DEC 2 21902
,
i
j
Docket No. 50-263
Northern States Power Company
,
4
NITN:
Mr. C. E. Larson
Director of Nuclear
i
Generation
414 Nicollet Mall
Minneapolis, MN 55401
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. C. H. Brown
and A. L. Madison of this office on August 29-October 30, 1982, of activities
at Monticello Nuclear Generating Station authorized by NRC Operating License
No. DPR-22 and to the discussion of our findings with Mr. W. A. Shamla and
other members of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
,
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
i
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
,
l
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
!
please notify this office promptly so that a new due date may be estab-
!
lished. Consistent with Section 2.790(b)(1), any such application must
.
be accompanied by an affidavit executed by the owner of the information
!
which identifies the document or part sought to be withheld, and which
!
P301070150 821222
PDR ADOCK 05000263
,
G
i
SEol
L
-
'
,
Northern States Power Company
2
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
J. F. Streeter, Chief
Projects Branch 2
Enclosure:
Inspection Report
No. 50-263/82-12(DPRP)
cc w/ enc 1:
W. A. Shamla, Plant Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII Monticello
Resident Inspector, RITI Prairie Island
John W. Ferman, Ph.D., Nuclear
Engineer, MPCA
RIII
RIII
RIII
T4; S,q. P'
kMllD
gf
Barrett/jp
Walker
Strbeter
l2 gL;g
12/17/82
7