Forwards IE Insp Repts 50-327/82-18 & 50-328/82-18 on 820706-0805 & Notice of Violation
ML20027E513
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/20/1982
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Parris H
Tennessee Valley Authority
Shared Package
ML20027E496 List:
References
NUDOCS 8211150447
Download: ML20027E513 (2)


See also: IR 05000327/1982018

Text

dS%f

. ey '

.

AUG 2 01982

Tennessee Valley Authority

ATTN: Mr. H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

Subject:

Report Hos. 50-327/82-18,50-328/82-18

This refers to the routine safety inspection conducted by Mr. E. J. Ford of this

office on July 6 - August 5,1982, of activities authorized by NRC Operating

License Nos. DPR-77 and DPR-79 for the Sequoyah Nuclear facility. Our

preliminary findings were discussed with Mr. C. C. Mason, Plant Manager, at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements. This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room unless you notify this offit.e, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter. Such application must be consistent with the requirements of

2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

David M. Verrelli, Chief

Reactor Projects Branch 1

Division of Project and

Resident Programs

Enclosure:

(See page 2)

8211150447 821029

PDR ADOCK 05000327

0

PDR

J

,

-

..

. ..

.

.

AUG 2 01982

Tennessee Valley Authority

2

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-327/82-18

and 50-328/82-18

cc w/ encl:

H. J. Green, Director of Nuclear Power

G. G. Stack, Project Manager

C. C. Mason, Plant

Superintendent

J. F. Cox, Supervisor, Nuclear

Licensing Section

M. J. Burzynski, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of Tennessee

l

l

l

l

t

l

Ril

R

/

j

E

r drt

RCrlenjak

40 Quick

DMVerrelli

8p /82

8@/82

8/W/82

8/ga/82

!

'

,

i

e

i