ML20027B500
| ML20027B500 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 09/16/1982 |
| From: | Sternberg J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Leddick R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| References | |
| NUDOCS 8209210138 | |
| Download: ML20027B500 (2) | |
Text
-
w v
y.
4 f
c.
sr w
\\~
1 SEP 161982 Docket No. 50-503 50-509 Washington Public Power Supply System P. O. Box 1223 Elma, Washington 98541 Attention: Mr. R. S. Leddick WNP-3/5 Program Director Gentlemen:
This letter is to inforn you that we have reorganized the Division of Resident, Reactor Projects, and Engineering Programs in Region V.
The reorganization is intended to improve the continuity of our programs for facilities in the construction and pre-operational testing phases as t%y enter the operational phase. The construction and operation Pcanches have been combined and project responsibility within the Division will remain throughout construction and operations with one of our project branches.
Additionally we have established an Engineering Programs Section. This section will provide a single point of focus for the reactor licensing cffort which is being transferred from NRR to the Regional Offices as part of the NRC's Regionalization program.
The following sumarizes the new organization as it relates to the Region V poser reactor facilities.
Reactor Projects Branch #1 Daniel M. Sternberg, Chief Phone: 415 943-3737 Projects Section 1 Robert T. Dodds, Chief Phone: 415 943-3720 Washington Public Power Supply Systen Portland General Electric
- "210158 A ZEDI QS..
.. 27 "n
RNBERG C
~S BISHOP am) mp
'7Q/82"
'97 [ 82 9/ d /82 F ORM 31H i10 00l NRCM O240 OFFICIAL RECORD COPY
' " *-m
- I
e Was,hington~Public Power Supply System
-2 ~
SEP 161S87.
Projects Section 2 Tolbert Young, Jr., Chief,,
Phone: 415 943-3853
)
Arizona Public Service Company-Sacramento Municipal Utility District x
1 Reactor Projects Branch #2 Thomas W. Bishop Chief Phone: 415 943-3751, Projects Section 3 Dennis F. Kirsch, Chief x
Phone: 415 943-3723 Southern California Edison Company Pacific Gas and Electric Company Engineering Programs Section
~
Gerald B. Zwetsig, Chief Phone: 415 943-3749 Please feel free to call upon me.or my staff if you.have questions regarding
. our revised organization.
D M St* * 'w 3 L '-
J. L. Crews, Director Division of Resident, Reactor Projects and En0 neering Programs i
cc:
R. B. Glasscock, Quality Assurance Director, WPPSS Dale Dobson, Project Manager, WPPSS g
bec: DMB/ Document Control Desk (RIDS) s' Distributed by RV:
State of WA (Lewis) il Resident Inspector Engelken
,v y
a.
U. S. Nuclear Regula tory Connissien 7
Region V R. H. Engelken, Regional Administrator B. H. Faulkenberry, Deputy Regional Administrator
_R. G. Gilbert. Asst. to th? Regional 4 hinistrator NRC Public Affairs Enforcement J. G. Hanchett Public Af fairs Officer A. D. Johnson, Director Division of Resident, Reacter Projects.
Division of Radiological Safety and Engineering Inspectien and Safeguards Programs l
l J. L. Crews, Director G. S. Spencer, Director 1
Reactor Projects Reactor Projects Operational Support Radiological Safety Safeguards Branch Branch No.1 Branch No. 2 Branc h Branch.
D. M.
- ernberg, T. W. Bishop, I. M. Alexander, H. E. Book, Chief L. R. Norderhaug, I
Chief Chief Chief Ad.ninistrative Support Services for the Regional Office and Reactor Radiation Physical Security Reactor Projects Reactor Projects Resident Inspectors Section No. 1 Section No. 3 Protection Section Section R. T. Dodds, D. F. Kirsch.
F. A. Wenslawski, M. D. Schuster, Chief Chief Chief Chief
\\
l (PGE,WPPSS)
(PGSE,SCE)
Reactor Projects Engineerin9 Materials Radiation P
Section No. 2 Programs Section Protection Section T. Young, Jr.,
G. D. Zwetzi?.
R. D. Thomas, Chief Chief Chief (APS, SMUD)
Auryn t, 19 ?
.