ML20028C807
| ML20028C807 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 12/30/1982 |
| From: | Starostecki R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Otoole J CONSOLIDATED EDISON CO. OF NEW YORK, INC. |
| Shared Package | |
| ML20028C808 | List: |
| References | |
| NUDOCS 8301140156 | |
| Download: ML20028C807 (3) | |
See also: IR 05000247/1982023
Text
.
.,
.
..
. . .
DECS O N
- DESIGNATED ORIGINAL
Zb
Certified B
Docket No. 50-247
'
Consolidated Edison Company of New York, Inc.
A1TN: Mr.-John D. O'Toole
Vice President
Nuclear Engineering and Quality
i
Assurance
4 Irving Place
New York, New Ycrk 10003
Gentlemen:
i
1
1
Subject:
Inspection 50-247/82-23
- .
'
This refers to the routine inspection conducted by Messrs. T. Foley and
P. Koltay of this office on November 1-30, 1982 at Indian Point Nuclear.
,
Generating Station, Unit 2 - Buchanan, New York of activities authorized
'
by tRC License No. DPR-26, and to the discussions of our findings held by
Mr. T. Foley with Mr. C. Jackson and members of his staff at the conclusion
of the inspection.
Areas examined during this inspection are described in the report enclosed
with this letter. Within these areas, the inspection consisted of selective
'
examinations of procedures and repmsentative records, interviewr. with per-
sonnel, and observations by the inspector.
-
Our inspector also verified the steps you have taken to correct one viola-
l
tion brought to your attention in the enclosure to our letter dated March 19,
1982. We have no further questions regarding your action at this time.
,
Based on the resuits of this inspection, it appears that certain of your activi-
ties were not conducted in full compliance with NRC mqQirements, as set forth
in the Notice of Violation, enclosed herewith as Appendix A.
This violation
,
'
has been categorized by severity level in accordance with the NRC Enforcement
.
policy (10 CFR 2, Appendix C) published in the Federal Register Notice (47 FR'
'
9987) dated March 9, 1982. You are required to respond to this letter and in
preparing your response, you should follow the instructions in Appendix A.
T
!
'
/07
i
/
B301140156 821230
PDR ADOCK 05000247
0FFICIAL RECORD COPY
Q
.-
.- - -.-
. .
-- - -
.. - - --. .. - .-
.
.
. , . . - - - . .
.
.
.
-
.
.
.
.
Consolidated Edison Company of
2
New York, Inc.
u
I
Sections of the enclosed inspection report contain details of your security pro-
,
gram that have been determined to be exempt from
with either 10 CFR 73.21 (Safeguards Information)public disclosure in accordanceor 1
'
or financial information). Therefore, the sections so identified in .;he inspec-
tion report and Appendix B will not be placed in the NRC Public Document Room and
)
will receive limited distribution. The inspection report cover sheet and my re-
maining portions of the inspection report will be placed in the Public Document
,
Room in accordance with 10 CFR 2.790(a), unless you notify, by telephone, the Su-
1
pervisor, Files, Mail and Records, USNRC Region I, at (215) 337-5223, within 10
days of the date of this letter and submit written application to withhold infor-
nation contained in the report within thirty days of the date of this letter.
Such application must be consistent with the requirements of 10 CFR 2.790(b)(1).
The responses directed by this letter and the accompanying Notica are not subject
,
to the clearance procedures of the Office of Management and Budget as required by
the Paperwork Reduction Act of 1980, PL 96-511.
Your ccaperation with us in this matter is appreciated.
Ob" eat 1 M 3p
.
p
Richard W. Starostecki, Director
I
Division of Project and Resident
Programs
i
Enclosures:
1.
Appendix A, Notice of Violation
2.
Appendix B Notice of Violation *
3.
NRC Region I Inspection Report
50-247/82-23*
- Contains Safeguards Infonnation
1
Y
..................
............... ....
.. ....... .......
. ........ .... ..
......... ... .. . .
.. .. ...............
. ..... .. ... .
&>
..................
.....................
.....................
... . ....... . .
. . . ...... .......
.. .................
. . . . . . . . . . . . . . . . . ,
l D4TEk
. . . . . . . . . .
l
..................
....................
.....................
........ ............
..... ... .... ....
. . . . . . . . . . . . . . . .
\\
b3%YY*HWL.JV.VY.L.
-
N
-
,
_ _ _ _ _ _ .
.
.,
.
..
DEC 3 01982
3
Consolidated Edison Company of ihnt York, Inc.
cc w/o Appendix B and Pages 16-19 of Enclosum 3:*
C. W. Jackson, Vice President, Uuclear Power
M. Blatt, Acting Director, Regulatory Affairs
W.D.Hamlin,AssistanttoResidentManager(PASNY)
F. Matra, Resident Construction Manager
Robert L. Spring, Nuclear Licensing Engineer
Director, Power Division
Thomas J. Farmily. Esquim
B mnt L. Brandenburg, Assistant General Counsel
PublicDocumentRoom(PDR)(LPDR)
Local Public Document Room
Nuclear Safety Infomation Center (NSIC)
NRC Resident Inspector (w/cy of encls)*
State of New York
- Contains Safeguards Information
bec w/o Appendix B and Pages 16-19 of Enclosure 3:*
'
Region I Docket Room (with concurrences)
Senior Operations Officer (w/o encis)
DPRP Section Chief
s
1
!
l
ornce> . D. .P. .R..P.. .. . .D. .P. .R.. P. . . . . .
D..P..R..$.. ........ .
. .D.. .P.R. . .P. . .
' .. .. l .
.
.
.
.
. . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
i =.~m > .M.ta
..f.9.hy....... ... ... Ki.s.te.r. 3......... ...Greenug
. . . . . .
. . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . .
.....I$@.s..... .....1.84!!.e ..\\t. M.I.1.h.. .....npj.$.....
.Y..
!
om>
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
pe ronu ais oo-so3 Nacu o24o
_
OFFICIA! RECORD COPY
_uso m i i_sss y _
_