Monthly Operating Rept for Jul 1983
ML20024F068
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 08/15/1983
From: Ray H, Speer M
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8309080178
Download: ML20024F068 (6)


Text

'>

Southern California Edison Company

& 5-S AN ONOFRE NUCLE AR GENER A TING ST A TION P.O. BOX 128 5 AN C LEMENT E. C A LIFOR NI A 92672 H, 8. R A Y TEtapwoNs August 15, 1963

.1 AriON AN Aoza

"" > a 2-"aa Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

Subject:

Docket No. 50-206 Monthly Operating Report for July, 1983 San Onofre Nuclear Generating Station, Unit 1 Enclosed is the Monthly Operating Report as required by Section 6.9.1.c of Appendix A, Technical Specifications to Provisional Operating License DPR-13 for San Onofre Nuclear Generating Station, Unit 1.

Please contact us if we can be of further assistance.

Sincerely, k.

W i

Enclosures cc:

J. B. Martin (Regional Administrator, USNRC Region V)

A. J. D'Angelo (USNRC Resident Inspector, San Onofre Unit 1) 8309080178 830815 7

PDR ADOCK 05000206 M

l R

PDR 7

I I

~

NRC M0tmlLY OPERATItG REPORT DOCKET to. 50-206 UNIT NAME SONGS - 1 DATE August 15, 1983 COMPLETED BY M. J. Speer TELEPHONE (714) 492-7700 Ext. 59222 p

OPERATING STA'IUS 1.

Unit Name: San Onofre Nuclear Generating Station, Unit 1 2.

Reporting Period: July 1983 3.

Licensed % ermal Power (MWt):

1347 4.

Nameplate Rating (Gross MWe):

456 5.

Design Electrical Rating (Net MNe):

436 6.

Maximum Dependable Capacity (Gross MWe):

456 7.

Maximum Dependable Capacity (Net !He):

436 8.

If Changes Occur In Capacity Ratings (Items Number 3 trough 7)

Since Last Report, Give Reasons:

)

9.

Power Level To Which Restricted, If Any (Net !Ue):

NA

10. Reasons For Restrictions, If Any:

la 2 is Month Yr.-to-Date Cumulative

11. Hours In Reporting Period 744 5067 147667
12. Number Of Hours Reactor Was Critical 0

0 88430.8

13. Reactor Reserve Shutdown Hours 0

0 0

14. Hours Generator On-Line 0

0 84818.15

15. Unit Reserve Shutdown Hours 0

0 0

16. Gross 3 ermal Energy Generated (!fE) 0 0

108,263,046.8

17. Gross Electrical Energy Generated (!fE )

0 0

37,203,434

/

18. Net Electrical Energy Generated (!fE)

-1397

-9801 34,910,819

19. Unit Service Factor 0

0 57.4

20. Unit Availability Factor 0

0 57.4

21. Unit Capacity Factor (Using MDC Net) 0 0

54.2 l

22. Unit Capacity Factor (Using DER Net) 0 0

54.2

23. Unit Forced Outage Rate 0

0 0

l

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

W e current outage began February 27, 1982

25. If Shutdown At End Of Report Period, Estimated Date of Startup: Not yet determined.
26. Units In Test Status (Prior To Cornercial Operation):

Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY la NA 00MMERCIAL OPERATION la 0962u i

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-206 UNIT SONGS - 1 DATE August 15, 1983 COMPLETED BY M. J. Speer TELEPHONE (714) 492-7700 Ext. 59222 MONTH:

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 0 1

0 17 2

0 18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 0

16 0

0962u

\\

)

UNIT SHUTDORIS AND POWER REDUCTI0tG DOGET NO. 50-206 UNIT NME SGIGS - 1 REPORT MORIH JULY 1983 IRTE August 15, 1983 l

000ELETED BY M. J. Speer TELEPHCNE (714) 492-//uu Ext. 59222 Method of I

Shutting Cause & Corrective Duration Down LER System Component Action to l

2 3

5 No.

Date Type (Hours)

Reason Reactor No.

Code 4 Code Prevent Recurrence 1

78 820227 s

744 B

1 NA ZZ NA Extended outage to accouplish seismic backfit and miscellaneous maintenance items.

i 1

l 1

2 3

4 F-Forced Reason:

Method:

Exhibit F - Instructions S-S deduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File D-Regulatory Restriction 4-Continuation from (NUREG 0161)

E-Operator Training & License Examination Previous Month F-Administrative 5-Reduction of 20%

5 G Operational Error (Explain) or Greater in the Exhibit H-Same Source H-Other (Explain)

Past 24 Hours 6-Other (Explain) 0962u

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.

50-206 UNIT SONGS - 1 DATE August 15, 1983 COMPLETED BY M. J. Speer TELEPHONE (714) 492-7700 Ext. 59222 July 1 - 31 The Unit remains shutdown to upgrade seismic restraints and to perform miscellaneous maintenance.

i 1

0962u

,s REFUELING INFORMATION DOCKET NO.

50-206 UNIT SONGS - 1 DATE August 15, 1983 COMPLETED BY M. J. Speer j

TELEPHONE (714) 492-7700 Ext. 59222 y

'l.

Scheduled date for next refueling shutdown.

Not yet determined.

2.

Scheduled date for restart following refueling.

Not yet determined.

3.

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Not yet determined.

What will these be?

Not yet determined.

4.

Scheduled date for submitting proposed licensing action and supporting information.

Not yet determined.

5.

Important Licensing considerations associated with refueling, e.g. new or different fuel design or supplier, l

unreviewed design or performance analysis methods, i

significant changes in fuel design, new operating procedures.

l Not yet determined.

l 6.

The number of fuel assemblies.

a)

In the core.

157 b)

In the spent fuel storage pool.

94 7.

Licensed spent fuel storage capacity.

216 Intended change in spent fuel storage capacity.

NONE 8.

Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

l Not yet determined.

0962u