Forwards IE Insp Rept 50-302/82-20 on 820809-16 & Notice of Violation
ML20027E449
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/13/1982
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hancock J
FLORIDA POWER CORP.
Shared Package
ML20027E443 List:
References
NUDOCS 8211150328
Download: ML20027E449 (2)


See also: IR 05000302/1982020

Text

W.

-

.

p/w

.

-

,

,

Septenber 13, 1982

Florida Power Corporation

ATTN:

Mr. J. A. Hancock

Vice President Nuclear Operations

P. O. Box 14042, M. A.C. H-2

St. Petersburg, FL 33733

Gentlemen:

Subject:

Report No. 50-302/82-20

This refers to the routine safety inspection conducted by Messrs. G. A. Belisle,

P. E. Fredrickson, and L. H. Jackson of this office on August 9-16, 1982, of

activities authorized by NRC Operating License No. DPR-72 for the Crystal River 3

facility.

Our preliminary findings were discussed with Mr. T. C. Lutkehaus,

Nuclear Plant Manager, and Mr. J. T. Telford, Director, Quality Programs Depart-

ment, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements. These items and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as Appen-

dix A.

Elements to be included in your response are delineated in Appendix A.

Another violation was identified involving records control in paragraph 13 of

the enclosed report. This problem is another example of failure to maintain

proper storage of records discussed in IE Report 50-302/82-15 and cited in

the Notice of Violation transmitted by our letter dated August 20, 1982; there-

fore, a separate violation will not be issued. Based on a telephone call between

Mr. P. E. Fredrickson of this office and Mr. E. M. Howard, Director, Site

Nuclear Operations on August 19, 1982, it is our understanding that you will

address this additional example in your response to our previous letter.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter.

Such application must be consistent with the requirements of

2.790(b)(1).

8211150328 821025

PDR ADOCK 05000302

G

PDR

%

-

.

.

.

.

Florida Power Corporation

2

September 13, 1982

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

(Orginal signed by R. C. Lewis)

R. C. Lewis, Director

Division of Project and

Resident Programs

Enclosure:

Appendix A, Notice of Violation

cc w/ encl:

D. G. Mardis, Acting Manager

Nuclear Licensing

T. Lutkehaus, Nuclear Plant Manager

E. M. Howard, Director,

Site Nuclear Operation

bec w/ encl:

Document Management Branch..

State of Florida

NRC Resident Inspector

!

R

,v

RII

RII

RII

RII

RII

R

-

(&

f&

Qib

jr

UIh

P red

kson:es CNUpright AhVerdt JA0Tshinski JFRogge HCDance

C ewis

j.

9/ / /82

9/g /82

9/1 /82 9/v/82

9/ /82 9/q /82

9

/82

_ - _ , - _

. - - , .

. - , _

. . - - - - . - - ,