Forwards IE Insp Repts 50-282/82-17 & 50-306/82-17 on 820921-1031.No Noncompliance Noted
ML20028B674
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 11/17/1982
From: Streeter J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Larson C
NORTHERN STATES POWER CO.
Shared Package
ML20028B675 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8212030134
Download: ML20028B674 (2)


See also: IR 05000282/1982017

Text

T

.

t>R ICE

,

'o,

UNITED STATES

,

NUCLEAR REGULATORY COMMISSION

3

o

$

E

REGION 111

o

799 ROOSEVELT ROAD

o

GLEN ELLYN,lLLINOIS 60137

.....

'

NOV 17 gggg

.

Docket No. 50-282(DPRP)

Docket No. 50-306(DPRP)

Northern States Power Company

ATTN:

Mr. C. E. Larson

Director of Nuclear

Generation

414 Nicollet Hall

Minneapolis, MN.

55401

Gentlemen:

This refers to the routine safety inspection conducted by Mr. C. D. Feiera-

c-

bend of this office on September 21 - October 31, 1982, of activities at the

Prairie Island Nuclear Generating Plant, Units 1 and 2 authorized by NRC Op-

erating License Nos. DPR-42 and DPR-60 and to the discussion of our findings

with Mr. Watzl at the conclusion of the inspection.

The enclosed copy of our inspection report identified areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of the inspection.

In accordance with 10 CFR 2.790 of the Commiu ion's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

,

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding;.and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

l

to withhold such information.

If your receipt of this letter has been

i

delayed such that less than seven (7) days are available for your review,

l

l

l

.

1

8212030134 821117

PDR ADOCK 05000282

l

G

PDR

!

.

- .. .

1f OI

!

.

.

.

i

Northern States Power Company

-2-

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

'This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

We will' gladly discuss any questions you have concerning this inspection.

Sincerely,

Original signed by J. F. Streeter

J. F. Streeter, Chief

Projects Branch 2

Enclosure:

Inspection Report

No. 50-282/82-17:and

50-306/82-17(DPRP)

cc w/ encl:

E. L. Watzl, Plant Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII,

-

Prairie Island

Resident Inspector, RIII,

Monticello

John W. Ferman, Ph.D.,

Nuclear Engineer, MPCA

RII

RIII

eyes /mh

Streeter

lll9lt3

h

a