 (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1) CP-202300575, (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 22023-12-13013 December 2023 (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 2 CP-202300566, (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation2023-12-12012 December 2023 (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation CP-202300494, License Renewal Application Revision 0, Supplement 32023-12-0606 December 2023 License Renewal Application Revision 0, Supplement 3 CP-202300349, License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation2023-11-20020 November 2023 License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation CP-202300416, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements2023-10-12012 October 2023 Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements CP-202300432, Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 42023-10-0404 October 2023 Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 4 CP-202300442, (CPNPP) - Request to Use Later Code Edition for Inservice Inspection (ISI) Program2023-09-15015 September 2023 (CPNPP) - Request to Use Later Code Edition for Inservice Inspection (ISI) Program CP-202300391, (CPNPP) - Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2023-08-24024 August 2023 (CPNPP) - Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule CP-202300361, (CPNPP) - Unit 2 Refueling Outage 20 (2RF20) Steam Generator 180 Day Report2023-08-17017 August 2023 (CPNPP) - Unit 2 Refueling Outage 20 (2RF20) Steam Generator 180 Day Report CP-202300411, (Cpnpp), Inservice Inspection (ISI) Owner'S Activity Reports (OAR-1 Forms) for Unit 2 Refueling Outage 20 (2RF20)2023-08-17017 August 2023 (Cpnpp), Inservice Inspection (ISI) Owner'S Activity Reports (OAR-1 Forms) for Unit 2 Refueling Outage 20 (2RF20) CP-202300401, 10CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 0182023-08-15015 August 2023 10CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 018 CP-202300358, (Cpnpp), Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 1122023-08-0101 August 2023 (Cpnpp), Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 112 CP-202300322, Response to Requests for Additional Information Regarding Review of the License Renewal Application Sets 2 and 32023-07-27027 July 2023 Response to Requests for Additional Information Regarding Review of the License Renewal Application Sets 2 and 3 CP-202300348, (Cpnpp), Transmittal of Revised Emergency Plan (Revision 48)2023-07-18018 July 2023 (Cpnpp), Transmittal of Revised Emergency Plan (Revision 48) CP-202300285, Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 12023-07-12012 July 2023 Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 1 CP-202300262, Response to Request for Confirmation of Information Regarding Review of the License Renewal Application - Set 22023-06-20020 June 2023 Response to Request for Confirmation of Information Regarding Review of the License Renewal Application - Set 2 CP-202300263, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements2023-06-15015 June 2023 Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements CP-202300248, Response to Request for Additional Information Regarding License Renewal Application - Set 12023-06-13013 June 2023 Response to Request for Additional Information Regarding License Renewal Application - Set 1 CP-202300209, Response to Request for Additional Information - License Renewal Application Environmental Review2023-06-0606 June 2023 Response to Request for Additional Information - License Renewal Application Environmental Review CP-202300207, Revision to Comanche Peak Nuclear Power Plant'S Response to Notice of Violation (NOV) 05000445/2021011-052023-05-25025 May 2023 Revision to Comanche Peak Nuclear Power Plant'S Response to Notice of Violation (NOV) 05000445/2021011-05 CP-202300182, Response to Requests for Confirmation of Information Regarding the Environmental Review of the License Renewal Application2023-05-0808 May 2023 Response to Requests for Confirmation of Information Regarding the Environmental Review of the License Renewal Application CP-202300201, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 0)2023-05-0404 May 2023 (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 0) CP-202300160, (Cpnpp), 2022 Annual Radiological Environmental Operating Report2023-04-27027 April 2023 (Cpnpp), 2022 Annual Radiological Environmental Operating Report CP-202300159, (Cpnpp), 2022 Annual Radiological Effluent Release Report2023-04-27027 April 2023 (Cpnpp), 2022 Annual Radiological Effluent Release Report 2024-09-12
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARCP-202400335, License Amendment Request to Adopt TSTF-51, TSTF-471, and TSTF-571-T to Eliminate Use of the Term Core Alterations and Revise Requirements During Handling of Irradiated Fuel2024-09-12012 September 2024 License Amendment Request to Adopt TSTF-51, TSTF-471, and TSTF-571-T to Eliminate Use of the Term Core Alterations and Revise Requirements During Handling of Irradiated Fuel ML24194A1332024-08-28028 August 2024 Issuance of Amendment Nos. 190 and 190, Respectively, Revision to Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown CP-202400030, License Renewal Application Revision 0 - Supplement 3, Revision 12024-01-31031 January 2024 License Renewal Application Revision 0 - Supplement 3, Revision 1 ML24023A0242024-01-24024 January 2024 Correction to Amendment Nos. 185 and 185 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident Methodology CP-202300494, License Renewal Application Revision 0, Supplement 32023-12-0606 December 2023 License Renewal Application Revision 0, Supplement 3 CP-202300349, License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation2023-11-20020 November 2023 License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation CP-202300293, (CPNPP) - License Amendment Request Proposing Changes to Technical Specifications to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days2023-09-14014 September 2023 (CPNPP) - License Amendment Request Proposing Changes to Technical Specifications to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments CP-202300165, License Renewal Application Revision 0 - Supplement 22023-04-24024 April 2023 License Renewal Application Revision 0 - Supplement 2 CP-202300096, License Amendment Request (LAR) 23-002 Application Regarding GDC-5 Shared Systems Requirements2023-04-20020 April 2023 License Amendment Request (LAR) 23-002 Application Regarding GDC-5 Shared Systems Requirements CP-202300140, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors. LAR 23-0012023-04-19019 April 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors. LAR 23-001 CP-202300157, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-14014 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments CP-202300135, License Renewal Application Revision 0 - Supplement 12023-04-0606 April 2023 License Renewal Application Revision 0 - Supplement 1 CP-202200380, (CPNPP) - Non-Voluntary License Amendment Request to Revise Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications2022-11-21021 November 2022 (CPNPP) - Non-Voluntary License Amendment Request to Revise Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications CP-202200355, Application to Revise Technical Specifications to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model LAR 22-0022022-11-21021 November 2022 Application to Revise Technical Specifications to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model LAR 22-002 CP-202200350, Facility Operating License Numbers NPF-87 and NPF-89 - License Renewal Application - Appendix E, Environmental Report2022-10-0303 October 2022 Facility Operating License Numbers NPF-87 and NPF-89 - License Renewal Application - Appendix E, Environmental Report ML22192A0072022-08-22022 August 2022 Issuance of Amendment Nos. 183 and 183 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2 CP-202200273, Third Supplement to License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative2022-07-20020 July 2022 Third Supplement to License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative CP-202200006, (CPNPP) - Second Supplement to License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended.2022-02-17017 February 2022 (CPNPP) - Second Supplement to License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended. CP-202200075, Third Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections2022-02-15015 February 2022 Third Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections CP-202100575, (CPNPP) - Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections2021-08-31031 August 2021 (CPNPP) - Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections CP-202100251, (CPNPP) - Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections2021-07-27027 July 2021 (CPNPP) - Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections CP-202100394, Supplement to License Amendment Request (LAR) 20-0062021-07-13013 July 2021 Supplement to License Amendment Request (LAR) 20-006 CP-202100065, Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2021-05-11011 May 2021 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b CP-202000585, (CPNPP) - Supplement to License Amendment Request (LAR) 20-005, Revision to Technical Specification (TS) 3.6.8, Containment Sump2021-01-27027 January 2021 (CPNPP) - Supplement to License Amendment Request (LAR) 20-005, Revision to Technical Specification (TS) 3.6.8, Containment Sump CP-202000584, (CPNPP) - Supplement to License Amendment Request (LAR) 15-001, Revision to Technical Specification (TS) 3.8.l, AC SOURCES-OPERATING2020-12-0909 December 2020 (CPNPP) - Supplement to License Amendment Request (LAR) 15-001, Revision to Technical Specification (TS) 3.8.l, AC SOURCES-OPERATING CP-202000575, (CPNPP) - Exigent License Amendment Request (LAR) 20-007 Revision to Technical Specification (TS) 3.7.8, Station Service Water System and TS 3.8.1, AC Sources - Operating2020-11-19019 November 2020 (CPNPP) - Exigent License Amendment Request (LAR) 20-007 Revision to Technical Specification (TS) 3.7.8, Station Service Water System and TS 3.8.1, AC Sources - Operating CP-202000365, Luminant, Comamche Leak Nuclear Power Plant, License Amendment Request 20-005, New Technical Specification 3.6.8, Containment Sump2020-08-31031 August 2020 Luminant, Comamche Leak Nuclear Power Plant, License Amendment Request 20-005, New Technical Specification 3.6.8, Containment Sump CP-202000401, (CPNPP) - Supplement to Exigent License Amendment Request (LAR) 20-002, Revision to Technical Specification (TS) 3.7.19, Safety Chilled Water2020-07-28028 July 2020 (CPNPP) - Supplement to Exigent License Amendment Request (LAR) 20-002, Revision to Technical Specification (TS) 3.7.19, Safety Chilled Water CP-202000388, (CPNPP) - Supplement to Exigent License Amendment Request (LAR) 20-002, Revision to Technical Specification (TS) 3.7.19, Safety Chilled Water2020-07-16016 July 2020 (CPNPP) - Supplement to Exigent License Amendment Request (LAR) 20-002, Revision to Technical Specification (TS) 3.7.19, Safety Chilled Water CP-202000321, (CPNPP) - License Amendment Request (LAR) 20-001 Technical Specification (TS) 1.1, Definitions - ESP & RTS Response Time2020-07-0202 July 2020 (CPNPP) - License Amendment Request (LAR) 20-001 Technical Specification (TS) 1.1, Definitions - ESP & RTS Response Time CP-202000305, (CPNPP) - Exigent License Amendment Request (LAR) 20-002 Revision to Technical Specification (TS) 3.7.19, Safety Chilled Water2020-06-24024 June 2020 (CPNPP) - Exigent License Amendment Request (LAR) 20-002 Revision to Technical Specification (TS) 3.7.19, Safety Chilled Water TXX-2002, Exigent License Amendment Request (LAR) 20-003 Revision to Technical Specification (TS) 5.5.9, Unit 1 Model D76 and Unit 2 Model D5 Steam Generator Program2020-04-10010 April 2020 Exigent License Amendment Request (LAR) 20-003 Revision to Technical Specification (TS) 5.5.9, Unit 1 Model D76 and Unit 2 Model D5 Steam Generator Program CP-201900368, Revision to Technical Specifications 3.8.1, AC Sources - Operating2020-03-31031 March 2020 Revision to Technical Specifications 3.8.1, AC Sources - Operating CP-202000016, Editorial Correction to License Amendment Request (LAR) 19-002 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program.2020-01-16016 January 2020 Editorial Correction to License Amendment Request (LAR) 19-002 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program. CP-201900415, License Amendment Request (LAR) 19-002, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-11-0707 November 2019 License Amendment Request (LAR) 19-002, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program CP-201900393, License Amendment Request (LAR) 19-001, Application to Adopt TSTF-513-A, Revision 3, PWR Operability Requirements and Actions for RCS Leakage Instrumentation2019-11-0707 November 2019 License Amendment Request (LAR) 19-001, Application to Adopt TSTF-513-A, Revision 3, PWR Operability Requirements and Actions for RCS Leakage Instrumentation CP-201800115, License Amendment Request 17-001 Revision to Technical Specification 3.3.2. ESFAS Instrumentation2018-03-29029 March 2018 License Amendment Request 17-001 Revision to Technical Specification 3.3.2. ESFAS Instrumentation ML17074A4942017-04-13013 April 2017 Issuance of Amendment Nos. 168 and 168 Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML16351A2002016-12-14014 December 2016 Submittal of License Amendment Request 16-003, Administrative Change to License Name CP-201600216, License Amendment Request 16-001, Application to Revise Technical Specifications to Adopt TSF-545, Revision 3, TS Inservice Testing Program Removal and Clarify SR Usage Rule Application to Section 5.5 Testing.2016-04-27027 April 2016 License Amendment Request 16-001, Application to Revise Technical Specifications to Adopt TSF-545, Revision 3, TS Inservice Testing Program Removal and Clarify SR Usage Rule Application to Section 5.5 Testing. CP-201501062, ISFSI - Application for Order Approving Transfer of Licenses and Conforming License Amendments2015-11-12012 November 2015 ISFSI - Application for Order Approving Transfer of Licenses and Conforming License Amendments CP-201400165, (CPNPP) - Redacted Version of License Amendment Request (LAR) 13-003, for Approval of the Revised CPNPP Cyber Security Plan Implementation Schedule2014-02-0404 February 2014 (CPNPP) - Redacted Version of License Amendment Request (LAR) 13-003, for Approval of the Revised CPNPP Cyber Security Plan Implementation Schedule CP-201301322, License Amendment Request (LAR) 13-003, for Approval of the Revised CPNPP Cyber Security Plan Implementation Schedule2013-11-21021 November 2013 License Amendment Request (LAR) 13-003, for Approval of the Revised CPNPP Cyber Security Plan Implementation Schedule CP-201301065, Revision to Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process2013-08-29029 August 2013 Revision to Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process CP-201300738, License Amendment Request 13-002, Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item..2013-07-10010 July 2013 License Amendment Request 13-002, Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item.. CP-201300257, License Amendment Request (LAR) 13-01, Revision to Technical Specifications 3.7.16, Fuel Storage Pool Boron Concentration, 3.7.17, Spent Fuel Assembly Storage, 4.3, Fuel Storage, and 5.5 Programs & Manuals.2013-03-28028 March 2013 License Amendment Request (LAR) 13-01, Revision to Technical Specifications 3.7.16, Fuel Storage Pool Boron Concentration, 3.7.17, Spent Fuel Assembly Storage, 4.3, Fuel Storage, and 5.5 Programs & Manuals. CP-201300083, License Amendment Request 12-06, Revision to Technical Specifications 3.7.16, Fuel Storage Pool Boron Concentration, 3.7.17, Spent Fuel Assembly Storage and 5.5 Programs and Manuals.2013-01-15015 January 2013 License Amendment Request 12-06, Revision to Technical Specifications 3.7.16, Fuel Storage Pool Boron Concentration, 3.7.17, Spent Fuel Assembly Storage and 5.5 Programs and Manuals. CP-201200518, License Amendment Request (LAR) 12-004, Revision to Technical Specification 3.8.1, Ac Sources - Operating, for Two, 14-Day Completion Times for Offsite Circuits2012-10-0202 October 2012 License Amendment Request (LAR) 12-004, Revision to Technical Specification 3.8.1, Ac Sources - Operating, for Two, 14-Day Completion Times for Offsite Circuits CP-201200552, License Amendment Request (LAR) 2012-001, Revision to Technical Specification 5.7, High Radiation Area and Technical Specifications Table 3.3.3-12012-07-12012 July 2012 License Amendment Request (LAR) 2012-001, Revision to Technical Specification 5.7, High Radiation Area and Technical Specifications Table 3.3.3-1 2024-09-12
[Table view] Category:Technical Specification
MONTHYEARCP-202300470, (Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-02-28028 February 2024 (Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown CP-202300474, (Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-02-28028 February 2024 (Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program CP-202300293, (CPNPP) - License Amendment Request Proposing Changes to Technical Specifications to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days2023-09-14014 September 2023 (CPNPP) - License Amendment Request Proposing Changes to Technical Specifications to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days CP-202300096, License Amendment Request (LAR) 23-002 Application Regarding GDC-5 Shared Systems Requirements2023-04-20020 April 2023 License Amendment Request (LAR) 23-002 Application Regarding GDC-5 Shared Systems Requirements CP-202200380, (CPNPP) - Non-Voluntary License Amendment Request to Revise Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications2022-11-21021 November 2022 (CPNPP) - Non-Voluntary License Amendment Request to Revise Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications CP-202200355, Application to Revise Technical Specifications to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model LAR 22-0022022-11-21021 November 2022 Application to Revise Technical Specifications to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model LAR 22-002 CP-202200075, Third Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections2022-02-15015 February 2022 Third Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections ML22038A1642022-02-0101 February 2022 Technical Specification Bases, Revision 83 CP-202100694, (CPNPP) - NRC Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections2021-10-25025 October 2021 (CPNPP) - NRC Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections CP-202100394, Supplement to License Amendment Request (LAR) 20-0062021-07-13013 July 2021 Supplement to License Amendment Request (LAR) 20-006 CP-202000585, (CPNPP) - Supplement to License Amendment Request (LAR) 20-005, Revision to Technical Specification (TS) 3.6.8, Containment Sump2021-01-27027 January 2021 (CPNPP) - Supplement to License Amendment Request (LAR) 20-005, Revision to Technical Specification (TS) 3.6.8, Containment Sump ML20226A4292020-08-0303 August 2020 Technical Specifications Bases, Revision 78 CP-202000388, (CPNPP) - Supplement to Exigent License Amendment Request (LAR) 20-002, Revision to Technical Specification (TS) 3.7.19, Safety Chilled Water2020-07-16016 July 2020 (CPNPP) - Supplement to Exigent License Amendment Request (LAR) 20-002, Revision to Technical Specification (TS) 3.7.19, Safety Chilled Water CP-201900368, Revision to Technical Specifications 3.8.1, AC Sources - Operating2020-03-31031 March 2020 Revision to Technical Specifications 3.8.1, AC Sources - Operating CP-202000016, Editorial Correction to License Amendment Request (LAR) 19-002 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program.2020-01-16016 January 2020 Editorial Correction to License Amendment Request (LAR) 19-002 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program. CP-201900393, License Amendment Request (LAR) 19-001, Application to Adopt TSTF-513-A, Revision 3, PWR Operability Requirements and Actions for RCS Leakage Instrumentation2019-11-0707 November 2019 License Amendment Request (LAR) 19-001, Application to Adopt TSTF-513-A, Revision 3, PWR Operability Requirements and Actions for RCS Leakage Instrumentation CP-201900415, License Amendment Request (LAR) 19-002, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-11-0707 November 2019 License Amendment Request (LAR) 19-002, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program CP-201800115, License Amendment Request 17-001 Revision to Technical Specification 3.3.2. ESFAS Instrumentation2018-03-29029 March 2018 License Amendment Request 17-001 Revision to Technical Specification 3.3.2. ESFAS Instrumentation ML15191A1632015-06-24024 June 2015 EPP-201, Emergency Action Level Technical Bases Document(Clean Version) ML15191A1642015-06-24024 June 2015 Emergency Action Level Technical Bases (Redline and Strikeout Version) CP-201400632, License Amendment Request (LAR) 14-001, Revision to TS 3.8.1, AC Sources - Operating, for a 14-Day Completion Time for Offsite Circuits2014-07-0101 July 2014 License Amendment Request (LAR) 14-001, Revision to TS 3.8.1, AC Sources - Operating, for a 14-Day Completion Time for Offsite Circuits CP-201400231, Supplement to License Amendment Request 13-002 Revision to Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using Consolidated Line.2014-02-19019 February 2014 Supplement to License Amendment Request 13-002 Revision to Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using Consolidated Line. ML14063A2812014-02-19019 February 2014 Supplement to License Amendment Request 13-002 Revision to Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated. ML13071A3912013-02-21021 February 2013 Technical Specifications Bases CP-201300130, Comanche Peak, Units 1 & 2, Technical Specification Bases, Revision 672013-02-0404 February 2013 Comanche Peak, Units 1 & 2, Technical Specification Bases, Revision 67 ML13043A0392013-02-0404 February 2013 Technical Specification Bases, Revision 67 CP-201201518, License Amendment Request (LAR) 12-007, Revision to Technical Specification 3.8.1, AC Sources - Operating, for Two 14-Day Completion Times for Offsite Circuits2012-12-19019 December 2012 License Amendment Request (LAR) 12-007, Revision to Technical Specification 3.8.1, AC Sources - Operating, for Two 14-Day Completion Times for Offsite Circuits CP-201101663, License Amendment Request (LAR)11-003 for Adopting of TSTF-491, Rev. 2, Removal of the Main Steam and Main Feedwater Valve Isolation Time from Tech Specs Using Consolidated Line Item Improvement Process.2011-12-13013 December 2011 License Amendment Request (LAR)11-003 for Adopting of TSTF-491, Rev. 2, Removal of the Main Steam and Main Feedwater Valve Isolation Time from Tech Specs Using Consolidated Line Item Improvement Process. CP-201101065, Comanche Peak Units 1 & 2 Final Safety Analysis Report (Fsar), Amendment 104, Technical Specifications Bases2011-08-0101 August 2011 Comanche Peak Units 1 & 2 Final Safety Analysis Report (Fsar), Amendment 104, Technical Specifications Bases ML11237A1272011-08-0101 August 2011 Comanche Peak Units 1 & 2 Final Safety Analysis Report (Fsar), Amendment 104, Technical Specifications Bases CP-200900748, Comanche Peak - License Amendment Request 09-007, Model D5 Steam Generator Alternate Repair Criteria2009-06-0808 June 2009 Comanche Peak - License Amendment Request 09-007, Model D5 Steam Generator Alternate Repair Criteria ML0916701542009-06-0808 June 2009 Comanche Peak - License Amendment Request 09-007, Model D5 Steam Generator Alternate Repair Criteria CP-200900492, License Amendment Request (LAR) 09-005, Revision to Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation2009-04-0202 April 2009 License Amendment Request (LAR) 09-005, Revision to Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation CP-200900262, License Amendment Request (LAR) 09-001, Administrative Revision to Operating Licenses and Technical Specifications2009-02-11011 February 2009 License Amendment Request (LAR) 09-001, Administrative Revision to Operating Licenses and Technical Specifications ML0823212782008-08-0101 August 2008 Technical Specification Bases for Comanche Peak Steam Electric Station Units 1 & 2 CP-200801015, Technical Specification Bases for Comanche Peak Steam Electric Station Units 1 & 22008-08-0101 August 2008 Technical Specification Bases for Comanche Peak Steam Electric Station Units 1 & 2 CP-200800124, Supplement to License Amendment Request (LAR) 07-004 Revision to the Operating License and Technical Specification 1.0, Use and Application to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt2008-01-31031 January 2008 Supplement to License Amendment Request (LAR) 07-004 Revision to the Operating License and Technical Specification 1.0, Use and Application to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt ML0734000472008-01-25025 January 2008 Tech Spec Pages for Amendment Nos. 142 & 142, Revision to Technical Specifications 3.7.5, 3.8.1 and 3.8.9 and TS Example 1.3-3 CPSES-200700605, License Amendment Request (LAR) 07-003, Revision to Technical Specifications 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, & 5.6.5b, Core Operating Limits Report2007-04-10010 April 2007 License Amendment Request (LAR) 07-003, Revision to Technical Specifications 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, & 5.6.5b, Core Operating Limits Report ML0707101102007-03-20020 March 2007 Technical Specification Pages Re Administrative Controls ML0703208272007-02-22022 February 2007 Technical Specification Pages Re Reactor Coolant System Pressure & Temperature Limits Report CPSES-200602131, License Amendment Request 06-011, to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using Consolidated Line Item Improvement Process2006-10-23023 October 2006 License Amendment Request 06-011, to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using Consolidated Line Item Improvement Process CPSES-200601634, License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Diesel Generators2006-10-13013 October 2006 License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Diesel Generators ML0624404202006-08-25025 August 2006 Supplement to License Amendment Request (LAR) 05-010 and Response to Request for Information ML0611600642006-04-24024 April 2006 Technical Specification Pages 3.7.5 for Auxiliary Feedwater System ML0609000192006-03-30030 March 2006 Technical Specification Pages Re RWST Low Setpoint ML0607504522006-03-15015 March 2006 Technical Specification Pages Re EDG Surveillance CPSES-200502434, Licence Amendment Request (LAR) 05-010, Revision to Technical Specification 3.3.2, ESFAS Instrumentation, 3.5.2, ECCS-Operating, and 3.6.7, Spray Additive System.2005-12-16016 December 2005 Licence Amendment Request (LAR) 05-010, Revision to Technical Specification 3.3.2, ESFAS Instrumentation, 3.5.2, ECCS-Operating, and 3.6.7, Spray Additive System. ML0512200562005-04-21021 April 2005 Technical Specification Pages Hydrogen Recombiners CPSES-200500155, License Amendment Request (LAR) 04-015 Revision to Technical Specification 3.3.1 Reactor Trip System Instrumentation and 3.3.2 Engineered Safety Feature Actuation System Instrumentation (Esffas)2005-03-24024 March 2005 License Amendment Request (LAR) 04-015 Revision to Technical Specification 3.3.1 Reactor Trip System Instrumentation and 3.3.2 Engineered Safety Feature Actuation System Instrumentation (Esffas) 2024-02-28
[Table view] Category:Amendment
MONTHYEARCP-202300293, (CPNPP) - License Amendment Request Proposing Changes to Technical Specifications to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days2023-09-14014 September 2023 (CPNPP) - License Amendment Request Proposing Changes to Technical Specifications to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days CP-202200380, (CPNPP) - Non-Voluntary License Amendment Request to Revise Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications2022-11-21021 November 2022 (CPNPP) - Non-Voluntary License Amendment Request to Revise Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications CP-202200355, Application to Revise Technical Specifications to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model LAR 22-0022022-11-21021 November 2022 Application to Revise Technical Specifications to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model LAR 22-002 CP-202200075, Third Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections2022-02-15015 February 2022 Third Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections CP-202100694, (CPNPP) - NRC Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections2021-10-25025 October 2021 (CPNPP) - NRC Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections CP-202100394, Supplement to License Amendment Request (LAR) 20-0062021-07-13013 July 2021 Supplement to License Amendment Request (LAR) 20-006 CP-202000388, (CPNPP) - Supplement to Exigent License Amendment Request (LAR) 20-002, Revision to Technical Specification (TS) 3.7.19, Safety Chilled Water2020-07-16016 July 2020 (CPNPP) - Supplement to Exigent License Amendment Request (LAR) 20-002, Revision to Technical Specification (TS) 3.7.19, Safety Chilled Water CP-202000016, Editorial Correction to License Amendment Request (LAR) 19-002 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program.2020-01-16016 January 2020 Editorial Correction to License Amendment Request (LAR) 19-002 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program. CP-201400632, License Amendment Request (LAR) 14-001, Revision to TS 3.8.1, AC Sources - Operating, for a 14-Day Completion Time for Offsite Circuits2014-07-0101 July 2014 License Amendment Request (LAR) 14-001, Revision to TS 3.8.1, AC Sources - Operating, for a 14-Day Completion Time for Offsite Circuits ML14063A2812014-02-19019 February 2014 Supplement to License Amendment Request 13-002 Revision to Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated. ML0916701542009-06-0808 June 2009 Comanche Peak - License Amendment Request 09-007, Model D5 Steam Generator Alternate Repair Criteria CP-200900748, Comanche Peak - License Amendment Request 09-007, Model D5 Steam Generator Alternate Repair Criteria2009-06-0808 June 2009 Comanche Peak - License Amendment Request 09-007, Model D5 Steam Generator Alternate Repair Criteria CP-200900492, License Amendment Request (LAR) 09-005, Revision to Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation2009-04-0202 April 2009 License Amendment Request (LAR) 09-005, Revision to Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation CP-200900262, License Amendment Request (LAR) 09-001, Administrative Revision to Operating Licenses and Technical Specifications2009-02-11011 February 2009 License Amendment Request (LAR) 09-001, Administrative Revision to Operating Licenses and Technical Specifications CP-200800124, Supplement to License Amendment Request (LAR) 07-004 Revision to the Operating License and Technical Specification 1.0, Use and Application to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt2008-01-31031 January 2008 Supplement to License Amendment Request (LAR) 07-004 Revision to the Operating License and Technical Specification 1.0, Use and Application to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt ML0734000472008-01-25025 January 2008 Tech Spec Pages for Amendment Nos. 142 & 142, Revision to Technical Specifications 3.7.5, 3.8.1 and 3.8.9 and TS Example 1.3-3 CPSES-200700605, License Amendment Request (LAR) 07-003, Revision to Technical Specifications 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, & 5.6.5b, Core Operating Limits Report2007-04-10010 April 2007 License Amendment Request (LAR) 07-003, Revision to Technical Specifications 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, & 5.6.5b, Core Operating Limits Report ML0703208272007-02-22022 February 2007 Technical Specification Pages Re Reactor Coolant System Pressure & Temperature Limits Report CPSES-200602131, License Amendment Request 06-011, to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using Consolidated Line Item Improvement Process2006-10-23023 October 2006 License Amendment Request 06-011, to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using Consolidated Line Item Improvement Process CPSES-200601634, License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Diesel Generators2006-10-13013 October 2006 License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Diesel Generators ML0624404202006-08-25025 August 2006 Supplement to License Amendment Request (LAR) 05-010 and Response to Request for Information ML0611600642006-04-24024 April 2006 Technical Specification Pages 3.7.5 for Auxiliary Feedwater System ML0609000192006-03-30030 March 2006 Technical Specification Pages Re RWST Low Setpoint ML0607504522006-03-15015 March 2006 Technical Specification Pages Re EDG Surveillance ML0512200562005-04-21021 April 2005 Technical Specification Pages Hydrogen Recombiners CPSES-200401839, License Amendment Request 02-07 Revision to Technical Specification (TS) 3.8.1 Surveillance Requirement Mode Restriction2004-10-0606 October 2004 License Amendment Request 02-07 Revision to Technical Specification (TS) 3.8.1 Surveillance Requirement Mode Restriction CPSES-200401863, License Amendment Request LAR 04-05 Change to Technical Specification 3.7.10, Control Room Emergency Filtration/Pressurization System2004-08-0505 August 2004 License Amendment Request LAR 04-05 Change to Technical Specification 3.7.10, Control Room Emergency Filtration/Pressurization System ML0403602232004-01-23023 January 2004 Tech Spec Pages for Amendment Nos. 109 and 109, Increasing Flexibility in Mode Restraints CPSES-200400148, Submittal of Revised Contractor Report Related to License Amendment Request 03-03, Revision to Technical Specification (TS) 5.5.9 Steam Generator Tube Repair Using Leak Limiting Alloy 800 Sleeves2004-01-21021 January 2004 Submittal of Revised Contractor Report Related to License Amendment Request 03-03, Revision to Technical Specification (TS) 5.5.9 Steam Generator Tube Repair Using Leak Limiting Alloy 800 Sleeves ML0317505522003-06-24024 June 2003 Amendment No. 105 and 105, Technical Specifications, Removal of Suspension of Positive Reactivity Additions CPSES-200300266, License Amendment Request 02-06, Revision to Technical Specifications Associated with DC Electrical Power Systems2003-06-0606 June 2003 License Amendment Request 02-06, Revision to Technical Specifications Associated with DC Electrical Power Systems CPSES-200203192, Request for Additional Information Re License Amendment Request (LAR) 01-012, Steam Generator Tube Repair Using Leak Tight Sleeves2002-08-29029 August 2002 Request for Additional Information Re License Amendment Request (LAR) 01-012, Steam Generator Tube Repair Using Leak Tight Sleeves ML0208702062002-03-26026 March 2002 Tech Spec Page, Amendment No. 95 ML0205305562002-02-20020 February 2002 Technical Specification Amend Re Containment Penetration ML0201702122002-01-15015 January 2002 Technical Specifications Pages Amendment 91 Revising to Eliminate Requirements for Post Accident Sampling System 2023-09-14