Proposed Tech Specs Re Use of Mass Point Method for Conducting Containment Integrated Leak Rate Tests & Revise Required Schedule for Conducting Tests,Per 10CFR50,App J
ML20024H424
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 05/24/1991
From:
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML20024H423 List:
References
NUDOCS 9106030343
Download: ML20024H424 (2)


Text

-

CG, 4

CONTAINMENT SYSTEMS CONTAINMENT LEAKAGE LIMITING CONDITION FOR OPERATION 3.6.1.2 Containment leakag'e rates shall be limited to:

a.

An overall integrated leakage rate of:

1.

1 L,pe(r 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at P,, 50 psig, or 346,000 SCCM), 0.20 percent by weight of the containment air 2.

1Lt (61,600 SCCM), 0.058 percent by weight of the containment air per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at a reduced pressure of P. 25 psig, t

b.

A combined leakage rate of 10.60 L (207,600 SCCM), for all penetra-tions trei ' al'fes subject to Type B $nd C tests when pressurized to P,.

APPLICABILITY:

MODES 1, 2, 3 and 4.

ACTION:

With either (a) the measured overall integrated co'ntainment leakage rate or (b) with the Sea (259,500sured combined leakage fate for all penetrations an exceeding 0.75 L SCCM) or 0.75 L (46,200 SCCM), as applicable, subject to Types B and C tests exceeding 0.60 L, restore the leakage rate (s) to within the limit (s) prior to increasing the Reactor Coolant System temperature above 200*F.

SURVEILLANCE REQUIREMENTS

4. 6.1. 2 The containment leakage rates shall be demonstrated at the follow-ing test schedule and shall be detemined in conformance with the criteria 343 specified in Appendix J of 10 CFR Part 50:4mg the[ methods, anc provisionsf of E! li45.4 - 1372s Three Type A tests ([vJer1_ Integrated Containment Leakage Rate) a.

shall be conducted at[40 10 =teintervals during shutdown at l

either Pa (50 psig) orlat Pt (25 psig) during each 10-year service period.

~

cyt vor e mhe equl CALVERT' CLIFFS - UNIT 1 3/4 6-2 AmendmentNo.75,MM,///,

m+%ggg MS W FDn M

POR P

01.3 CONTAINMENT SYS' EMS, COM,TAINMENT LEAKAGE LIMITING CONDITION FOR OPERATION 3.6.1.2 Containment leakage rates shall be limited to:

a.

An overall integrated leakage rate of:

1.

<L (346,000 SCCM), 0.20 percent by weight of the containment liir,per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at P,,

50 psig, or t (44,600 SCCM).'O.042 percent by weight of the containment 2.

<L air per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at a reduced pressure of P, 25 psig.

SCCM) for all penetra-tions and valves subject to Type B In(207.600d C tests when pressurized A combined leakage rate of < 0.60 L b.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

With either (a) the measured overall integrated contairrnent leakage rate

(

exceeding 0.75 L SCCM), or 0.75 L (33,400 SCCM), as applicable, or (b) with the Sea (259,500sured combined leakage rite for all penetrations and valves subject to Types B and C tests exceeding 0.60 L, restore the leakage a

rate (s) to within the limit (s) prior to increasing the Reactor Coolant System temperature above 200'F.

SURVEILLANCE REQUIREMENTS 4.6.1.2 The containment leakage rates shall be demonstrated at the follow-ing test schedule and shall be detemined in confomance with the criteria, ified in endix J of 10 CFR 50: uit the[hiethods, and provisions) a.

Three Type A tests (Overall Integrated Containrc.ent Leakage Rate) shall be conducted at 90

  • 10 matN intervals during shutdown at l

either Pa (50 psig) or at Pt (25 psig) during each 10-year service period, ch ofPox

( c CALVERT CLIFFS - UNIT 2 3/4 6-2 AmendmentNo.H,/),h