Forwards IE Insp Repts 50-329/82-19 & 50-330/82-19 on 820920-22.No Noncompliance Noted
ML20028A074
Person / Time
Site: Midland
Issue date: 10/28/1982
From: Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML20028A075 List:
References
NUDOCS 8211160381
Download: ML20028A074 (2)


See also: IR 05000329/1982019

Text

f

r.-

,

(i

!

GCT Z 8 Cd

Docket No. 50-329

Docket No. 50-330

Consumers Power Company

NITN: Mr. James W. Cook

Vice President

Midland Project

1945 West Parnall Road

Jackson, MI 49201

Gentlemen:

This refers to the routine safety inspection conducted by Mr. D. L. Robinson

of this office on September 20-22, 1982, of activities at Midland Nuclear Power

Plant, Units 1 and 2, authorized by NRC Construction Permits No. CPPR-81 and

No. CPPR-82 and to the discussion of our findings with Mr. D. B. Miller and

others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you (or

your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within ten (10)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of this

letter a written application to this office to withhold such informacion.

If

your receipt of this letter has been delayed such that less than seven (7)

'

days are available for your review, please notify this office promptly so that

a new due date may be established.

Consistent with Section 2.790(b)(1), any

such application must be accompanied by an affidavit executed by the owner of

the information which identifies the document or part sought to be withheld,

h

8211160381 821028

~

PDR ADOCK 05000329

O

PDR

_

_

_

i

,

0CT z c is82

Consumera Power Company

2

,

and which contains .a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure. This

section further requires the statement to address with specificity the con-

siderations listed in 10 CFR 2.790(b)(4). The information sought to be

withheld shall be incorporated as far as possible into a separate part of the

affidavit.

If we do not hear from you in this regard within the specified

-

periods noted above, a copy of this letter and the enclosed inspection report

will be placed in the Public Document Room.

Ve will gladly discuss any questions you have concerning this inspection.

Sincerely,

W. S. Little, Chief

Engineering Inspection Branch

.

Enclosure:

Inspection Reports

No. 50-329/82-19(DETP) and

No. 50-330/82-19(DETP)

cc w/ enc 1:

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

The Honorable Charles Bechhoefer, ASLB

The Honorable Jerry Harbour, ASLB

The Honorable Frederick P. Cowan, ASLB

The Honorable Ralph S. Decker, ASLB

William Paton, ELD

Michael Miller

Ronald Callen, Michigan

Public Service Commission

Myron M. Cherry

Barbara Stamiris

,

Mary Sinclair

Wendell Marshall

Colonel Steve J. Gadler (P.E.)

RIII

RIII

RI

R

hob

/sv

a iw

Boyd

Lit 1 7

10/25/82

/f/d7

jg

.

v