ML20027E588
| ML20027E588 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 10/15/1982 |
| From: | Dance H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML20027E589 | List: |
| References | |
| NUDOCS 8211150516 | |
| Download: ML20027E588 (2) | |
See also: IR 05000413/1982025
Text
- .
p How
.
October 15, 1982
Duke Power Company
ATTN: Mr. H. B. Tucker, Vice President
Nuclear Production Department
422 South Church Street
Charlotte, NC 28242
Gentlemen:
Subject:
Report Nos.h413/82-Mhd 50-414/82-23
This refers to the routine safety inspection conducted by Mr. R. W. Wright and
others of this office on September 13-17, 1982, of activities authorized by NRC
Construction P(rmit Nos. CPPR-116 and CPPR-117 for the Catawba facility and to
the discussion of our findings held with Mr. J. C. Rogers, Project Manager, at
the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no violations or deviations were disclosed.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written appli-
cation to withhold information contained therein within thirty days of the date
of this letter.
Such application must be consistent with the requirements of
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
Original signed by Dance
H. C. Dance, Chief
Reactor Projects Branch 2
Division of Project and
Resident Programs
Enclosure:
See Page 2
8211150516 821015
~
i PDR ADOCK 05000413
G
T Eot
. . - .
.-
.-
._.
..
- '
.-
Duke Power Company
2
October 15,~1982'
,
Enclosure:
Inspection Report Nos. 50-413/82-25
and 50-414/82-23
,
cc w/ encl:
J. W.. Hampton, Station Manager
J. C. Rogers, Project Manager
bec w/ enc 1:
NRC Resident Inspector
Document Management Branch
State of South Carolina
,
.,
4
(
l
.
i
i
a
1
4
.
RII
I
[
RI)M
RII
RII
I-
'Rwd
/
AR(Herdt
4 g./
RWright:ht
MU3right
AIcjnaTonis
HC ance
609'/13/82
9/q/82-
10 / 4 /8 2-
/d/ /82
9/982
/S
i
f
f
a
1
. . . .
-.
~
__
,
_
. . - .
. - . . - - -
.
. - - .
- - . . .
. . - - -
- - - -- --
-
.-..