ML20027C933

From kanterella
Jump to navigation Jump to search
Notifies of Plans for Series of Spent Fuel Shipments from Aecl Chalk River Facility to DOE Savannah River Facility. Schedule Encl
ML20027C933
Person / Time
Site: 07001510
Issue date: 06/03/1982
From: Danese F
NAC INTERNATIONAL INC. (FORMERLY NUCLEAR ASSURANCE
To: Gody A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20027A763 List:
References
FOIA-82-332 FLD-82-52-ETS, NUDOCS 8210270437
Download: ML20027C933 (2)


Text

s

.5

_/

NuclEr Azzurinc2 Carp:r; tion 24 Executen Park West Attanta, Georgia

  • 0329 J

(404)32s-4200 Telex: 549567,542703 715 Horizon Drive

. Grand Junction. Colorado B1501 (303) 245-4320 TWX 9109296334 V

Weinbergstrasse 9 8001 Zunch. Switzerland (01) 470844 Telex: 57275 June 3, 1982 FLD/82/52/ETS Director, Region I U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement 631 Park Avenue King af Prussia, Pennsylvania 19406 Attn:

Mr. A. Gody

Dear Sir:

The Nuclear Assurance Corporation (NAC), as agent for Atomic Energy of Canada, limited (AECL), plans to make a series of spent fuel shipments from an i

AECL facility at Chalk River to the U.S. DOE Savannah River Plant. These shipments would enter the U.S. at Alexandria Bay, New York, under NAC's Import License No. ISNM81005, Revision 1, and would continue until the material described by the license has been shipped or the shipments are delayed for reason.

The schedule for these shipments is enclosed.

Adjustments to the schedule will be made in writing if time permits, and by telephone (followed by letter) if necessary.

This notification is made in accordance with the requirements of 10 CFR 73.72.

Sincerely, NUCLEAR ASSURANCE CORPORATION

~

F. L. Danese Manager, Cask Operations FLD:1wb cc: Director, Region II Material Transfer SG Licensing Branch U.S. Nuclear Regulatory Commission Division of Safeguards Office of Inspection and U.S. Nuclear Regulatory Commission Enforcement Washington, D.C.

20555 101 Marietta Street Suite 3100 Attn:

Mr. Charles Hillman tlanta, GA 30303 Attn: Mr. M. D. McGuire 8210270437 820923 L

PDR FOIA I

RESNIKOS2-332 PDR

,__ g

~ " '

6/J/Jq

~

r.. '*

SCHEDULE INFORMATION The information described below is required by NRC regulations to be protected

[,

in accordance with the requirements of 10 CFR 73.21.

t Number of shipments:

6 Estimated Time and Date of Departure from Origin (AECL):

Time Date Shipment 1:

01:30A 06/11/82 Shipment 2:

01:30A 06/18/82 Shipment 3:

01:30A 06/25/82 Shipment 4:

01:30A 07/02/82 Shipment 5:

01:30A 07/09/82 Shipment 6:

01:30A 07/16/82 Estimated Time and Date of Entry at Alexandria Bay, NY:

Time Date Shipment 1:

06:15A 06/11/82 Shipment 2:

06:15A 06/18/82 Shipment 3:

06:15A 06/25/82 Shipment 4:

06:15A 07/02/82 Shipment 5:

06:15A 07/09/82 Shipment 6:

06:15A 07/16/82 Estimated Time and Date of Arrival at Destination (SRP):

Time Date Shipment 1:

01:30P 06/12/82.

Shipment 2:

01:30P 06/19/82 Shipment 3:

01:30P 06/26/82 Shipment 4:

01:30P 07/03/82 Shipment 5:

01:30P 07/10/82 Shipment 6:

01:30P 07/17/82 l

/

l l

l l

l

-