Forwards IE Insp Repts 50-348/82-24 & 50-364/82-23 on 820913-17.No Noncompliance Noted
ML20027E548
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 10/06/1982
From: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20027E549 List:
References
NUDOCS 8211150484
Download: ML20027E548 (2)


See also: IR 05000348/1982024

Text

.

-

-

_ _

- _ . .

-

- . -

- .

- - -. .

.-

. . - . - - - - - .

b.

--

.e

!

October 6, 1982

!

i

Alabama Power Company

ATTN:

Mr. R. P. Mcdonald

Vice President-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

<

Gentlemen:

Subject:

Report Nos. 50-348/82-24 and 50-364/82-23

This refers to the routine safety inspection conducted by Mr. W. W. Peery of

this office on September 13-17, 1982, of activities authorized by NRC License

Nos. NPF-2 and NPF-8 for the Farley facility and to the discussion of our

findings held with Mr. W. G. Hairston, Plant Manager, at the conclusion of the

inspection.

!

Areas examined during the inspection and our findings are discussed in the

ecciosed inspection report.

Within these areas, the inspection consisted of

!

,

j

selective examinations of procedures and representative records, interviews with

t

personnel, and observations by the inspector.

'

,

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

'

of this letter.

Such application must be consistent with the requirements of

,

10 CFR 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

~

them with you.

i

j

Sincerely,

!

!

(original signed by Dance)

!

H. C. Dance, Chief

Reactor Projects Branch 2

Division of Project and

Resident Programs

Enclosure:

j

See Page 2

i

i

B211150484 821006'

"

PDR ADOCK 05000348

.

0

PDR

ZEol

. .

.

.

-.

_

-

-.

- - - -

. - -

--

.

.

.. -

..

-

.9

Alabama Power Company

2

October 6, 1982

Enclosure:

Inspection Report Nos. 50-348/82-24

and 50-364/82-23

cc w/ encl:

W. O. Whitt, Executive Vice President

F. L. Clayton, Jr. , Senior Vice President

H. O. Thrash, General Manager-Nuclear Generation

0. D. Kingsley, Jr. , Manager, Nuclear Engineering

and Technical Services

J. W. McGowan, Manager-Safety Audit

and Engineering Review

W. G. Ware, Supervisor-Safety Audit

and Engineering Review

W. G. Hairston, III, Plant Manager

bec w/ encl:

NRC Resident Inspector

Document Management Branch

State of Alabama

RII

RII