ML20027D441

From kanterella
Jump to navigation Jump to search
Third Interim Deficiency Rept Re Incorrect Insp Code on Hanger Drawings by Itt Grinnell.Initially Reported on 820801.Second Review of Apc Weld Cards Performed Before Issuance & Use.Also Reportable Per Part 21
ML20027D441
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 10/26/1982
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-PT21-82 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8211040299
Download: ML20027D441 (2)


Text

r

-.q

~

TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 374ol 400 Chestnut Street Tower II October 26, 1982 BLRD-50-438/82-24 BLRD-50-439/82-21 c>

N U.S. Nuclear Regulatory Commission co i

Region II C

yj Attn:

Mr. James P. O'Reilly, Regional Administrator m

~; o 101 Marietta Street, Suite 3100

.h o l'

Atlanta, Georgia 30303 g

j ca

Dear Mr. O'Reilly:

.~

co BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - INCORRECT INSPECTION CODE ON

.c HANGER DRAWINGS BY ITT GRINNELL - BLRD-50-438/82-24, BLRD-50-439/82 THIRD IIRERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector l

Don Quick on March 1, 1982 in accordance with 10 CFR 50.55(e) as NCR 1748.

This was followed by our interim reports dated March 30 and July 26, 1982.

Enclosed is our third interim report. We expect to submit our next report by February 25, 1983 We consider 10 CFR Part 21 applicable to this deficiency.

If you have any questions concerning this matter, please get in touch with R. H. Shell at FTS 858-2688.

Very truly yours, TENNESSEE VALLEY AUTHORITY w

L. M. Mills, Ma ager Nuclear Licensing i

Enclosure lc cc:

Mr. Richard C. DeYoung, Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 d, g '-[-

8211040299 821026

.,gg;4 DR ADOCK 05000 An Equal Opportunity Employer

e ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 INCORRECT INSPECTION CODE ON HANGER DRAWINGS BY ITT GRINNELL NCR 1748 BLRD-50-438/82-24, BLRD-50-439/82-21 10 CFR 50.55(e)

THIRD INTERIM REPORT Description of Deficiency During a review of weld documentation and pipe hanger drawings, plate and shell welds on safety-related hangers were discovered which did not receive a dye-penetrant inspection as required in ASME Section III, Class 2,. Subsection NF.

Two causes for this deficiency were determined.

1.

Inspection requirements were overlooked by TVA personnel reviewing the hanger drawings to generate the automated process control (APC) weld cards used in construction of the support.

2.

TVA's hanger vendor (ITT Grinnell, Providence, Rhode Island) specified some ASME Section III, Class 2, welded joints to the wrong inspection code paragraphs (NF-5231, etc.).

The vendor portion of this NCR is not applicable to other TVA plants since ITT Grinnell has a hanger contract only with Bellefonte. The improper inspection of the hanger drawings for weld inspection requirements may be of generic nature; and therefore, the NCR will be directed to other plants for consideration.

Interim Progress TVA's Division of Construction has completed the review of all weld documentation and hanger drawings for ASME Section III, Class 2 supports to determine if the proper weld inspections were performed. Sixty-three of the welds reviewed will require reinspection.

Reinspection of these welds will be initiated. To prevent recurrence of this deficiency, a second review of the APC weld cards is now performed before their issue for use.

ITT Grinnell has performed an initial review of the ASME Section III, Class 2 hangers listed in the NCR for adequacy of the specified inspection code. TVA is reviewing the deficiency and working with the vendor on a resolution.

l