Forwards IE Insp Repts 50-413/83-20 & 50-414/83-18 on 830707-08.No Noncompliance Noted
ML20024F198
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 08/16/1983
From: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20024F199 List:
References
NUDOCS 8309090037
Download: ML20024F198 (1)


See also: IR 05000413/1983020

Text

69% cia /

.

h/b

,

GyJ

M 16153

Duke Power Company

ATTN: Mr. H. B. Tucker, Vice President

Nuclear Production Department

422 South Church Street

Charlotte, NC 28242

Gentlemen:

SUBJECT: REPORT NOS. 50-413/83-20 AND 50-414/83-18

This refers to the special inspection conducted by Mr. V. L. Brownlee of this

office on July 7-8, 1983, relative to the INP0 sponsored Self Initiated Evalua-

tion (SIE) for the Catawba facility and to the discussion of our findings held

with Mr. J. C. Rogers, Plant Manager, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

During this inspection several items were identified for followup review; these

items are identified in the enclosed report.

In accordance with 10 CFR 2.790(a), a cop" of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephcne, within ten days of the date of this letter and submit written applica-

tion to withhold information contained therein within thirty days of the date of

this letter. Such application must be consistent with the the requirements of 10

-CFR2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

H. C. Dance, Chief

Project Branch 2

Division of Project and

Resident Programs

Enclosure:

Inspection Report Nos. 50-413/83-20

and 50-414/83-18

cc:

(Seepage 2)

hD

00

O!ObbN5

G

PDR

gg \\ \\