Forwards IE Insp Rept 50-397/83-30 on 830627-0701.No Noncompliance Noted
ML20024F350
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/18/1983
From: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Carlisle C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20024F351 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8309090304
Download: ML20024F350 (2)


See also: IR 05000397/1983030

Text

.

0

P 84

9'o

,

'

UNITED STATES

t

8

NUCLEAR REGULATORY COMNilSSION

i

Q

. g( ;[E

a-

REGION V

1450 MARIA LANE. SUITE 21Q

,

% ' bd

,o

WALNUT CREEK, CALIFORNI A 94596

v

Docket No. 50-397

JUL 181983

~

Washington Public Power Supply System

P. O. Box 968

Richland, Washington 99352

,

Attention:

Mr. C. S. Carlisle

Program Director

Gentlemen:

Subject: NRC Inspection of WNP-2 (Preoperatiodal Test Phase)

This refers to the routine inspection conducted by Mr. D. J. Willett of this

office on June 27 through July 1, 1983, of activities authorized by NRC

Cc,nstruction Permit No. CPPR-93, and to the discussion of our findings held by

Mr. Willett with Mr. J. D. Martin and other members of your staff at the

conclusion of the inspection.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

No items of noncompliance with NRC requirements were identified within the

scope of this inspection.

,

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of

the date of this letter.

Such application must be consistent with the

requirements of 2.790(b)(1).

'

.

.

8309090304 D30718

I

DR ADOCK 05000

g

\\

-

,

_

_

_,

.-

_ _ _ - - - .

_-

,

. .

..

s

JUL 181983 -

Washin' ton Public Power Supply System

- 2 --

g

Should you have any questions concerning this inspection, we will be glad to

' discuss them with you.

Sincerely,

/s/

D. M. Sternberg, Chief

Reactor Projects Branch 1

Enclosure:

Inspection Report'

No. 50-397/83-30

-

cc w/o enclosure:

k. B. Glasscock, WPPSS

^

~

cc w/ enclosure:

-J. D._ Martin,.WPPSS

n

-,

,

~

-

bec: RSB/ Document Control' Desk (RIDS)

i:'

.

!

,3

Distributed ~by RV:

7

e s

. . .

.4-

J

-.JBM

-

<.

'

! State'of Washington

'

,

/

. Resident Inspector

,

,

4

+

-c .

,

a

>

,

RV )W -

'

_

D.Willett:dh . R. Dodds

-D.Sternberg

7/tj'783-

7/ /.$783

7/j 1/83

,

t