ML20027D130

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-275/82-29 on 820829-1002.No Noncompliance Noted
ML20027D130
Person / Time
Site: Diablo Canyon 
Issue date: 10/14/1982
From: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Crane P
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML20027D131 List:
References
NUDOCS 8210280287
Download: ML20027D130 (4)


See also: IR 05000275/1982029

Text

"

l

o

,.

5

%

-

3

,

.

t

M

00T14

Docket No. 50-275

Pacific Gas and Electric Company

P. O. Box 7442

San Francisco, California 94106

Attention: Mr. Philip A. Crane Jr.

Assistant General Counsel

Gentlemen:

This refers to the routine, monthly inspection conducted by Messrs.

J. D. Carlson and M. M. Mendonca of this office from August 29, 1982,

through October 2,1982, of activities authorized by NRC License No. DPR-76,

and to the discussions of our findings held by Messrs. Carlson and Mendonca

with Mr. Thornberry and other members of your staff at the conclusion of the

inspection.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and

observations by the inspectors.

No items of noncompliance with NRC requirements were identified within the

scope of this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold informatlon contained herein within thirty days of

the date of this letter. Such application must be consistent with the

requirements of 2.790(b)(1).

,

8210280287 821014

a

PDR ADOCK 05000275

G

PDR

ILOJ

-

.

-

i

, , , ,

,,\\

e

..

...

.

~f,

,

"

su m ur)

CARLS N N

! dD0NCA

K aCH

BISHOP

}0'//{/82"" 'T07B/82"

"10/B/82

jo

j

'

'

'

"

omp

Nac eowu aia no so sucu eno

OFFICIAL RECORD COPY

-u m '**- m a

.

?

.

.

9

'

,

9

Pacific Gas and Electric Company

-2-

OCT 14198L

i

'

Should you have any questions concerning this inspection we will be glad to

discuss them with you.

Sincerely.

,

.

i

i

!

!

T. W. Bishop. Chief

Reactor Projects Branch No. 2

!

Enclosure:

NRC Inspection Report

No. 50-275/82-29

,

i

cc w/o enclosure:

i

J. L. Schuyler, PG&E

,

J. D. Shiffer, PGAE

]

W. S. Raymond, PG&E

bec:

DMB/ Document Control Desk (RIDS)

Distributed by RV:

State of CA (Johnson)

-

Resident Inspector

Engelken(ltr)

LandrA s i \\ u e s- (Beso d c>nl )

y

.

I

<

!

i

I

I

i

,

4

I

j

f

Iq

UNITED STATES

E

p,

NUCLEAR RE!ULATCRY COMMISSION

g

j

REGION V -

'

O,,,

g

1450 MARIA LANE, SUITE 210

.

%,

,d

WALNUT CREEK,CALIFORNI A 94596

October 14, 1982

Docket No. 50-275

Pacific Gas and Electric Company

P. O. Box 7442

San Francisco, California 94106

Attention: Mr. Philip A. Crane Jr.

Assistant General Counsel

Gentlemen:

This refers to the routine, monthly inspection conducted by Messrs.

J. D. Carlson and M. M. Mendonca of this office from August 29, 1982,

through October 2,1982, of activities authorized by NRC License No. DPR-76,

and to the discussions of our findings held by Messrs. Carlson and Mendonca

with Mr. Thornberry and other members of your staff at the conclusion of the

inspection.

~

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and

observations by the inspectors.

No items of noncompliance with NRC requirements were identified within the

scope of this inspection.

in accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained herein within thirty days of

i

the date of this letter.

Such application must be consistent with the

requirements of 2.790(b)(1).

l

l

l

l

l

I

l

!

.

-.

!

l

+

'

Pacific Gas and Electric Company

-2-

October 14, 1982

,

Should you have any questions concerning this inspection we will be glad to

,

discuss them with you,

t

Sincerely,

.

-

.

.O

'

1

T. W. Bishop, Chief

Reactor Projects Branch No. 2

Enclosure:

,

i

NRC Inspection Report

!

No. 50-275/82-29

cc w/o enclosure:

J. L. Schuyler, PG&E

J. D. Shiffer, PG&E

W. S. Raymond, PG&E

1

.

!

!

s

..

m.

=

n