OPERATING DATA REPORT DOCKET NO.
sn_ tn?
DATE 11/2/82 COMPLETED BY
- n. naanrt TELEPHONE tonn Yos-6486 OPERATING STATUS
- 1. Unit Name:
Crystal River Unit #3 Notes
- 2. Reporting Period:
10/1/82 - 10/31/82 3, Licensed Thermal Power (MWt):
2544 890
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
825 845
- 6. Maximum Dependable Capacity (Gross MWe):
806
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
I N/A
- 9. Power Level To Which Restricted.lf Any (Net MWe):
7475 W tharmal
- 10. Reasons For Restrictions. lf Any:
Pumo Power Monitors in bvoass.
This Month Yr. to Date Cumulative
!!. Hours in Reporting Period 745 7296 49416
- 12. Number Of Hours Reactor Was Critical 381.5 5901 31350.4
- 13. Reactor Reserve Shutdown Hours 0.0 71.1 1280.3
- 14. Hours Generator On.Line 368.8 5807.4 30619.6
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 893237 13150047 68516988
- 17. Gross Electri:al Energy Generated (MWH) 30534_4 ___.
4470927 23270518
- 18. Net Electrical Energy Generated (MWH) 291056 4251746
.22081044
- 19. Unit Service Factor 49.5%
79.6%
62.0%
- 20. Unit Availability Factor 49.5%
79.6%
62.0%
- 21. Unit Capacity Factor (Using MDC Net)
- 48. 5_%
72.3%
56.9%
41.4%
70.6%
54.2%
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 50.5%
20.4%
25.5%
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each t:
Refuel Outane beeinnine 3/19/82.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N /A
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIA L CRITICA Lily I/14 /77 INITIAL ELECTRICITY 1/30/77 COMMERCIAL OPER ATION 3/13/77 (4/77) 8211160303 821112 PDR ADOCK 05000302 R
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-302 UNIT FLCRP-3 DATE 11/2/82 COMPLETED BY D. Bogart TELEPHONE (904) 795-6486 3
MONTH October 1982 DAY AVERAGE DAILY POWER LEVEL DAY '
- AVERAGE DAILY P6WER LEVEL (MWe Net)
(MWe Net) 810 17 0
2 767 gg 0
770 0
3 39 810 4
20 5
804 21 0
815 22 6
807 0
7 23 8
24 0
9 813 25 0
807 0
10 26 794 g,
27 0
12 801 28 0
813 0
13 29 512 14 30 172 is 0
33 791 0
16 INSTRUCTIONS On this 'ormat, list the average daily unit power leselin MWe Net for each day in the reporting month. Compute io the nearcst whole megawatt.
(o 17 7 )
DOCKET NO.
50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Ff N 'l DATE 11/5/82 COMPLETED BY M Li-f'ul va r REPORT MONTil 10/82 TELEPHONE (9041 795-6486 n.
E c
.5 ?
3
$.U Licensee h
%'s Cause & Corrective No.
D.ite g
3g g
jg5 Event
~g Action to gO Present Recurrence
$E 5
Report *r in U 5 5 =g H
o u
C 2-28 821014 F
376.2 A
1 N/A WB HTEXCH RC drain tank cooler failed re-quiring SW cooling to the tank to be secured. Pressurizer relief valves leaked into the drain tank, eventu-ally causing the RC drain tank to relieve to the reactor building.
The unit was shutdown to correct the cooler leak and replace the pressurizer valves.
i I
2 3
4 F: Forced Reason:
Method:
Exhibit G. Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry St.ects for Licensee C-Refueling 3-Automatic Scram.
Event Reporn (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative 5
G-Operational Error (Explain)
Exhibit I.Same Source 19/77)
Il Other (Explain)
~
MONTHLY OPERATIONAL SlRDIARY STATEMENT DOCKET NO.
sn-an?
UNIT F1.CRP-1 DATE 11/s/R2 COMPLETED BY M_w. culver TELEPHONE (9041 795-6486 MONTH oc c ab'r 10A7
SUMMARY
STATEMENT:
The unit experienced one shutddwn-during the mod'h.