ML20028A002

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-546/82-17 & 50-547/82-17 on 820914-17.No Noncompliance Noted
ML20028A002
Person / Time
Site: Marble Hill
Issue date: 10/28/1982
From: Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
Shared Package
ML20028A003 List:
References
NUDOCS 8211160255
Download: ML20028A002 (2)


See also: IR 05000546/1982017

Text

.

OCT % 8 lood

Docket No. 50-546

Docket No. 50-547

Public Service of Indiana

NITN:

Mr. S. W. Shields

Senior Vice President

Nuclear Division

Post Office Box 190

New Washington, IN 47162

Gentlemen:

This refers to the routine safety inspection conducted by Mr. K. R. Naidu

of this office on September 14-17, 1982, of activities at Marble Hill Nuclear

Generating Station authorized by NRC Construction Permits No. CPPR-170 and

No. CPPR-171 and to the discussion of our findings with Messrs. W. M. Petro,

L. Ramsett and others at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordanen with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

,

to file a request for withholding; and (b) submit wi*hin twenty-five (25)

days from the date of this letter a written application to this office

to withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

,

8211160255 821028

PDR ADOCK 05000546

G

PDR

,

_ .- . - _ _

_

_ _ _ . _

- -

_.

-

-

..

.

OCT 4 8 #

Public Service of Indiana

2

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

W. S. Little, Chief

Engineering Programs Branch

Enclosure:

Inspection Reports

No. 50-546/82-17(DETP) and

No. 50-547/82-17(DETP)

cc w/ enc 1:

W. M. Petro, Vice President

Nuclear Operations

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

LeBoeuf, Lamb, Leiby & MacRae

Dave Martin, Office of Attorney

General

John R. Galloway, Staff Director

Environment, Energy and Natural

Resources Subcommittee

E. P. Martin, Wabash Valley Power

Association

Thomas M. Dattilo, Save the Valley

RIII

RIII.

RI'

RII

h(fams

K

i in

ttle

Ni /np

V

f

l0h

I

,

.

,

.

,_

y

- -.

7