Forwards IE Insp Repts 50-413/83-19 & 50-414/83-17 on 830719-22.No Noncompliance Noted
ML20024F262
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 08/10/1983
From: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20024F263 List:
References
NUDOCS 8309090148
Download: ML20024F262 (2)


See also: IR 05000413/1983019

Text

_

. _ _ - _

,

\\lPl

O UQ

'

s

}

+ .

.

AUG 101983

Duke Power Company

ATTN: Mr. H. B. Tucker, Vice President

Nuclear Production Department

422 South Church Street

Charlotte, North Carol.ina 28424

Gentlemen:

SUBJECT: REPORT NOS. 50-413/83-19 and 50-414/83-17

This refers to the routine, safety inspection conducted by Mr. J. R. Harris of

this office on July 19 - 22, 1983, of activities authorized by NRC Permit Nos.

CPPR-116 and CPPR-117 for the Catawba facility and to the discussion of our

findings held with Mr. J. C. Rogers, Project Manager, at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

telective examinations of procedures and representative records, interviews with

. personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of the letter. Such application must be consistent with the requirements of

2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

H. C. Dance, Chief

Project Branch 2

Division of Project and

Resident Programs

Enclosure:

Inspection Report Nos. 50-413/83-19

and 50-414/83-17

cc w/ encl: (See Page 2)

o!oo$$f3

0

PDR

\\\\

S 60/

1

.

AUG 101983

,.

,

Duke Power Company'

2

cc w/ enc 1:

~

J. C. Rogers,. Project Manager

J. W. Hampton, Station Manager

bec w/ encl:

~NRC Resident Inspector

Document Management Branch

State of South Carolina

RII

R

RI

h

RII

.JRHarMs:lal

TConlon

AHerdt

G T [ HC

,

0g/g/83

Of/g /83

Of/$ /83

p

y)

0

.