Advises That No Further Ofc Action Planned Re 800521 Inoperability of RHR Sys for 5-h Since Pipe Crack Study Group Will Issue Rept in 2 Wks.Sys Inoperability Due to Weld Leak Repair Effort
ML20027B988
Person / Time
Site: Beaver Valley
Issue date: 08/04/1980
From: Lanning W
NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
To:
NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
References
AEOD-E006, AEOD-E6, NUDOCS 8210120120
Download: ML20027B988 (1)


Text

=

(

i 4

AUG 4158D AE00/E006 f

This is an internal, pre-f decisional document not fl0TE TO:

File necessarily representing a r

FROM:

Wayne D. Lanning, Office for Anilysis and position of AE0D or NRC.

Evaluation of. Operational Data

SUBJECT:

LOSS OF RN AT EEAVER VALLEY, LER 80-031

\\

On May 21, 1980, the RHP, system was inoperabTer for approximately five hours..

The plant had been in cold shutdown since Nove=ber 30, 1979. As.a result of a leak in the weld attaching a 3/4" line to the comon header of the RHR pumps, l

_the.. isolation valves to the RHR syste= were re-energized as a precaution in

, case of a gross failure. The valves closed after'tiiey were re-energized due i

to a false high pressure signal due to a de-energized process control signal.

i Plant management then elected to repair the wild leak which accounted for the:

S hour period.

i Investication revealed that the safety significance of the total loss of: RHR was minimal due to the following considerations:

1.

The RRR is not part of the emergency core cooling system.

A separate low pressure decay heat removal system which is safety-related was available.

[

2.

Due to the low decay heat power level, an alternate cooling.

- system was not required. The reactor coolant system temperature increased from 900F to only 1150F, during the period.

i Since this leak appeared similar to several I,ERs in RHR systems due to fatigue failure caused by vibration, the Pipe Crack E'

' Group included this issue in its study. A report is to be issued in abon e a ',teeks. Therefore, no further AEOD action is planned.concerning this event. wis type of event will remain on qy watch list for future consideration.

Original signed by, 1Tayne D. T="r 1.

^

.liayne D. Lanning f

Office for Analysis and Evaluation of Operational Data i-cc:

J. Heltemes l

I C. I;ichelson

~~~

~

1 l

I 8210120120 800804 I

PDR ADOCK 05000334 l

P PM

.