ML20027D610

From kanterella
Jump to navigation Jump to search
Revised Final Deficiency Rept Re Lack of Adequate Design Criteria for Spent Fuel Pool Gates.Initially Reported on 820601.Mod to Reinforce Gates Will Be Completed by 830228 & 840731 for Units 1 & 2,respectively.Drawings Revised
ML20027D610
Person / Time
Site: Bellefonte  
Issue date: 11/01/1982
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8211080156
Download: ML20027D610 (2)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ____ _______

k P

.N TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 374ol 400 Chestnut Street Tower II November 1, 1982 o

1:.

BLRD-50-438/82-43 BLRD-50-439/82-39 Q

$ ^S 6

f to

.T U.S. Nuclear Regulatory Commission h

Region II C.Md Attn:

Mr. James P. O'Reilly, Regional Administrator

(~,

w 101 Marietta Street, Suite 3100 c:

6"*

Atlanta, Georgia 30303

Dear Mr. O'Reilly:

BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - SPENT FUEL POOL GATES -

BLRD-50-438/82-43, BLRD-50-439/82 REVISED FINAL REPORT The subject deficiency was initially reported to NRC-0IE Inspector Don Quick on June 1, 1982 in accordance with 10 CFR 50.55(e) as NCR BLN NEB 8005. This was followed by our first interim report dated July 2, 1982 and our final report dated September 17, 1982. Enclosed is our revised final report. The reason for the revision is to clarify the corrcotive action of the report. Thic deficiency has also been reported for our Watts Bar and Sequoyah Nuclear Plants as NCRs WBN NEB 8005 and SQN NEB 8012.

If you nave any questions concerning this matter, please get in-touch with R. H. Shell at l'TS 858-2688.

Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Ma er Nuclear Licensing Enclosure cc:

Mr. Richard C. DeYoung, Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 OFFICIAL CfA3d fA h

$o O

S An Equal Opportunity Employer

ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 SPErr FUEL POOL GATES NCR BLN NEB 8005 BLRD-50-438/82-43, BLRD-50-439/82-39 10 CFR 50.55(e)---

REVISED FINAL REPORT Description of Deficiency The four spent fuel pool gater (one to each transfer canal and one to each cask loading area) were reanalyzed under new design criteria (i.e., to seismic requirements in accordance with Regulatory Guide 1.13) and found to be inadequate. The cause of this deficiency was the lack of adequate design criteria.

Safety Implicati.ons Structural failure of the gates during a seismic event could result in damage to stored spent fuel elements. This could result in radiation levels in the spent fuel pool areas higher than those assumed in the plant safety analysis and thus coula result in doses to plant personnel and the public greater than has been analyzed.

Corrective Action TVA has reviewed the manufacturing records and inspection reports for the gates and has determined that they conformed to the initial design requirements. The gates were then analyzed to establish modification requirements to ensure that they will meet the requirements of Regulatory Guide 1.13 TVA will modify the gates, under ECN 1509, so they will meet all the requirements of Regulatory Guide 1.13 This will eliminate the possibility of structural failure of the gates during a seismic event. To prevent recurrence, TVA has writte'n a plant-specific design criteria incorporating these requirements for the subject gates.

The gates will be structurally reinforced and have two additional sets of restraints in both the operating and stored positions. The design drawings have been revised depicting the modifications. Work on the gates will da completed by February 28, 1983, for unit 1 and July 31, 1984, for unit 2.

, -,- -