Forwards IE Mgt Meeting Rept 50-483/82-18 on 821129-1201. No Noncompliance Noted
ML20028C792
Person / Time
Site: Callaway 
Issue date: 12/27/1982
From: Paperiello C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Schnell D
UNION ELECTRIC CO.
Shared Package
ML20028C793 List:
References
NUDOCS 8301140124
Download: ML20028C792 (2)


See also: IR 05000483/1982018

Text

,

~

3MB

..

o-

December 27, 1982

.

Docket No. 50-483

Docket No. 50-486-

Union Electric Company

ATTN:

Mr. Donald F..Schnell

Vice President - Nuclear

Post Office Box 149 - Mail Code 400

St. Louis, MO 63166

Gentlemen:

This refers to the management visit conducted by Messrs. W. L. Axelson and

T. J. Ploski of this office on November 29 through December 1, 1982, at the

headquarters of the Missouri State Emergency Management Agency in Jefferson

City, Missouri and at the Callaway Plant, Unit 1.

The purpose of this visit

was to discuss matters related to emergency preparedness for the Callaway

Plant, as authorized by NRC Construction Permit No. CPPR-139, dated April 16,

1976.

The enclosed copy of our report identifies areas discussed during the manage-

ment visit. These topics were also dircussed with R. Schukai of your staff at

the conclusion of the visit.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or your con-

tractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is

necessary that you (a) notify this office by telephone within ten (10) days

from the date of this letter of your intention to file a request for withhold-

ing; and (b) submit within twenty-five (25) days from the date of this letter

a written application to this office to withhold such information.

I f ' your

receipt of this letter has been delayed such that less than seven (7) days are

available for your review, please notify this office promptly so that a new

due date may be established. Consistent with Section 2.790(b)(1), any such

application must be accompanied by an affidavit executed by the owner of the

information which identifies the document or part sought to be withheld, and

which contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure. This

section further requires the statement to address with specificity the con-

siderations listed in 10 CFR 2.790(b)(4). The information sought to be

withheld shall be incorporated as far as possible into a separate part of the

9301140124 B21227

-

PDR ADOCK 05000483

0

""

W,M

I

,

,

Union Electric Company

2

December 27, 1982

affidavit. If we do not hear from you in this regard within the specified

periods noted above, a copy of this letter and the enclosed inspection report

will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely.

-

.

(L

.

C.

. Paperiello, Chief

Emergency Preparedness and.

Program Support Branch

Enclosure:

Inspection Report

No. 50-483/82-18(DEPOS)

cc w/ enc 1:

W. H. Weber, Manager

Nuclear Construction

S. E. Miltenberger, Plant Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Region IV

K. Drey

Ronald Fluegge, Utility

Division, Missouri Public

Service' Commission

Steve Ferris, FEMA, Region VII

William Beaty, Director, Missouri SEMA

Bob Perlis, OELD

RIII

RI

RI

RIII

y

'

CLf

Ploski/sv

on

Pap # ello

12/18/82