Text
_
I JAN 31983 Docket Nos. 50.508 50-509 h'
Washington Public Power Supply System P. O. Box 968 3000 George Washington Way Richland, Washington 99352 Attention: ffr. R. L. Ferguson Panaging Director Gentleren:
Subject:
Systematic Assessment of Licensee Performance (SALP) for Washington Nuclear Project Nos. 3 & 5 and WPPSS Letter G03-82-1256 dated Decenber 6, 1982.
This refers to the SALP for Washington Nuclear Project Nos. 3 & 5 conducted by i
this office for the period July 1,1981 through July 31, 1982 and discussed with your staff at a meeting on flovember 4,1982. The list of attendees is attached 8
as Enclosure 1.
The NRC SALP Report is attached as Enclosure 2.
Washinqton 1
Public Power Supply System letter G03-82-1256 dated December 6, 1982, which we requested in our letter dated October 27, 1982, provided licensee comitments for performance improvements. These letters are attached as Enclosures 3 and 4. is a copy of G03-82-1254 dated December 6, 1982, a supplementry response addressing Supply System management involvement and design control activities that was referenced in Enclosure 3.
Overall, your perfornance of licensed activities was found to be acceptable.
Weaknesses were identified in Section IV of the SALP Report, primarily related to Supply System management involvement and ensite design control. During the maeting of November 4,1982, we discussed our assessment of your performance in these areas. We have reviewed your letters of Decenber 6,1982 and determined that your actions to improve performance in the areas needing attentinn are responsive.
He consider that our meeting was beneficial and improved mutual understanding of your activities and our regulatory progran. Based on your cornnents during the necting and your December 6, letters, we have found that our assessment of
" Soils and foundation" should be rerated to Category 2 and is herein so noted. He have fcund that no other changes to our assessment are necessary.
l f
8301070287 830103
{pI
[
DR ADOCK 05000 i
ommg..R..V../..,j.k.g..hlh
- i... 3D.
. m.gg3.a"m" gg
,sy3
.gygstget,
?,T.$hn[.'.GBm.......'...i,295, M3"*
' " _ l,,, "1 OFFICIAL RECORD COPY
s-s 1
i JAN 31983 Washington Public Power Supply System In accordance with 10 CFR 2.790(a), a copy of this letter and its enclosures No reply to this letter is required.
will be placed in the NRC Public Document Room.
Your actions in response to the flRC Systenatic Assessment of Licensee Performance will be reviewed during future inspections of your licensed activities.
Your cooperation is appreciated.
Sincerely,
- . f. re; cr:
R. H. Engelken Regional Administrator
Enclosures:
As stated cc w/o enclosures:
R. B. Glasscock, Quality Assurance Director, WPPSS R. S. Leddick, Program Director, W!!P-3/5 D. E. Dobson, Project Manager, WNP-3/5 bec:
RSB/ Document Control Desk (RIDS)
Distributed by RV:
StateofWA(Lewis)
ResidentInspector(Albert)
Engelken(1tr) 1 i
/
o UGITED STATES i
Y NUCLEAR REGULATORY COMMISSION s
/~E REGION V o
g 1450 MARIA LANE, SUITE 260 f
g **. &
WALNUT CREEK. CAUFORMA 94596 January 3,1983 Docket Nos. 50-508 50-509 Washington Public Power Supply System P. O. Box 968 3000 George Washington Way Richland, Washington 99352 Attention: Mr. R. L. Ferguson Managing Director Gentlemen:
Subject:
Systematic Assessment of Licensee Performance (SALP) for Washington Nuclear Project Nos. 3 & 5 and WPPSS Letter G03-82-1256 dated December 6, 1982.
This refers to the SALP for Washington Nuclear Project Nos. 3 & 5 conducted by this office for the period July 1,1981 through July 31, 1982 and discussed with your staff at a meeting on November 4,1982. The list of attendees is attached as Enclosure 1.
The NRC SALP Report is attached as Enclosure 2.
Washington Public Power Supply System letter G03-82-1256 dated December 6, 1982, which we requested in our letter dated October 27, 1982, provided licensee commitments for performance improvements. These letters are attached as Enclosures 3 and 4.
l is a copy of G03-82-1254 dated December 6, 1982, a supplementry response addressing Supply System management involvement and design control activities that was referenced in Enclosure 3.
Overall, your performance of licensed activities was found to be acceptable.
Weaknesses were identified in Section IV of the SALP Report, primarily related to Supply System management involvement and onsite design control.
During the meeting of November 4,1982, we discussed our assessment of your performance in these areas. We have reviewed your letters of December 6,1982 and determined that your actions to improve performance in the areas needing attention are responsive.
We consider that our meeting was beneficial and improved mutual understanding of your activities and our regulatory program.
Based on your comments during the meeting and your December 6, letters, we have found that our assessment of
" Soils and Foundation" should be rerated to Category 2 and is herein so noted.
We have found that no other changes to our assessment are necessary.
t l
)
i l
Washington Public Power Supply System January-3, 1983 In accordance with 10 CFR 2.790(a), a copy of this letter and its enclosures will be placed in the NRC Public Document Room. No reply to this letter is required.
Your actions in response to the NRC Systematic Assessment of Licensee Performance will be reviewed during future inspections of your licensed activities.
Your cooperation is appreciated.
Sincerely,
&v5A.dli R. H. Engelken Regional Administrator
Enclosures:
As stated cc w/o enclosures:
R. B. Glasscock, Quality Assurance Director, WPPSS R. S. Leddick, Program Director, WNP-3/5 D. E. Dobson, Project Manager, WNP-3/5 4
l l
i
, we.4 u,,,,
w
,--.~n,
- ~ _. _ _,
,,.,_,._-g
ATTENDEES Nuclear Regulatory Commission B. H. Faulkenberry, Deputy Regional Administrator D. M. Sternberg, Chief, Reactor Project Branch No. 1 R. T. Dodds, Chief, Reactor Project Section No. l W. G. Albert, Senior Resident Inspector
~
D. P. Haist, Reactor Inspector R. W. Hernan, Licensing Project Manager Washington Public Power Supply System D. Mazur, Director of Operations R. S. Leddick, WNP-3 Program Director D. E. Dobson, WNP-3 Project Manager
- 0. E. Tropp, WNP-3 Project Quality Assurance J. Puzauskas, WNP-3 Quality Assurance Supervisor R. B. Glasscock, Director, Licensing and Assurance L. J. Garvin, Manager, Construction Quality Assurance G. D. Bouchey, Manager, Nuclear Safety and Regulatory Programs A. D. Kohler, Director, Special Projects D. L. Renberger, Deputy Director, Technology Energy Facility Site Evaluation Council (Washington State)
G. H. Hansen, Senior Engineer Bonneville Power Administration D. Smithpofor, Project Engineer A