ML20027D013
| ML20027D013 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 10/13/1982 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gerstner W ILLINOIS POWER CO. |
| Shared Package | |
| ML20027D015 | List: |
| References | |
| NUDOCS 8210280170 | |
| Download: ML20027D013 (2) | |
See also: IR 05000461/1982017
Text
,
.
00i 13 1982
Docket No. 50-461
Illinois Power Company
ATTN:
Mr. W. C. Gerstner
Executive Vice President
500 South 27th Street
Decatur, IL 62525
Gentlemen:
This refers to the meeting conducted between you and myself and members of
our staffs on September 30, 1982, at our offices in Glen Ellyn, Illinois.
The purpose of this meeting was to discuss the status of management and
quality activities with respect to construction work at the Clinton Power
Station.
The enclosed copy of our report identified areas discussed during the man-
agement meeting.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed meeting report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written cpplication to this office
to withhold auch information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
.
.which identifies the document or part sought to be withheld, and which
4
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
j
This section further requires the statement to address with specificity
,
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
meeting report will be plcced in the Public Document Room.
'
l
8210280170 821013
,
PDR ADOCK 05000461
O
'
I
C
3
_
.
Illinois Power Company
2
We will' gladly discuss any questions you have concerning this meeting.
Sincerely,
Original signed by
A. Bert Davis
James G. Keppler
Regional Administrator
Enclosure:
Inspection Report
No. 50-461/82-17(DPRP)
cc w/ enc 1:
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Karen Borgstadt, Office of
Assistant Attorney General
.
Gary N. Wright, Manager
Nuclear Facility Safety
Randall L. Plant, Prairie
Alliance
t
l
l
RII
RI I
RIII
RIII
R II
R II
'
W
'
Ja
nski/sv
ayes
Knop
lh
S
ard
avis
hKeppler
fo)O
4
/6fjy
10 /82
g0
2