ML20028B674
| ML20028B674 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 11/17/1982 |
| From: | Streeter J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Larson C NORTHERN STATES POWER CO. |
| Shared Package | |
| ML20028B675 | List: |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8212030134 | |
| Download: ML20028B674 (2) | |
See also: IR 05000282/1982017
Text
T
.
t>R ICE
,
'o,
UNITED STATES
,
NUCLEAR REGULATORY COMMISSION
3
o
$
E
REGION 111
o
799 ROOSEVELT ROAD
o
GLEN ELLYN,lLLINOIS 60137
.....
'
NOV 17 gggg
.
Docket No. 50-282(DPRP)
Docket No. 50-306(DPRP)
Northern States Power Company
ATTN:
Mr. C. E. Larson
Director of Nuclear
Generation
414 Nicollet Hall
Minneapolis, MN.
55401
Gentlemen:
This refers to the routine safety inspection conducted by Mr. C. D. Feiera-
c-
bend of this office on September 21 - October 31, 1982, of activities at the
Prairie Island Nuclear Generating Plant, Units 1 and 2 authorized by NRC Op-
erating License Nos. DPR-42 and DPR-60 and to the discussion of our findings
with Mr. Watzl at the conclusion of the inspection.
The enclosed copy of our inspection report identified areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of the inspection.
In accordance with 10 CFR 2.790 of the Commiu ion's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
,
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding;.and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
l
to withhold such information.
If your receipt of this letter has been
i
delayed such that less than seven (7) days are available for your review,
l
l
l
.
1
8212030134 821117
PDR ADOCK 05000282
l
G
!
.
- .. .
1f OI
!
.
.
.
i
Northern States Power Company
-2-
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
'This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will' gladly discuss any questions you have concerning this inspection.
Sincerely,
Original signed by J. F. Streeter
J. F. Streeter, Chief
Projects Branch 2
Enclosure:
Inspection Report
No. 50-282/82-17:and
50-306/82-17(DPRP)
cc w/ encl:
E. L. Watzl, Plant Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII,
-
Prairie Island
Resident Inspector, RIII,
Monticello
John W. Ferman, Ph.D.,
Nuclear Engineer, MPCA
RII
RIII
eyes /mh
Streeter
lll9lt3
h
a