Docket Nos. 50-325, 50-324 License Nos. DPR-71, DPR-6?
Carolina Power and Light Company ATTN: Mr. Lynn W. Eury Executive Vice President Power Supply P. O. Box 1551 Raleigh, NC 27602 Gentlemen:
SUBJECT:
MEETING
SUMMARY
- BRUNSWICK This refers to the Management Meeting held at your request in the Region 11 Office on December 3,1990.
The purpose of the meeting was to discuss the Brunswick Design Basis Reconstitution (DBR) Project.
A list of attendees, a summary, and a copy of your handout are enclosed.
It is our opinion that this meeting was beneficial in that it provided better understanding of the intended scope and depth of your Brunswick D: d Project.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code -of Federal Regulations, a copy of this letter and its enclosures will be placed in the NRC Public Document Room.
Should you have any questions concerning this matter, please contact us.
Sincerely, Luis A. Reyes, Director Division of Reactor Projects
Enclosures:
1.
List of Attendees 2.
Meeting Summary 3.
Licensee Handout cc w/encls:
R. B. Starkey, Jr.
, Vice President Brunswick Nuclear Project P. O. Box 10429 Southport, NC 28461 (cc w/encls continued - See page 2)
Abh i
l 9012270262 901214 ADOCKODOOO32h PDR p
s DEC 141990 Carolina Power and Light Company 2
(cc w/encls cont'd)
J. L. Harness Plant General Manager Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461 R. E. Jones, General Counsel Carolina Power & Light Company P. O. Box 1551 Raleigh, NC 27602 Ms. Frankie Rabon Board of Commissioners P. O. Bcx 249 Bolivia, NC 28422 Dayne H. Brown, Director Division of Radiation Protection N. C. Department of Environmental, Commerce & Natural Resources P. O. Box 27687 Raleigh, NC 27611-7687 H. A. Cole Special Deputy Attorney General State of North Carolina P. O. Box 629 Raleigh, NC 27602 Robert P. Gruber Executive Director Public Staff - NCUC P. O. Box 29520 Raleigh, NC 27626-0520-bec w/encis:
cument Control Desk H. Christensen, Rll T. Le, NRR D. Norkin, NRR NRC Resident Inspector d.S. Nuclear Regulatory Commission
,. Star Rte. 1, Box 208 Southport, NC 28461 RI RP P
RI RP Ril:03 las n RCarroll DVerrelli
>rscho 12//y 90 12/[p/90 12/ r/90 2/q90
ENCLOSURE 1 LIST OF ATTENDEES Carolina Power and Light Company R. B. Starkey, Jr., Vice President, Brunswick Nuclear Project A. M. Lucas, Manager, Nuclear Engineering S. D. Floyd, Manager, Nuclear Licensing J. M. Brown, Manager, Brunswick Engineering. Support M. R. Oates, Manager, Brunswick Licensing D. R. Markle, Project Manager, Phase I Robinson Design Basis Reconstitution E. A. Bishop, Principal Engineer, Engineering Support E. M. Northeim, Project Engineer, Brunswick Design Basis Reconstitution Nuclear Regulatory Commission J. L. Milhoan, Deputy Regional Administrator, Region II (RII)
L. A. Reyes, Director, Division of Reactor Projects (DRP), RII A. F. Gibson, Director, Division of Reactor Safety (DRS), Ril E. W. Merschoff, Deputy Director, DRP, RII C. A. Julian, Chief, Engineering Branch, DRS, RII D. M. Verrelli, Chief, Reactor Projects Branch 1, DRP, RII D. P. Norkin, Chief, Team Inspection Development Section, Office of Nuclear Reactor Regulation (NRR)
R. E. Carroll, Acting Chief, Recctor Projects Section lA, DRP, RIl F. Jape, Chief, Engineering Assessment Section, DRS, RII R. L. Prevette, Senior Resident Inspector - Brunswick, DRP, RII T. Le, Project Manager, NRR M. M. Glasman, Project Engineer, DRP, RII l
t
{
l
5 ENCLOSURE 2 MEETING
SUMMARY
The Deputy Regional Administrator opened the meeting (DBR) Project.
by expressing NRC's interest in the Brunswick Design Basis Reconstitution CP&L then began their presentation, indicating that the Brunswick DBR Project will not only result in a systematic approach to finding / correcting potential design.
deficiencies, but provide a single-source for design basis information; thereby improving efficiency and quality of design changes and providing the ability for timely response to Operations' requests.
It was further stated that design basis information would be collected for approximately 67 systems, but design basis documents (DBD) would only be prepared for those 27 systems required for safe shutdown or accident mitigation. Also, 12 generic DBDs are to be prepared to capture such items as Appendix R, Station Black Out, etc....In addition, CP&L indicated that the electrical distribution system has been captured as a separate entity under the DBR effort and will specifically include calculation reconstitution.
CP&L projected the completion of the initial DBR effort to be in 1993, with subsequent updates being planned to keep the DBDs current.
As presented, the CP&L definition of a system design basis consists of the functional and regulatory requirements the system design must meet and the the codes / standards of record that restrain / bound its design.
Subsequent to the approval'of each system DBD, CP&L indicated that a validation will be performed of the-system's critical design basis parameters.
The validation process is to
. include a review (as necessary) of system calculations / analyses of record, system descriptive design documents, operational procedures, and. field supplied data.
When questioned, CP&L indicated that the DBR would extend to the component level if said component was a key element to the associated systems's performance; otherwise validation would go no further than the system level.
-Following a discussion of the DBR Project's discrepancy resolution process and CP&L's' intentions to maintain contractor oversight, it was mutually agreeded that a progress meeting 'would be tentatively scheduled in the -third quarter of 1991.
The Deputy Regional Administrator closed the meeting by stating he appreciated the presentation, and that NRC would continue to follow CP&L's progressa
ENCLOSURE 3
\\
(
CD&L CAROLINA POWER & LIGHT COMPANY PRESENTATION TO THE NUCLEAR REGULATORY COMMISSION AT ATLANTA, GEORGIA ON THE 1
1 i
BRUNSWICK NUCLEAR PLANT DESIGN BASIS RECONSTITUTION PROJECI' DECEMBER 3,1990 (5441NED/che)
e AGENDA INTRODUCTION Brown HISTORICAL EVOLUTION Bishop BNP DESIGN BASIS RECONSTITUTION PROJECT OVERVIEW Northeim PROJECT SCHEDULE Northeim 1990 PROJECT ACTIVITIES STATUS Northeim CONCLUSION Brown (5441MED/che)
~
l INTRODUCTION CP&L IS COMMITTED TO DESIGN BASIS CAPTURE AND CONTROL PROVIDES SINGLE-SOURCE FOR DESIGN BASIS INFORMATION IMPROVES EFFICIENCY AND QUALITY OF DESIGN CHANGES ABILITY TO PROVIDE TIMELY RESPONSES TO OPERATIONS REQ'UESTS SYSTEMATIC APPROACH TO FINDING / CORRECTING POTENTIAL DESIGN BASIS DEFICIENCIES ELEMENTS OF THE PROJECT SCOPE HAVE INCREASED SIGNIFICANTLY CP&L HAS PRODUCED MEASURABLE AND SIGNIFICANT PROGRESS
($441NED.BNP/cy1)
I, 2
HISTORICAL EVOLUTION DESIGN TURNOVER PROJECT SYSTEM CRITERIA DOCUMENTS 79-14 CALCULATION RECONS 7ITUTION SW. REVIEW REPORT CP&L QA AUDIT OF THE ELECTRICAL DISTRIBUTION SYSTEM NUMARC-P (5441NED/che)
-... ~... - -
[
DESIGN TURNOVER PROJECI' SYSTEM CRITERIA DOCUMENTS INFORMATION RELOCATED TO CP&L UE&C CRITERIA DOCUMENTS WITH GE REVIEW PLANT MODIFICATION REVIEW LISTING OF DESIGN CALCULATIONS FUTURE DESIGN CONTROL 79-14 CALCULATION RECONSTITUTION (5441MED/che)
.~.
1 SSFI REVIEW REPORT CAPTURE OF REGULATORY REQUIREMENTS CALCULATION INPUT REVIEW GENERIC ISSUE DESIGN BASIS DOCUMENTS DESIGN CONTROL PROCEDURE ENHANCEMENTS AND TRAINING EMPHASIZED PRIORITY ON A/E SYSTEMS EVALUATE OTHER SYSTEMS FOR HYDRAULIC l
TESTING ADEQUACY (5441NED.BNP/cyn)
~
.... ~. -.
J CP&L QA AUDIT OF THE ELECTRICAL DISTRIBUTION SYSTEM DESIGN BASIS NOT READILY RETRIEVABLE SOME SUPPORTING DOCUMENTATION UNAVAILABLE OR INADEQUATE (5441NED/6e)
I
mMmdi,K.
E 5$'
DBD PROGRAM REVIEW W
ASSESSED AGAINST FINAL NUMARC GUIDANCE
\\
REVIEWED AGAINST EXISTING CP&L DBD PROGRAMS EXPAND REVIEW TO INCLUDE ADDITIONAL DESIGN CHANGE DOCUMENTS (ENGINEERING EVALUATIONS, SPECIFICATIONS, ETC.)
CAPTURE OF ENGINEERING FILE INFORMATION REVISION FROM SYSTEM CRITERIA DOCUMENTS TO DESIGN BASIS DOCUMENTS DISCREPANCY RESOLUTION VALIDATION UFSAR CONSISTENCY j
(5441NED/che)
l
~
Brunswick Nuclear Project Design Basis Reconstitution Oroject O
Y IB pl
~
O
$#O O
O
/
- 1. s
$ N "h1 p-psf Y5 99 i
l j
(
l I
/
(
/
BNP DESIGN BASIS RECOMSTITUTION PROJECT APPLICABILITY:
PLANT SYSTEMS REQUIRED FOR SAFE SHUTDOWN OR ACCIDENT MITIGATION (27 SYSTEMS)
OBJECTIVES:
STRUCTURE THE CURRF,NT DESIGN BASES AND CALCULATIONS OF RECORD CONTROL THE CURRENT DESIGN BASES AND CALCULATIONS OF RECORD VALIDATE CRITICAL DESIGN PARAMETERS RELATED TO THE PLANT PROCEDURES AND HARDWARE AGAINST THE STRUCTURED DESIGN BASIS CREATE AND MAINTAIN USER FRIENDLY DOCUMENTS AVAILABLE TO CP&L CORPORATE AND SITE PERSONNEL (5441tED.BNP/cgn)
BNP DESIGN BASIS RECONSTITUTION PROJECT ESTABLISH HIEPARCHY OF DESIGN INFORMATION l
1 1 P i
DESIGN INFORMATION COLLECTION AND CONSOUDATION 1 r 1 r ENGINEERING EVALUATION DISCREPANCY s
i AND SYSTEM RESOLUTION 080 DEVELOPMENT J L VAUDATION
, r SYSTEM DBD CONTROL W "'D' W-
CP&L DEFINITION OF DESIGN BASIS A SYSTEM DESIGN BASIS CONSISTS OF THE FUNCTIONAL AND REGULATORY REQUIREMENTS THE SYSTISM DESIGN MUST MEET AND THE CODES / STANDARDS OF RECORD THAT RESTRAIN / BOUND ITS DESIGN (5441MED/che)
HIERARCHY OF DESIGN IN.:09MATION N T-E SYSTEM DESIGN EVOLUT ON SYSTEM DESIGN BASIS REQUIREMENTS
- SYSTEM FUNCTIONAL REC'ir. MENTS l
- REGULATORY IMTOSED / CP&L COMMITTED i
DESIGN REQUIREMENTS DESIGN CODES /STD3 OF HECORD DBD
llNAL, UNLESS SUPERCEDED) r t
.y<
l 1
SYSTEM CALCS &
ANALYSES OF RECORD SYSTEM DESCRIPTIVE i
DESIGN DOCUMENTS l
PROCUREMENT DRAWINGS l SPECIFICATIONS
DESIGN INFORMATION COLLECI' ION AND CONSOLIDATION ACQUIRE THE ORIGINAL SYSTEM DESIGN BASIS; I.E., SYSTEM REGULATORY AND FUNCTIONAL REQUIREMENTS AND CODES / STANDARDS OF RECORD.
PRESSURE, FLOWS, LEVELS GENERAL DESIGN CRITERIA, COMMITMENTS CODE ADDENDA CONSOLIDATE POST-OPERATING LICENSE (OL)
DOCUMENT AND ACQUIRE THE SYSTEM CALCULATIONS / ANALYSES OF RECORD.
SYSTEM IDENTIFICATION AND HISTORY OF DESIGN CHANGE DOCUMENTATION (5441NrD/che)
i ENGINEERING EVALUATION AND SYSTEM DBD DEVELOPMENT COLLATE THE INFORMATION INTO A DRA'N SYSTEM DBD.
HISTORICAL REVIEW OF DESIGN CHANGE DOCUMENTATION FOR IMPACT ON DESIGN BASIS.
PERFORM INTERDISCIPLINE DESIGN
' VERIFICATION OF THE DRAFT SYSTEM DBD.
APPROVE AND ISSUE IT AS A CONTROLLED DOCUMENT (PRIOR TO VALIDATION).
l:
(5441ED/che)
l,,..
\\
VALIDATION SUBSEQUENT TO THE APPROVAL OF EACH SYSTEM DBD, VALIDATION WILL BE PERFORMED OF THE SYSTEM'S CRITICAL DESIGN BASIS PARAMETERS
- l CRITICAL DESIGN BASIS PARAMETERS ARE THOSE THAT MEET THE DEFINITION OF DESIGN BASIS
" W 1WD/che)
f 1
VALIDATION PERFORMANCE OBJECTIVES PROVIDES ASSURANCE THAT THE SYSTEM DESIGN, OPERATION, AND SURVEILLANCE TESTING ARE CONSISTEN J WITH THE CRITICAL DESIGN BASIS PARAMETERS INCLUDES A REVIEW, AS NECESSARY, OF SYSTEM CALCULATIONS / ANALYSES OF RECORD, SYSTEM DESCRIPTIVE DESIGN DOCUMENTS, OPERATIONAL PROCEDURES, AND FIELD. SUPPLIED DATA, E.G.,.
SURVEILLANCE TEST RESULTS; CALIBRATION DATA, AND FIELD INSPECTION WHERE NEEDED.
j' (5441NED.BNP/cyQ
~.
DISCREPANCY RESOLUTION A PROCEDURE HAS BEEN DEVELOPED THAT WILL:
USE A PROGRAMMATIC APPROACH TO IDENTIFY, CONFIRM, PRIORITIZE, TRACK, AND CLOSE OUT EACH POTENTIAL DISCREPANCY ADHERE TO 10 CFR REPORTABILITY REQUIREMENTS RELY ON EXISTING CP&L PROCEDURES / GUIDELINES l
l (5441MG.BNP/cgn)
Diceroponey Rooelutien Presooo 1
Discrepancy Screening and Prioritization I
Y Safety N
Concern Y
Operability Reportability 4
Evaluation Evaluation V
T Operability N
N, eportability issue issue s
,Y Y
y Take Tech l
Spec or Report Other Action To NRC y
v v
Final Report Review 4
l
~
+
Closeout
', s..
SYSTEM DBD CONTROL INTEGRATE THE DBD INTO THE DESIGN-CONTROL PROCESS FOR LONO-TERM MAINTENANCE ADMINISTRATIVE PROCEDURE REVISIONS WHICH ENSURE MAINTENANCE OF DBD INTEGRITY ll L
L 1
(5441NED/che)
_. ~.
PROJECT COST SYSTEM DESIGN BASIS
$10,000,000 DOCUMENTS AND VALIDATION ELECTRICAL
$22,000,000 DISTRIBUTION / SEISMIC CALCULATION RECONSTITUTION TOTAL EFFORT
$32,000,000 SPENT PRIOR YEARS
$5,000,000
/
h a # o,, \\
/ ow y, -
/
U!#
C
($ V F
1 (M41NED.BNP/cgn)
i PROJEG SCHEDULE SYSTEM DBD CONTROL - ADMINISTRATIVE PROCEDURE REVISIONS 3/31/91 79-14 CALCULATION RECONSTIT.UTION 12/31/91 DESIGN INFORMATION COLLEGION &
CONSOLIDATION 12/31/91 SYSTEM DBD DEVELOPMENT AND VALIDATION 12/31/93 ELECTRICAL DISTRIBUTION CALCULATION RECONSTITUTION 12/31/93 (5441NED/che)
I i
SYSTEM DBD DEVEL PMENT AND VALIDATION t
GROUP 1991 1992 1993 i
wnw/w/wmwwwmmm 1
1 w/wwmmwwwm l
2 I
i i
vnwymm/wwwm?m 3
i I
i wemmm:rmwm, 4
l I
i rehwwwmM
- DBD DEVELOPMENT l
l
- VALIDATION 4
GROUP 1 GROUP 2 GROUP 3 GROUP 4
(
DBD-51 DC ELECT DBD-19 HPCI DBD-02 REACT. RECIRC.
DBD-04 PRESSURE SUPP i
DBD-37.4 DG HVAC DBD-37.1 RB HVAC DBD-20 AUTO DEPRESS. SYS. DBD-05 STANDBY LIO. CONTPOL I
DBD-24 CAD /CAC DBD-50.1 DG EMER POVER DBD-03 REACT. PROT. SYS.
DBD-46 INST. 8. SERV. AIR i
DBD-37 CB HVAC DBD-38 FUEL DIL DBD-23 CONTAINMT. PEN DBD-58 STRUCTURES l
DBD-52 120 VAC ELEC DBD-12 PRI. CONTAINMT. ISO. DBD-18 CORE SPRAY DBD-11 RAD. MONITORING i
DBD-10 SBGTS DBD-17 RHR DBD-09 NEUTRON MONIT.
D B D-01 NUCLEAR BOILER i
l DBD-39 EMERG. DIESEL DBD-43 SERVICE VATER DBD-08 CRD HYDRAULIC l
GENERATOR l
^
1990 PROJECT ACTIVITIES STATUS SSFI REVIEW REPORT COMPLETED.
ASSESSMENT OF NUMARC & CP&L PROGRAMS COMPLETED.
UE&C DESIGN TURNOVER (85% COMPLETE)-
GE DESIGN TURNOVER (10% COMPLETE) 9 OF 15 SYSTEM DBDs IN PROCESS.
CP&L LICENSING FILE REVIEW (40% COMPLETE).
CALCULATION IDENTIFICATION (APPROXIMATELY 4,000 CALCULATIONS IDENTIFIED / LOCATED).
SYSTEM IDENTIFICATION FOR APPROXIMATELY 3000 PLANT MODIFICATIONS COMPLETE.
INPUT TO. DESIGN CONTROL DATA BASE HAS STARTED.
(5441MED/che)
t 1990 PROJECT ACTIVITIES STATUS (cont'd)
FIVE GUIDELINES APPROVED 79-14 CALCULATION RECONSTITUTION LARGE BORE PIPING - 80%
COMPLETE ELECTRICAL DISTRIBUTION CALCULATION RECONSTITUTION U1 DC FIELD WALKDOWN COMPLETED-U1 AC FIELD WALKDOWN IN PROGRESS U1 DC LOOP ANALYSIS (80%
COMPLETE) 1 MAJOR DC VOLTAGE CALCULATION APPROVED (5441ED/che)
's..
CONCLUSION CP&L IS COMMITTED TO DESIGN BASIS CAPTURE AND CONTROL ELEMENTS OF THE PROJECT SCOPE HAVE INCREASED SIGNIFICANTLY s
CP&L HAS PRODUCED MEASURABLE AND SIGNIFICANT PROGRESS 1
e CP&L IS PROVIDING CONSISTENCY AMONG OUR NUCLEAR FACILITIES WITH THE CENTRAL DESIGN ORGANIZATION CP&L WISHES TO CONTINUE PERIODIC PROGRESS REVIEWS WITH NRC L
(5441NED/che)
- -