LD-82-107, Forwards Schedule for Addl Spent Fuel Shipments
| ML20027C934 | |
| Person / Time | |
|---|---|
| Site: | 07001510 |
| Issue date: | 08/13/1982 |
| From: | Danese F NAC INTERNATIONAL INC. (FORMERLY NUCLEAR ASSURANCE |
| To: | Gody A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML20027A763 | List: |
| References | |
| FOIA-82-332 FLD-82-107-ETS, NUDOCS 8210270438 | |
| Download: ML20027C934 (2) | |
Text
-
r
+1 Nuclear Assusance Corporallon 1
,(
24 Enecutiva rank West Atlanta. Georgia 30329 (404)325 4200 Telen. 549567, 542703 715 Horizon Drive Grand Junction. Colorado B1501 (30?)245 4320 1WX:9109296334 Weinbergstrasse 9 B001 Zurich. Switzerland (01) 470844 Tcles: 57275 Director, Region I August 13, 1982 U.S. Fluclear Regulatory Commission FLD/82/107/ETS Of fice of Inspection and Enforcement 631 Park Avenue King of Prussia, Pennsylvania 19406 Attn:
fir. A. Gody
Subject:
Increase in number of scheduled shipments
Dear Sir:
By letter dated July 2,1982 (copy attached), the fluclear Assurance Corporation made notification of a series of spent fuel shipments scheduled into the U.S.
The U.S. Department of Energy and the Atomic Energy of Car.ada, limited, have reached agreement by which the number of scheduled shipments has been increased.
These additional shipments would be made along the route presently in use.
The schedule for the additional shipments is enclosed separtely as safeguards information.
This notification is made in accordance with the requirements of 10 CFR 73.72.
Please let me know if you have any questions.
Sincerely, fluCLEAR ASSURAtiCE CORPORAT10ti
& ** %./_ ]
,(-
t ; o,a Q u e. --
F. L.
nese 8210270438 820923 PDR FOIA tianager, Cask Operations RESNIKOS2-332 PDR FLD:pwh cc:
Director, Region II I4aterial Transfer SG Licensing Branch U.S. fluclear Regulatory Commission Division of Safeguards Office of Inspection and U.S. Fluclear Regulatory Commission Enforcement Washington, D.C.
20555 101 liarietta Street Suite 3100 Attn:
fir. Charles Ilillman Atlanta, GA 30303 L
u l'
/
I $ 1, N
R SCHEDULE INFORMATION 8/13/82
~ he information described below is required by NRC regulations to be protected n accordance with the requirements of 10 CFR 73.21.
Total Number of sh,ipments:
11 I
Estimated Time and Date of Departure from Origin (AECL):
Time Date Shipment 7:
04:00P 08/22/82 Shipment 8:
04:00P 08/29/82 096r7 Shipment 9:,
04:00P 09/05/82 #ffev $
Shipment 10: L 04:00P 09/12/82 Shipment 11:
04:00P 09/19/82 Estimated Time and Date of Entry at Derby Line, VT:
Time Date Shipment 7:
02:00A 08/23/82 Shipment 8:
02:00A 08/30/82 Shipment 9: NA(02:00A 09/06/82 Shipment 10: 0 7 02:00A 09/13/82 Shipment 11:
02:00A 09/20/82
/ Estimated Time and Date of Arrival at Destination (SRP):
Time Date
/
Shipment 7:
07:00P 08/24/82 Shipment 8:
07:00P 08/31/82 Shipment 9: A/L 07:00P 09/07/82 - cancelled Shipment 10: of 07:00P 09/14/82 Shipment 11:
07:00P 09/21/82
}<
Note:
Shipments 9,10, & 11 cancelled.
e c
4