Forwards IE Insp Rept 50-374/83-18 on 830629-0805 & Notice of Violation
ML20024F265
Person / Time
Site: LaSalle 
Issue date: 08/25/1983
From: Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20024F267 List:
References
NUDOCS 8309090154
Download: ML20024F265 (2)


See also: IR 05000374/1983018

Text

._

,

AUG2 5 1983

Docket No. 50-374

Commonwealth Edison Company

ATTN: tir. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by tiessrs. I. Ahmed,

K. R. Naidu, R. tiendez and R. Gardner of this office on June 29 through

August 5, 1983, of acticities at LaSalle County Station, Unit 2, authorized

by Construction Permit No. CPPR-100 and to the discussion of our findings

with tir. D. Shamblin and others of your staff at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in the enclosed Appendix.

A written response is required.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)

will be placed in the NRC Public Document Room unless you notify this office,

by telep'one, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of

the date of this letter. Such application must be consistent with the re-

quirements of 2.790(b)(1).

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter, the enclosure (s), and

your response to this letter will be placed in the Public Document Room.

The responses directed by this letter (and the accompanying Notice) are

not subject to the clearance procedures of the Office of 11anagement and

Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

8309090154 830825

PDR ADOCK 05000374

O

PDR

lb* I

L

r

0-

,

Commonwealth Edison Company

2

A[JG Jg jg33

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

" Original signed by 11. S. Little"

W. S. Little, Chief

Engineering Branch 2

Enclosures:

1.

Appendix, Notice

of Violation

2.

Inspection Report

No. 50-374/83-18(DE)

cc w/encls:

D. L. Farrar, Director

of Nuclear Licensing

D. L. Shamblin, Site

Construction Superintendent

T. E. Quaka, Quality

Assurance Superintendent

G. J. Diederich, Station

Superintendent

R. H. Holyoak, Project Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

.

RIIh/[ RIII

['

R II

RII

RIII

RIII

RIIT .Y

kh

8'4/

th W

<

Naidu/db

Mendez

Ahmedy

Williag

Litt e

Jablonski g S

s rd

08/16/83

g[p/N7

g}

g[Ql/