Tech Spec Change Request 114 to License DPR-50 to Allow Installation of Increased Range post-accident Monitors in Accordance w/NUREG-0737,Item II.F.1.1
ML20028C852
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 01/05/1983
From: Hukill H
GENERAL PUBLIC UTILITIES CORP.
To:
Shared Package
ML20028C848 List:
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.F.1, TASK-TM NUDOCS 8301140226
Download: ML20028C852 (3)


Text

..

Y METROPOLITAN EDISON COMPANY

-JERSEY CENTRAL POWER & LIGHT COMPANY

-AND

-PENNSYLVANIA ELECTRIC COMPANY THREE HILE ISLAND NUCLEAR STATION, UNIT'l Operating License No. DPR-50 Docket No. 50-289 Technical Specification Change Request No. 114 This Technical' Specification Change Request-is submitted in support of Licensee's request to change Appendix A to Operating License No.

DPR-50 for Three Mile Island Nuclear Station, Unit 1. As a part of this request, proposed replacement pages for Appendix A are also included.

GPU NUCLEAR CORPORATION

/ -

k 0 By N p Director, TMI-l Sworn and subscribed to before me this %

dap of A ..... , 1982.

' , - e

_gg g. a A u . ._,

botaVy Public '

DAR1biAh Bf kRY. NQ1ARY PUBUC MIDDI(10W1 BOR0 DAur'HIN COUNTY tM C0vvisWCN t1PIRIS JUNE 17. lSFS Mumact; Pew.,pama Assutut.o3 cf Nota'us ,

7; , .

~ ~

~

y- _

N' ,

'Qs

_. w i

-. r UNITED STATES OF-AMERICA'.

- NUCLEAR-REGULATORY ~ COMMISSION' .

p

-IN-THE MATTER OF 1 DOCKET NO. 50-289 -

LICENSE NO. DPR-50 GPU NUCLEAR' CORPORATION-'

This is to certify that a copy of Technical' Specification Change _ Request- .

No.114 to Appendix 1 A 1 .of the-Operating License for Three Mile: Island r

~

Nuclear Station Unit 1, has, on the date given below, been filed with-  :'

the U. S. Nuclear Regulatory Commission and been served on the chief executives of Londonderry Township, Dauphin County, Pennsylvania and Dauphin County, Pennsylvaria by deposit in the l'nited' States mail,---

addressed as follows:-

Mr. Jay H. Kopp,. Chairman Mr. John E. Minnich,- Chairman Board of Supervisors of Board of. County Commissioners Londonderry Township of Dauphin County.

R.D. #1, Geyers Church Road Dauphin County' Courthouse Middletown, PA 17057' Harrisburg,'PA 17120 GPU NUCLEAR CORPORATION By )

Director, TMI-l Dated': January 5, 1983-O f

J I

2 TECHNICAL SPECIFICATION CHANGE REQUEST NO. 114

.The. Licensee requests that the attached changed pages replace pages 3-40s, 3-40b, 3-40c and 4-Sa in the existing TMI-1 Technical Specifications as issued by Amend -

ment'78 and page 4-1 of the existing Technical Specifications.

_ REASON FOR THE CHANGE NUREG 0737 Item II.F.1.1 require the' installation of certain increased range post 1 accident monitors and the submission of appropriate Technical Specifications. On October 8, 1981, the NRC-issued a letter concerning examples and the submission of Technical Specifications.

SAFETY EVALUATION JUSTIFYING CHANGE Section 2.1.2.1 of " Report in Response to NRC Staff Recocmended Requirements for

~

Restart of Three Mile Island Nuclear Station Unit 1" describes the post-accident monitoring instrumentation to be installed at TMI-1. The post-accident instru-mentation consists of the following:

(1) Containment Pressure (2) Containment Water Level l

(3) Containment Hydrogen Indication (4) High Range Containment Radiation Monitor (5) High Range Effluent Monitors:

a. Containment Exhaust
b. Main Steam Lines
c. Auxiliary and Fuel Handling Building Exhaust
d. Condenser Offgas Although the above instrumentation does not actuate safety equipment, nor is it required by safety analyses, it is appropriate to provide Tech. Spec. Require-ments to assure reliable post-accident performance of the instrumentation.

These proposed Technical Specifications put in place appropriate administrative requirements for operability and surveillance.

Based upon the above, we conclude that the proposed Technical Specifications, do not involve any unreviewed safety issues with regard to the criteria of 10 CFR, Part 50, Section 50.59 (a)(2).

IMPLEMENTATION In order to complete the modifications, finalize procedures and complete a full cycle of training, an implementation time period of 45 days after 3/31/83 or restart whichever is later, is requested.

' AMENDMENT CLASSIFICATION (10 CFR 170.22)

This is a class II amendment since it is administrative in nature and a check for $1,200 will be sent under a separate cover.

L y,