Text
- =
(
i 4
AUG 4158D AE00/E006 f
This is an internal, pre-f decisional document not fl0TE TO:
File necessarily representing a r
FROM:
Wayne D. Lanning, Office for Anilysis and position of AE0D or NRC.
Evaluation of. Operational Data
SUBJECT:
LOSS OF RN AT EEAVER VALLEY, LER 80-031
\\
On May 21, 1980, the RHP, system was inoperabTer for approximately five hours..
The plant had been in cold shutdown since Nove=ber 30, 1979. As.a result of a leak in the weld attaching a 3/4" line to the comon header of the RHR pumps, l
_the.. isolation valves to the RHR syste= were re-energized as a precaution in
, case of a gross failure. The valves closed after'tiiey were re-energized due i
to a false high pressure signal due to a de-energized process control signal.
i Plant management then elected to repair the wild leak which accounted for the:
S hour period.
i Investication revealed that the safety significance of the total loss of: RHR was minimal due to the following considerations:
1.
The RRR is not part of the emergency core cooling system.
A separate low pressure decay heat removal system which is safety-related was available.
[
2.
Due to the low decay heat power level, an alternate cooling.
- system was not required. The reactor coolant system temperature increased from 900F to only 1150F, during the period.
i Since this leak appeared similar to several I,ERs in RHR systems due to fatigue failure caused by vibration, the Pipe Crack E'
' Group included this issue in its study. A report is to be issued in abon e a ',teeks. Therefore, no further AEOD action is planned.concerning this event. wis type of event will remain on qy watch list for future consideration.
Original signed by, 1Tayne D. T="r 1.
^
.liayne D. Lanning f
Office for Analysis and Evaluation of Operational Data i-cc:
J. Heltemes l
I C. I;ichelson
~~~
~
1 l
I 8210120120 800804 I
PDR ADOCK 05000334 l
P PM
.