ML20027E718

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-389/82-48 on 820920-24.No Noncompliance Noted
ML20027E718
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 10/07/1982
From: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML20027E719 List:
References
NUDOCS 8211150648
Download: ML20027E718 (2)


See also: IR 05000389/1982048

Text

f // camp

44

.

.,

October 7, 1982

Florida Power and Light Company

ATTN:

Dr. R. E. Uhrig, Vice President

Advanced Systems and Technology

P. O. Box 529100

Miami, FL 33152

Gentlemen:

Subject:

Report No. 50-389/82-48

This refers to the routine safety inspection conducted by Mr. P. A. Taylor of

this office on September 20-24, 1982, of activities authorized by NRC Construc-

tion Permit No. CPPR-144 for the St. Lucie facility and to the discussion of our

findings held with Mr. G. Boissy, Startup Superintendent, at the conclusion of

the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter.

Such application must be consistent with the requirements of

10 CFR 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

original signed by Dance

H. C. Dance, Chief

Reactor Projects Branch 2

Division of Project and

Resident Programs

Enclosure:

See Page 2

..

?

o

TEol

'

_ . -

Florida Power and Light Company

2

Enclosure:

Inspection Report No. 50-389/82-48

cc w/ encl:

B. J. Escue, Plant Manager

N. Weems, Assistant QA

Construction Manager

bec w/ encl:

NRC Resident Inspector

Document Management Branch

State of Florida

,

!

.

!

'.

Q[

QW

NCD, fv'

WO

RII

RII

RII

RII

RII

..

PTaylor:ht

FJa

ARHerdt

Klandis

HCDance

/dQ/82

[$' p

,n

82

/&'

82

/d/q /82

/d/ /82

3

i'

f

L_