Responds to NRC 830607 Ltr Re Violations Noted in IE Insp Repts 50-348/83-13 & 50-364/83-11.Corrective Actions: FNP-O-AP-45 Revised on 830728 to Require All Abnormal & Emergency Procedures Be Reviewed on Annual Basis
ML20024F537
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/11/1983
From: Clayton F
ALABAMA POWER CO.
To: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20024F518 List:
References
NUDOCS 8309090458
Download: ML20024F537 (2)


Text

{{#Wiki_filter:__ M:mng Addrsss p

  • Alabama Power Company
 * #.
  • 600 North 18th Street Post Office Box 2641

- Birmingham, Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr. AlabamaPower gn1;lJ;;22dl"' the southern MCtrC System August 11, 1983 Docket No. 50-348 Docket No. 50-364 en u)  %.Cm E ',$ Mr. R. C. Lewis C) 'O U. S. Regulatory Commission 9

                                                                                                              'c.n Region 11                                                                                                  

101 Marietta Street, N.W. P 3 Suite 3100 Atlanta, GA 30303 9 2,$

                                                                                                                            '~'

J. M. Farley Nuclear Plant NRC Inspection cp

SUBJECT:

Of April 25-29, 1983 and May 1-6, 1983 RE: 1) Report Number 50-348/83-13 & 50-364/83-11

2) Response to Violation Dated July 6,1983 From Mr. F. L. Clayton to Mr. R. C. Lewis

Dear Mr. Lewis:

This letter refers to the violation in the referenced inspection report which states:

                        "10 CFR 55, Appendix A, Section 3.d requires each licensed operator review the contents of all Abnormal and Emergency Procedures on a regularly scheduled basis. Measures have not been established to assure that these requirements are performed. In addition, the frequency for accomplishing this requirement has not been established."

In the referenced response to this violation dated July 6,1983, it was stated that licensed personnel would review all Abnormal and Emergency Procedures on a two-year cycle in accordance with FNP-0-AP-45. It was determined that a two-year review cycle is inadequate. Therefore, a revi-sion was incorporated into FNP-0-AP-45 on July 28, 1983 which requires that all Abnormal and Emergency Procedures be reviewed on an annual basis. Affirmation I affirm that this response is true and complete to the best of my knowledge, information and belief. i 8309090458 830901 PDR ADOCK 05000348 PDR G

g. .-

Mr. R. C. Lewis August 11, 1983 Page Two The information contained in this letter is not considered to be of a proprietary nature. Yours very tr C; , fJy  % F. L. Clayton, J r. FLCJ r/DSM:nac/G17 ==- _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . _}}