i Lgig NUREG-0485 Vol. 5, No. 7 US July 31,1983 e
1,!
SYSTEMATIC EVALUATION PROGRAM STATUS
SUMMARY
REPORT UNITED STATES NUCLEAR REGULATORY COMMISSION p enauq 8 '-
Y 1
- Available from N RC/GPO Sales Program Superintendent of Documents Government Printing Office Washington, D. C. 20402 '
A year's subscription consists of 12 issues for
~
this publication.
Single copies of this publication are available from National Technical information Service, Springfield, VA 22161 Microfiche of single copies are -
available from NRC/GPO Sales Program Washington, D. C. 20555 i-r 5
1 b
1 l
I i
I
i NUREG-0485 l
Vol. 5, No. 7 l
July 31,1983 l
SYSTEMATIC EVALUATION PROGRAM STATUS
SUMMARY
REPORT Prepafed for: OFFICE OF NUCLEAR REACTOR REGULATION Prepared by: OFFICE OF RESOURCE MANAGEMENT UNITED STATES NUCLEAR REGULATORY COMMISSION
,f. ~.
h j o '. -
~).
-*?
Bft9 63 Wk.f&
3 2 3 William T. Russell, Chief Dennis M. Crutchfield, Chief Systematic Evaluation Program Branch Operating Reactors Ilranch 5 Division of Licensing Jivision of Licensing f
Office of Nuclear Reactor Regulation Office of Nuclear Reactor Regulation i
i l
TABLE OFCONTENTS SECTION I SECTION ll SECTION lli OVERALL STATUS PLANT TOPIC REVIEWS IPSAR SUPPLEMENT SEP TOPIC LIST 1-2 to 1-3 BIG ROCK POINT 2-2 to 2-5 PALISADES 3-2 to 3-3 DRESDEN 1 2-6 GINNA 34 to 3-5 DEFINITIONS OF STATUS 1-4 DRESDEN 2 2-7 to 2-10 OYSTER CREEK 3-6 to 3 8 SEP TOPIC
SUMMARY
1-5 GINNA 211 to 2-14 DRESDEN 2 3-9 to 3-10 STATUS REPORT l
HADDAM NECK 2-15 to 2-18 MILLSTONE 1 3-11 to 3-13 PROGRESS TOWARD 1-6 LACROSSE 2-19 to 2-22 COMPLETION (Graph)
YANKEE 3-14 to 3-15
~
INTEGRATED PLANT 1-7 HADDAM NECK 3-16 to 3-17 SAFETY ASSESSMENT OYSTER CREEK 2-27 to 2-30 SCHEDULE PALISADES 2-31 to 2-34 SEP TOPIC STATUS BY 1-8 SAN ONOFRE 2 35 to 2-38 REVIEW DIVISION YANKEE 2-39 to 2-42 (Summary Table) i
SUMMARY
TABLE 1-9 IPSAR SUPPLEMENT l
lSSUES S.UMMARY GRAPH 1-10 IPSAR SUPPLEMENT ISSUES l
l
(
l
a a
m u,
i i
l I
I i
l O
b-()
LaJ C#7 P
l f
I
SYOTEMATIC EVALUATION PROZRAM TCPIC LIGT j
Trip t C #
Ittt(
TOPIC f TI TL E TOPIC f
- fly, 11-1 A. Euclusion Area Authority and Centrol ggy,4 g, y'#**d" "'" U" IV.2
- 8. Population Distetthstion ileactivity Control Systems including Functional Deste and Protection Against Stegle Failures
. Patenttal naaerds or (hanqn en F3tenttal
,tV.3 Sist Jet Pumps Operatlng Indications Masards Dae to Iransportation. institutional g, ygygg n, g g g g g ges Inesstr'el. and Melitary f aciltties V.1 Caspliante with Codes and Standards (10 CFR III-4 C. Internally Generated Missiles 50.55a )
11 2
- 4. Severe seather Phenceena V-2 Applicable Code Cases
- 8. Onsite Meteorological measurements Program V-3
- Overpressurtaation Protection C. Atmosphertc f ransport and Otf fuston Charac.
teristics for Accident Analysis V.4 Piping and Safo End Integrity D. 5f te Prowinity Misstles (including Atrcraf tl
- D.
Avellability of Meteorological Data in the V-5 Reactor Coolant Pressure Boundary (RCP8)
Control Room ggg.g A, ggfects of Pipe Breat on Structures. Systems Leakage. Detection and Components Insede Containment 11-3
- . HydrologtC Description
- 8. Pipe Break Dutside Containment V7 Reactor Coolant Pump Dwerspeed
- 8. Flooding Potential and Protectton Require.
seats V-8
- 5 team Generator (SG) Integrity
'- tapabt lity of Operating Plant to Cape II!.7 A. Inservice Inspectson, including Prestressed V.g with Desty Basts Ilooding Conditions Concrete Containments with (tther Grouted Reactor Core Isolation Cooling System (8 tat) or Ungrouted tendons V-M l
C. Safety-related Water Supply (Ultimate Heat A. RMR Meat f achanger Tube FaHums Sue (UMS))
- 8. Design Codes. Deste Crtterta. Load
- 8. RHR Reliability tions, and Reactor Cavity Deste 11-4
.rology and Setssolo, 8 Tectonic Province C. Delaninatton of Prestressed Concrete Con.
Pressure Systems tatnnent 5tructures
- 8. Prosiett, of Capable Tectonic 5truttures
- 8. RHR Interlock Requtmments in Plant Vicletty D. Contatnnent Structural Integrity Tests V*ll
,A. Water P t of Botling Water Reactor
- 7 L. Mist orttal Sessancity witrin /JG Mlles of
((g.8 A. E t ose Parts Monitortng and Core Barrel Plans Wibratton Monttoring U8
- M " P o
- 8. Control Rod Drtve Mechanism lategrity VI.1 grgante Materials and Post Acctdent J. 5 abeltry of Slopes C. Irradiatton Damage. Use of Sensittred whemistry E. Das lategrity Stainiess Steel and Iattgae Reststance VI-2 A. Pressure-Suppresston Type Bid Containments
, D. Core Sups rts and Fuel Integrety
' 8. Subcompartment Analysis T. Settlearnt of Foundations aws Served o
i gu ie= eat lil-g,
Senport Integrity C. Ice Condenser Containment 113 10 Ill.1 t iessificat een of St ructures. Cogo==ts and A. Thermel-Overload Protection for Motors of D. Mass and Enery Release for Possible Pipe isotor-operated Valves Sreak Inside Containment systems I.ressic amt helityl
!II-2 uind and iornado a ad'ac
- 8. Pus s lyen el Integrity e
VI.3 Contatnnent Pressure and Heat Removal A. E f fects of Mit water Level on St ructures Capability III-3 t 'o' kuts and Discnarp valves V I.4 Containment Isolation System 111-11*
B. Structural and Other Consequences (e.g.
ogonent Integrity V I.5
- Combustible Gas Control 8 tenden, of Safety-kelated a quipment se Bas-+nts) of f ailure of underdrain s,o
.g 111 12 LEverannental Qualificattan of Safety Related e
V I-6 Containsent Leat Testing t ea toment
- f. Inservice Insg*ct ion of Water Control Stest-IV-1 tures
- 4. Operetton with te s Than All Loops In-Servtte 1 -
SYSTEMATIC EVALUATION PROGRAM TOPIC LIST TOPIC p TITLE 10PIC f flftt ToplC e g
IV.5 Loss of normal feedneter Flou v l. F. A
- 1. ECC5 te-evaluation to Account f-
- reased ygg.g Instruments for Monttoring Radiation and Process Vessel Need legerature Vartables During AcCtdents IV-6 Feedsater System Ptpe trods Instde and Outside Contstament (PE)
- 2. Upper Plenum Inject 6an Vil-6 Frequency Decay
- 3. ECC5 Actuation System Vll-F Acceptability of Sutng Bus Design on BWR-4 av.7 Reactor Coolant Pug Rotor Setsure and Plants Reactor Coolant Pump Shaf t treak
- 4. Core Spray morale Ef fectiveness VIIl-1 A. Potential Equipent Fatlures Associated utth RV-8 Control Rod Mtsoperatton (System Malfunction V1 f.B E5F Switchover f rom lajection to Rectreulatton a Degraded Grtd voltage or Operator Error) pode (Autoestle ECC5 8ealtgmaent)
VIII.2 Onstte Emergency Power Systees - Diesel IV-g Startup or an inactive Loop or Rectrculation Loop at en lacorrec* Teeperature, and Flou f.enerat or V t-7.C ICC5 Stagle f atle-
. terson and Requtre-Controller Malfunction Causing an lacrease in ments f or toce inq m
.*r to Valves including inde6+wam -
- laterlocss on vill-3 A. Station Sattery Capacity Test Requirements em Core Flow Rate XV-10 Cheatcal and volume Control System Malfunction
- 8. DC Power systen Bus Voltage Monitoring and Annunciat ion t
th Reactor C 1 I. Append 6s t - Electrical Instrumentation and Centrol (LIC) Re-reeteus Vill-4 Electrical Penetrations of Reactor Containment IV-11 Inadvertent Leading and Operetton of a Fuel
- 2. Failure Mode Analysis - ECC5 Assemely in an Improper Posttton II F ul Stor m pectme of M Octbn Accidents M ou r g LOL E
P nce e
11-2 Overhead Handling Systems = Cranes v l-7.D Long Tere Cooling - Passive F at tures (e.g.,
IV-13 Spectrue of Rod Orop Accidents (sedt)
Flooding of Redundant Components)
II-3 Station Service and Cooling Water Systees H-14 0
v i-7.E IC gi and Test for Recirculation 11 4 Saron Additton System e
Con r 5 st M funct on increases Reactor Coolant Inventory 11 5 Ventilatton Systems v e l.F c lat sotation valves Power and Control IV-15 Inadvertent 0poning of a Pidt Pressurtser Safety-1-6 Fire Protectici Relief Valee or a Be Safety /Reitef Valve 3*
Aust1tary f eedsater Syste" XV.16 Radiological Consequences of Failure of Ses11 v!.8 Control Room Habitahtitty Lines Carrying Prteary Coolant Outside Contain-VI.g Main Steam Line Isolation Seal Systee - Bdt 11-1 Appeadt8 I ment 11-10 A. Testing of Reactor Trtp System and Engineered 33 2 Radiological (Effluent and Process) Monitoring gy.y; Steam Generator Saf ety f eatures tecluding Response Tine Systens Tube Fatlore (PWR) f esting e
XIII-1 Conduct of Operat *ans IV.18 Radiological Consequences of Main Steam
- t. Shared Engineered Safety Features. On-site Line f ailure Outside Containment (le)
Emergency Power, and Service Systems for 313!.2 Safegaards/ Industrial security Multiple Untt Factittles H-Is Loss-of-Coolant Accidents Resulting f rom IV-l Decrease en Fe+4 eater leaperature. Increase in Spectrum of Postulated Piping treaks Within Vll.1 A. Isolat6cn of Reactor Protectton System f rom seco ater ilou, lacrease in 5tese Flow and the peactor Coolant Pressure soundary Non-Safety Systems. Including Qualif scations Inadvertent opening of a steam Generator Reltef of Isolation Devices or iafety valve H 20 Radtelogical Consequences of Fue10aseging Accidents (Instde and Outside Contatnnent)
- 8. Trty Urcertataty and Setpotat Analysis Revteu H-2 mtrue of Steae systes Pn.6ag Fattures inside H.
Sent Fud Cad W Achnts of Operating Data Base
,nd outside of Containwnt (Pwu)
IV.
atic44te hansknts mM Was Engineered Safety Featu es (E5F) System Control gy.3
.oss of E nternal Load. Turbine Trtp. Loss of Vll-2 r
Lovc and Design Condenser Vacuve. Closure of Mann Steam Isola
- IV 23 Multiple Tube Failures in Steam Generators tion Valve (bur). and Steen Pressure Regalator VII-3 Systens Required for saf e Shutdown fatlure (Closed)
IV-24 Loss of All A-C Paner f, hon-teergency A-C Paeer to the Station I
XVI Technical 5sectitcations Vll-4 if fects of Failure in Non-5af ety Related g
systems on Selected instarered Saf ety f eatures XVil Operational QA Program SEP Leceneses.
nTopic deleted frone SEP program due to duplication by Three Mile Island (TM11 NRC Action Plan, Unresolved Safety issue or other SEP Topic per May 7,1981 lette w
STATUS DEFINITIONS I
G - Generic 4a-Draft SE Received From Review Branch These topics are being evaluated as part of on-going NRC generic review effort. The ongoin9 generic review and the SEP topic review will be This status is used for internal NRC tracking of closely integrated to improve the effectiveness topic review progress. The status indicates that and efficiency of these efforts and to minimize a draft topic safety evaluation is under mange-ment review.
any impact on licensees. The status and conclu-sions of generic SEP topics will be incorporated in the fiaal safety assessment for each plant.
4b - SAR Received from Licensee X - Deleted Licensee has submitted a Safety Analysis Report (S AR)in accordance with SEP redirection. (See These topics have been verified as not applicable Eisenhut letter to SEP owners of January 14,1981)
The SAR is under review and a Final NRC safety to the design of a specific plant or at being evaluation (status 7) is being prepared. Draf t SE duplicated by the NRC TMI Action Plan, will not be issued for topics with licensee SA R submittal.
Unresolved Safety issue or another SEP Topic per the May 7,1981 letter from G. Lainas to all SEP licensees.
5 - Draf t SE Sent to Utility 1
0 - Topic Not Started A draft topic safety evaluation has been formally This status indicates that the review of the topic transmitted to the licensee for their review and has not started.
certification of the accuracy of the described f acility. Licensees may comment upon NRC i
l conclusions or propose alternatives to NRC posi-tions.
1 - Questions Received From Review Branch 6 - SE Response Received This status is used for internal NRC tracking by NRC of topic review progress. The status indicates that all information necessary to perform a The draft SE has been reviewed and licensee topic evaluation is not available and that ques-tions have been developed and sent to the SEP comments if any have. been formally transmit *ed to the N RC.
hranch.
2 - Questions Sent to 7 - Topic Complete Utility The NRC topic evaluation has been completed and The questions developed in the previous status a final safety evaluation issued. A topic is completed have been formally transmitted to the licensee in several ways: (1 ) The licensee has responded as a request for additional infarmation.
that the NRC draf t safety evaluation (i.e. status 5) is correct, or (2) the licensees comments on the NRC draft safety evaluation (i.e. status 6) have been re-3 - Question Response viewed and if appropriate incorporated into the Received by NRC final safety evaluation, or (3) the licensee has not responded in the time requested, thus concurring The licensee has formally responded to the informa, that the draft safety evaluation is correct.
tion request issued by NRC regarding the topic.
1-4
SEP TOPIC STATUS
SUMMARY
REPORT *
\\
\\
NUMBER OF QUESTIONS QUESTION DRAFT SE SAR SE N
TOPICS TOPIC RECEIVED QUESTIONS
RESPONSE
RECEIVED RECEIVED DRAFT SE
RESPONSE
TOPIC
\\
' GENERIC DELETED NOT FROM SENT TO RECEIVED FROM FROM SENT TO RECEIVED COMPLETE
\\
(G)
(X)
STARTED REVIEW UTILITY BY NRC REVIEW LICENSEE UTILITY BY NRC (7)
PLANT NAME
\\
(0)
BRANCH (2)
(3)
BRANCH (4b)
(5)
(6)
\\
(1)
(4a)
\\
PALISADES 0
47 0
0 0
0 0
0 0
0 90 GINNt 0
45 0
0 0
0 0
0 0
0 92 OYSTER CREEK 0
54 0
0 0
0 0
0 0
0 83 DRESDEN 2 0
49 0
0 0
0 0
0 0
0 88 MILLSTONE 1 0
51 0
0 0
0 0
0 0
0 86 HADDAM HECK 0
47 0
0 0
0 0
0 0
0' 90 YANKEE 0
48 0
0 0
0 0
0 0
0 89 LACROSSE 0
54 0
0 0
0 l-1/
0 0
0 82 BIG ROCK POINT 0
52 0
0 0
0 0
0 0
1 84 SAN ONOFRE 0
48 1
0 0
2 0
1 4
2 79 DRESDEN 1 TOTALS THIS MONTH 0
495 1
0 0
2 1
1 4
3 863 TOTALS LAST MONTH 0
495 1
0 0
2 1
1 4
4 862
- NOTE: Totals do not include Dresden 1,
see page 2-6.
Also -included i s May 7, 1981 deletion letter to all SEP licensees, see footnote paoa 1-3.
1/ FIRE PROTECTION GENERIC ISSUE SER 1-5
cm SYSTEMATIC EVALUATION PROGRAM PHASE II Acm PROGRESS TOWARD COMPLETION 188
. g. g.,..,, g u.
m.-
. m. g. g.
. g. g g W W W g-
$l - -.
g.
,e
. g..
m.
.p.
M.
B.
a..
p.
E E g.._...,
fl _
~
. m.e.:
,,,,,e
, m.,,,,,,,..,i,,,,.,.
i
. g.#,~.
generis =ws. h t. m 68 -
~
~
~
.~
.~
'.an=eim
~
~
,s
=e
=*wi= r =<.
cig _ _. -
. g..
x,.
[*.
T pl a s.
M m-w ie armel s.passi
.e.e.s (par.m.
- s. esse.) 1.ame s.end
.., e,.r.e w.
i
. m.,.,e
,w
. - =n=mr=w mi.ee.8
.e
=w.
=i s.m E.
4g _ _ :-
me w n,s.n s.
i.new rn.
,A a i=e ser=de:
7 p
a r-
- i. --
e-3g _
.,,, w 1.,.
i 29 -
18 t
8 APR JW M SEP DEC MAR JW SEP DEC MAR JW FY-81 FY-82 FY-83 1
1-6
i INTEGRATED PLANT SAFETY ASSESSMENT REPORT (IPSAR) SCHEDULE 1
TOPIC ALL TOPIC ISSUE DRAFT IPSAR ISSUE ISSUE l
COMPLETE REVIEWS ACRS REVIEW COMMISSIDH
^ IPSAR IPSAR PLANT NAME TECHNICAL IPSAR FOR TO EDO AND FINAL SUPPLEMENT TO DL 1/
j.
PALISADES 100 02/26/82C 04/01/82C 09/15/82C 10/29/82C 07/31/83 GINNA 100 02/24/82C 05/27/82C 09/30/82C 01/03/83C 07/31/83 OYSTER CREEK 100 06/28/82C 09/30/82 12/21/82C 02/09/83C 03/31/84 i
h DRESDEN 2 100 07/02/82C 10/29/82C 01/12/83C 03/01/83C 09/30/83 i
MILLSTONE 1 100 06/27/82C 11/05/82C 01/27/83C 03/16/83C 01/30/84 YANKEE 100 11/24/82C 02/11/83C 05/31/83C 07/15/83C LACROSSE 100 12/02/82C 04/15/83C 06/14/83C 07/20/83C 02/28/84 HADDAM NECK 100 09/30/82C 03/18/83C 06/14/83C 07/20/83C 06/30/84 BIG ROCK POINT 99 12/16/82C 08/05/83 09/30/83 SAN ONOFRE 97 02/07/83C TBD TBD 1/. Schedule for each topic for each plant is specified.
OVERALL COMPLETION : 99.6%
TBD-to be determined. Licensee reassing schedule, plant is shutdown.
1-7 i
~
SEP TOPIC STATUS by REVIEW DIVISION
SUMMARY
TABLE PLANT PALISADES GINNA OYSTER DRESCEN MILLSTONE HADDAM YANKEE LACROSSE BIG SAN TOTAL CREEK 2
1 NECK ROCK ONOFRE POINT (IAPM). l/
Michaels Persinko Cwalina Cwalina Persinko Brown Boyle Michaels Scholl McKenna NO. OF TOPICS 137 137 137 137 137 137 137 137 s37 137 1370 DELETED 2/
47 45 54 49 51 47 48 54 52 48 495 APPLICABLE 90 92 83 88 86 90 89 83 85 89 875 57
/
39
/
35
/
36
/
37
/
38
/
38
/
35
/
38
/
37
/
390 /
DL
/
/
/
/
/
/
/
/
/
/
/
/ 57
/ 39
/ 35
/ 36
/ 37
/ 38
/ 38
/ 35
/ 38
/ 40
/ 393 TECHNICAL
/
/
/
/
/
/
/
/
/
/
/
17
/
20
/
19
/
22
/
20
/
20
/
20
/
20
/
17
/
16
/
191 /
REVIEW DOE
/
/
/
/
/
/
/
/
/
/
/
/ 17
/ 20
/ 19
/ 22
/ 20
/ 20
/ 20
/ 20
/ 17
/ 17
/ 192 ASSIGNMENT 1/
/
/
/
/
/
/
/
/
/
/
/
16
/
33
/
29
/
30
/
29
/
32
/
31
/
28
/
30
/
32
/
290 /
DSI
/
/
/
/
/
/
/
/
/
/
/
/ 16
/ 33
/ 25
/ 30
/ 29
/ 32
/ 31
/ 28
/ 30
/ 32
/ 290
/
/
/
/
/
/
/
/
/
/
/
90
/
92
/
83
/
88
/
86
/
90
/
89
/
83
/
85
/
85
/
871 /
COMPLETE
/
/
/
/
/
/
/
/
/
/
/
/ 90
/ 92
/ 83
/ 88
/ 86
/ 90
/ 89
/ 83
/ 85
/ 89
/ 875
/
/
/
/
/
/
/
/
/
/
/
TARGET DATE -
ALL TOPICS JAN 82 JAN 82 MAY 82 JUN 82 JUN 82 AUG 82 AUG 82 SEP 82 SEP 82 DEC 82 TECHNICAL REVIEWS TO DL 1/ Division of Licensing Integrated Assessment Project Manager 2/ Deleted as not applicable, or duplicated by USI TMI Action Plan, or another topic.
1/ These schedules and assignments are consistent with NRR FY 1982-1984 Oper'ating Plan.
I/
[
__/l
- No. Completed / No. Assigned 1-8 STATUS AS OF JULY 31, 1983 e
.___________.ms___._._.
SUMMARY
TABLE i
IPS$R SUPPLEMENT ISSUES-i PLANT PALISADES GINNA OYSTER DRESDEN MILLSTONE YANKEE HADDAM LACROSSE BIG SAN TOTAL i
CREEK 2
i HECK ROCK ONOFRE POINT (IAPM)
Boyle Persinko McKenna Chery Persinko Boyle Brown Brown Scholl McKenna IPSAR SUPPLEMENT S
8 23 10 12 8
10 13 92 i
ISSUES 6
/
8
/
4
/
2
/
3
/
0
/
0.
/
0
/
/
/
23 /
/
/
/
/
/
/
/
/
/
I LICENSEE
/
/
. ~"l3~
/
9
/ 12
/ 8
/ 10
/ 13
/
/
/ 98 SUBMITTALS
/-8
/ 8
/
/
/
/
/
/
/
/
/
/
/
/
5
/
7
/
2
/
0
/
3
/
0
/
0
/
0
/
/
/
17 /
DL
/
/
/
/
/
/
/
/
/
/
/
/ 6
/ 7
/ 22
/ 8
/ 11
/ 8
/ 10
/ 9
/
/
/ St STAFF
/
/
/
/
/
/
/
/
/
/
/
2
/
0
/
1
/
1
/
0
/
0
/
0
/
0
/
/
/
4
/
/
/
/
/
/
/
/
/
/
/
/
/ 2
/ 1
/ 1
/ 2
/ t
/ 0
/ 0
/ 3
/
/
/ 10
[
EMPUT
/
/
/
/
/
/
/
/
/
/
/
0
/
0
/
0
/
0
/
0
/
0
/
0
/
0
/
/
/
0
/
i DSI
/
/
/
/
/
/
/
/
/
/
/
/ 0
/ 0
/ 0
/ 0
/ 0
/ 0
/ 0
/ 1
/
/
/ 1 i
/
/
/
/
/
/
/
/
/
/
/
l 6
/
4
/
3
/
1
/
3
/
0
/
0
/
0
/
/
/
17 /
4 SER ISSUED
/
/
/
/
/
/
/
/
/
/
/
4
/ 8
/ 8
/ 23
/ 10
/ 12
/ 8
/ 10
/ 13
/
/
/ 92
/
/
/
/
/
/
/
/
/
/
/
I I
__/
- No. Received / No. Assigned I/
I 1-9 STATUS AS OF JULY 31, 1983 i
4
IPSAR SUPPLEMENT STATUS ALL PLANTS TACS 88 LIC. RESP. REC'D
,I
,l l
68 --
SER ISSUED GOAL 48 --
/
/
/
, /,'f'(/
28 --
-/
,,,,/ '
/
4:-
g i
i i
i i
i i
i DEC JAN FEB MAR APR MAY JUN JUL AUG SEP DCT NOV DEC JAN FEB MAR APR LitRESPREC'D 6
8 8
11 16 17 21 23 SER INPUT REC'D 1
1 1
1 5
8 18 21 SER ISSUED 1
1 1
1 3
6 14 17 GOAL 8
8 8
1 4
6 14 24 34 41 51 57 68 61 83 83 83 1-18 f-
4 m.
m
= -
h a
.w-.
4_-
i r
i m
O b-fl>
LaJ C/l>
I v
BIG ROCK POINT FACILITY: BIG ROCK POINT 1 TOPIC NO.
REVIEW STATUS REMARKS LICENSEE: CONSUMERS POWER 11-1 A.
DL/SEPB 7
CPCo to NRC 09/02/80 REGION / LOCATION: 4 MILES NORTH EAST OF CHARLEVOI, MICH.
II-1.5 DL/SEPB 7
NRC TO CPCO 09/02/80 DOCKET NO.
05000155 II-1 C.
DL/SEPB 7
NRC to CPCo 05/13/81 POWER CAPACITY: 0240(THERMAL) 067(ELECTRICAL)
II-2 A.
DSI/AEB 7
HRC to CPCo 08/03/81 OL NUMBER: DPR-6 II-2 B.
X HRC to CPCo 05/67/81 N.S.S.S.'
GE.
II-2 C.
DSI/AEB 7
HRC TO CPCO
'0/26/82 A/E FIRM: BECH.
II-2 D.
X NRC to CPCo 05/07/81 SYSTEMATIC EVALUATION PROGRAM BRANCH CHIEF: W. RUSSELL II-3 A.
DE/HGEB 7
NRC TO CPCO 10/26/82 OPERATING REACTORS BRANCH CHIEF: D. CRUTCHFIELD II-3 B.
DE/HGEB 7
NRC TO CPC0 10/26/82 OPERATING REACTORS PROJECT MANAGER: R. EMCH II-3 B.
1.
DE/HGEB 7
NRC TO CPC0 10/26/82 INTEGRATED ASSE3SMENT PROJECT MANAGER: R. SCHOLL II-3 C.
DE/HGEB 7
NRC TO CPC0 10/26/82 II-4 DE/GSB 7
NRC to CPCo 06/08/81 KEY FOR STATUS CODES II-4 A.
DE/GS8 7
NRC TO CPCO 10/12/82 II-4 B.
DE/GSB 7
HRC TO CPCO 10/12/82 G - GENERIC 4a-DRAFT SE RECEIVED FROM REVIEW BRANCH II-4 C.
DE/GSB 7
HRC to CPCo 06/08/81 X - DELETED 4b-SAR RECEIVED FROM II-4 D.
DE/HGEB 7
NRC TO CPCO 07/06/82 0 - TOPIC NOT LICENSEE STARTED 5 - DRAFT SE SENT II-4 F.
DE/HGEB 7
NRC TO CPC0 07/20/82 1 - QUESTIONS RECEIVED TO UTILITY FROM REVIEW BRANCH III-1 DL/SEPB 6(SYS)
CPCO TO NRC 11/23/82 6 - SE RESPONSE RECEIVED DL/SEPB 7(ELEC) Part of VII-3 08/19/81 2 - QUESTIONS SENT BY NRC TO UTILITY III-2 DL/SEPB 7
NRC TO CPCO 12/09/82 7 - TOPIC COMPLETE 3 - QUESTION RESPONSE l
RECEIVED BY NRC (2-2) 9
BIG ROCK POINT TOPIC NO.
REVIEW STATUS REMARKS TOPIC NO.
REVIEW STATUS REMARKS DIV/BR DIV/BR III-5 A.
DE/SEB 7
HRC TO CPC0 12/02/82 III-10 B.
X NRC to CPCo 11/16/79 III-3 B.
X HRC to CPCo 12/26/80 III-10 C.
X NRC to CPCo 11/16/79 III-3 C.
DE/AGEB 7
HRC TO CPCO 10/12/82 III-11 X
HRC to CPCO 05/07/81 III-4 A.
DSI/ASB 7
HRC TO CPC0 11/29/82 III-12 X
NRC to CPCo 05/07/81 III-4 B.
DE/MTEB 7
NRC TO CPC0 11/29/82 IV-1 A.
DL/SEPB 7
HRC to CPCo 10/08/81 III-4 C.
DSI/ASB 7
HRC TO CPC0 10/14/82 IV-2 DSI/ICSB 7
CPCo to NRC 12/22/81 III-4 D.
DE/SAB 7
HRC TO CPCO 08/12/82 IV-3 X
HRC to CPCo 05/04/81 III-5 A.
DL/SEPB 6
CPCO TO HRC 02/15/83 V-1 X
NRC to CPCo 11/27/81 III-5 B.
DL/SEPB 7
HRC TO CPC0 09/16/82 V-2 X
HRC to CPCo 11/16/79 III-6 DL/SEPB 7
HRC TO CPCO 10/18/82 V-3 X
NRC to CPCo 05/07/81 III-7 A.
X NRC to CPCo 05/07/81 V-4 DE/MTEB 7
CPC0 TO NRC 02/18/83 III-7.B DL/SEPB 7
NRC TO CPCO 09/30/82 V-5 DL/SEPB 7
NRC TO CPCO 06/13/83 III-7 C.
X NRC to CPCo 11/16/79 V-6 DL/SEPB 7
HRC to CPCo 03/05/80 III-7 D.
DE/SEB 7
HRC TO CPC0 03/17/82 V-7 X
NRC to CPCo 11/16/79 III-8 A.
DSI 7
NRC TO CPCO 03/02/82 V-8 X
NRC to CPCo 05/07/81 III-8 B.
X NRC to CPCo 09/26/80 V-9 X
HRC to CPCo 11/16/79 III-8 C.
DL/SEPB 7
NRC TO CPC0 06/23/82 V-10 A.
DL/SEPB 7
NRC to CPCo 10/09/79 III-8 D.
X NRC to CPCo 05/07/81 V-10 B.
DL/SEPB 7
NRC TO CPCO 09/10/82 III-9 X
HRC to CPCo 05/07/81 V-11 A.
DL/SEPB 7(ELEC) NRC TO CPC0 12/15/82 III-10 A.
DL/SEPB 7
NRC TO CPCO 02/28/83 V-11 B.
DL/SEPB 7(SYS)
HRC TO CPCO 09/10/82 7(Elec) NRC to CPCo 12/15/82 (2-3)
BIG ROCK POINT TOPIC NO.
REVIEW STATUS REMARKS TOPIC NO.
REVIEW STATUS REMARKS DIV/BR DIV/BR V-12 A.
DL/SEPB 7
NRC to CPCo 10/09/79 VI-7 D.
DL/SEPB 7
NRC to CPCo 08/17/78 V-13 X
NRC to CPCo 05/07/81 VI-7 E.
X HRC to CPCo 05/07/81 VI-1 DE/CEB 7
NRC TO CPC0 11/24/82 VI-7 F.
X NRC to CPCo 11/16/79 VI-2 A.
X NRC to CPCo 05/07/81 VI-8 X
NRC to CPCo 05/07/81 VI-2 B.
X NRC to CPCo 05/07/81 VI-9 X
NRC to CPCo 11/16/79 VI-2 C.
X NRC to CPCo 11/16/79 VI-10 A.
DL/SEPB 7
NRC TO CPCO 11/09/82 VI-2 D.
DSI/CSB 7
NRC TO CPC0 11/30/82 VI-10 8.
X HRC to CPCo 11/16/79 VI-3 DSI/ CSS 7
NRC TO CPCO 11/30/82 VII-1 A.
DL/SEPB 7
HRC TO CPC0 09/02/82 VI-4 DSI/CSB 7(SYS)
HRC TO CPC0 12/09/82 VII-1 B.
DL/SEPB 7
NRC to CPCo 08/17/78 DL/SEPB 7(Elec) NRC to CPCo 11/24/81 VII-2 DL/SEPB 7
HRC to CPCo 02/01/82 VI-5 X
NRC to CPCo 05/07/81 VII-3 DL/SEPB 7(SYS)
NRC TO CPCO 09/10/82 VI-6 DSI/CSB 7
NRC TO CPC0 11/23/82 DL/SEPB 7(Elec) HRC to CPCo 12/17/82 VI-7 A.
1.
X NRC to CPCo 11/16/79 VII-4 X
NRC to CPCo 05/07/81 VI-7 A. 2.
X NRC to CPCo 05/07/81 VII-5 X
HRC to CPCo 05/07/81 VI-7 A. 3.
DL/SEPB 7
NRC TO CPC0 08/20/82 VII-6 DL/SEPB 7
HRC to CPCo 09/21/81 VI-7 A. 4.*
DSI/R$8 7
HRC to CPCo 04/10/79 VII-7 X
NRC to CPCo 11/16/79 VI-7 B.
DSI/RSB 7(Elec) CPCo to NRC 05/20/82 VIII-1 A.
DSI/PSB 7
NRC TO CPC0 07/08/82 7(SYS)) CPCo to NRC 05/20/82 VIII-2 DL/SEPB 7
NRC TO CPCO 08/02/82 VI-7 C.
DL/SEPB 7
NRC to CPCo 08/05/81 VIII-3 A.
DL/SEPB 7
CPCo to NRC 04/22/81 VI-7 C.
1 DL/SEPB 7
NRC to CPCo 02/22/82 VIII-3 B.
DL/SEPB 7
NRC to CPCo 02/22/82 VI-7 C. 2.
DL/SEPB 7
HRC to CPCo 08/05/81 VIII-4 DL/SEPB 7
NRC TO CPCO 07/01/80 VI-7 C. 3.
X NRC to CPCo 11/16/79 l
(2-4)
BIG ROCK POINT TOPIC NO.
REVIEW STATUS REMARKS TOPIC HO.
REVIEW STATUS REMARKS DIV/BR DIV/BR IX-1 DSI/ASB 7
NRC TO CPCO 06/02/82 XV-10 X
NRC to CPCo 11/16/79 IX-2 X
NRC to CPCo 05/07/81 XV-11 DSI/CPB 7
NRC to CPCo 12/02/81 IX-3 DL/SEPB 7
NRC TO CPCO 09/29/82 XV-12 X
HRC to CPCo 11/16/79 IX-4 X
NRC to CPCo 11/16/79 XV-13 DSI/CPB 7(Sys)
NRC to CPCo 12/02/81 DSI/AEB 7(DOSES) HRC to CPCo 01/12/82 IX-5 DL/SEPB 7
NRC TO CPC0 10/12/82 XV-14 DSI/RSB 7
NRC to CPCo 08/18/31 IX-6 DSI/ASB 7
HRC TO CPC0 03/08/83 XV-15 DSI/RSS 7
HRC to CPCo 08/18/81 X
X HRC to CPCo 05/07/81 XV-16 DSI/AEB 7
HRC to CPCo 12/28/81 XI-1 X
NRC to CPCo 12/04/81 XV-17 X
HRC to CPCo 11/16/79 XI-2 X
NRC to CPCo 12/04/81 XV-18 DSI/AEB 7
NRC TO CPCO 09/15/82 XIII-1 X
HRC to CPCo 05/07/81 XV-19 DSI/RSS 7(Sys)
HRC to CPCo 08/18/81 XIII-2 DL/SSPB 7
HRC to CPCo 03/11/81 DSI/AEB 7(DOSES) HRC TO CPCO 10/20/82 XV-1 DSI/RSB 7
NRC TO CPC0 06/25/82 XV-20 DSI/AEB 7
HRC to CPCo 01/12/82 XV-2 X
HRC to CPCo 11/16/79 XV-21 X
NRC to CPCo 05/07/81 XV-3 DSI/RSB 7
NRC to CPCo 06/18/82 XV-22 X
HRC to CPCo 05/07/81 XV-4 DSI/RSB 7
NRC to CPCo 10/16/81 XV-23 X
HRC to CPCo 05/07/81 XV-5 DSI/RSS 7
NRC to CPCo 02/08/82 XV-24 X
HRC to CPCo 05/07/81 XV-6 X
NRC to CPCo 11/16/79 XVI X
NRC to CPCo 11/05/80 XV-7 DSI/RSB 7
HRC TO CPC0 03/11/82 XVII DL 7
HRC to CPeo 08/17/78 XV-8 DSI/CPB 7
NRC to CPCo 12/31/81 XV-9 DSI/RSB 7
NRC TO CPCO 04/07/82 (2-5)
DRESDEN1 FACILITY: DRESDEN 1 LICENSEE COMMONWEALTH EDISON REGION /LOCATIDH 9 MILES EAST OF MORRIS, ILL.
DOCKET NO.
05000010 POWER CAPACITY: 700(THERMAL) 200(ELECTRICAL)
OL NUMBER: DPR-2 H.S.S.S.: GE.
A/E FIRM BECH.
SYSTEMATIC EVALUATION PROGRAM BRANCH CHIEF: W. RUSSELL OPERATING REACTORS BRANCH CHIEF: D. CRUTCHFIELD OPERATING REACTORS PROJECT MANAGER: J. GILBERT By letter dated December 31, 1980 Commonwealth Edison indi-cated that Dresden 1 was undergoing an extensive modifica-tion and was not scheduled for restart until June, 1986.
Also, by letter dated Aprl! 4, 1981, in response to the HRC's January 14, 1981 letter on SEP redirection the licen-see stated that the Dresden 1 SEP review is not being actively pursued, i.e. defered.
(2-6)
DRESDEN 2 l
FACILITY: DRESDEN 2 TOPIC NO.
REVIEW STATUS REMARKS DIV/BR LICENSEE: COMMONWEALTH EDISON II-1 A.
DE/SAB 7
NRC to Ceco 10/06/81 REGIDH/ LOCATION: 9 MILES EAST OF MORRIS, ILL.
II-1 B.
DE/SAB 7
HRC 10/06/81 DOCKET NO.
05000237 II-1 C.
DE/SAB 7
N T CE 08/20/82 POWER CAPACITY: 2527(THERMAL) 0794(ELECTRICAL) 7 R to Ceco 04/24/81 II-2 A.
DSI/AEB OL NUMBER: DPR-19 II-2 B.
NRC to CECO 05/07/81 I
S A$1 7
NRC to CPCo 08/26/81
~ ~ " '
A/E FIRM: 58L.
a
(
I X
HRC to Ceco 05/07/81 SYSTEMATIC EVALUATION PROGRAM BRANCH CHIEF: W.
USSELL hl DE/HGEB 7
NRC TO CECO 09/16/82 II-3 B.
E/HGEB 7
NRC TO CECO 09/16/82 OPERATING REACTORS BRANCH CHIEF: D. C D
OPERATING REACTORS PROJECT MAN GE :
/
1.
D /HGEB 7
NRC TO CECO 09/16/82 INTEGRATED ASSESSM OJ T 1 AGE G CWALINA
'\\
I-DE/HG 1
NRC TO CECO 09/16/82 KEY R ITA ODES II-4 G
7 NRC to CECO 07/09/81
\\
g--(l Ac
E/GSB 7
NRC to Ceco 06/08/81 4a-DRAFT lk(E RE S
-g G
NE FROM VIfW ANCH 4
B.
DE/GSB 7
HRC to Ceco 07/09/81 X
DELETED 4b-SAR RECEIVED FR0 0 - TOPIC NOT LICENSEE II-4 C.
DE/GSB 7
NRC to CECO 06/08/81 STARTED 5 - DRAFT S NT II-4 D.
DE/HGEB 7
HRC TO CECO 06/30/82 1 - QUESTIONS DECEIVED r
FROM REVILJ BRANCH II-4 E.
DE/HGEB 7
NRC TO CECO 09/03/82 ONSE RECEIVED 2 - QUESTIONS SENT NRC II-4 F.
DE/HGEB 7
HRC TO CECO 06/30/82 TO UTILITY 7 - TOPIC COMPLETE III-1 DL/SEPB 7(SYS)
HRC TO CECO 09/02/82 3 - QUESTION RESPONSE DL/SEPB 7(Elec) Part of VII-3 07/07/81 RECEIVED BY NRC III-2 DL/SEPB 7
HRC TO CECO 09/21/82 (2-7)
DRESDEN 2 TOPIC NO.
REVIEW STATUS REMARKS TOPIC NO.
REVIEW STATUS REMARKS DIV/BR DIV/BR III-3 A.
DE/SEB 7
NRC 10 CECO 96/04/82 III-10 8.
X NRC to Ceco 11/16/79 III-3 B.
X NRC to Ceco 11/16/79 III-10 C.
DL/SEPB 7
NRC to Ceco 05/22/79 III-3 C.
DE/HGEB 7
NRC TO CECO 06/30/82 III-11 X
NRC to Ceco 05/07/81 III-4 A.
DSI/ASB 7
NRC TO CECO 06/28/82 III-12 X
NRC to CECO 05/07/81 III-4 B.
DE/MTER 7
NRC TO CECO 09/16/82 IV-1 A.
DL/SEPB 7
NRC to Ceco 10/26/81 III-4 C.
DSI/ASB 7
NRC TO CECO 06/28/82 IV-2 DSI/ICSB 7
CECO to NRC 12/04/81 III-4 D.
DE/SAB 7
NRC to Ceco 02/22/82 IV-3 DE/MTEB 7
NRC to Ceco 01/22/82 III-5 B.
DL/SEPB 7
NRC TO CECO 09/21/82 V-1 X
NRC to Ceco 11/27/81 l
l III-5 B.
DL/SEPB 7
NRC TO CECO 08/20/82 V-2 X
NRC to Ceco 11/16/79 III-6 DL/SEPB 7
NRC TO CECO 06/30/82 V-3 X
NRC to CECO 11/16/79 III-7 A.
X NRC to CECO 11/16/79 V-4 DE/MTER 7
HRC TO CECO 06/29/82 III-7 B.
DL/SEPB 7
NRC TO CECO 09/21/82 V-5 DL/SEPB 7
HRC TO CECO 06/23/82 III-7 C.
X NRC to Ceco 11/16/79 V-6 DL /SEPB 7
NRC TO CECO 09/05/82 III-7 D.
DE/S EB 7
NRC TO CECO 04/13/82 V-7 X
NRC to Ceco 11/16/79 III-8 A.
DSI 7
NRC to Ceco 02/26/82 V-8 X
NRC to Ceco 11/16/79 III-8 B.
X NRC to CECO 09/11/80 V-9 X
HRC to Ceco 11/16/79 III-8 C.
DL/SEPB 7
NRC TO CECO 06/29/82 V-10 A.
DL/SEFB 7
HRC to Ceco 11/08/79 III-8 D.
X NRC to CFCo 05/07/81 V-10 B.
DL/SEPB 7
HRC to CECO 04/24/81 III-9 X
NRC to CECO 05/07/81 V-11 A.
DL/SEPB 7
HRC to CECO 07/10/81 III-10 A.
DL/SEPB 7
NRC to Ceco 06/26/81 V-11 B.
DL/SEPB 7(S s)
HRC to Ceco 64/24/81 DL/SEPB 7(E ec) HRC to CECO 07/10/81 (2-8)
DRESDEN 2 TOPIC NO.
REVIEW STATUS REMARKS TOPIC HO.
REVIEW STATUS REMARKS DIV/BR DIV/BR V-12 A.
DL/SEPB 7
HRC to Ceco 04/16/81 VI-7 D.
DL/SEPB 7
NRC to CECO 10/13/78 V-13 X
HRC to Ceco 05/07/81 VI-7 E.
X NRC to Ceco 05/07/81 VI-1 DE/CEB 7
NRC TD CECO 06/30/82 VI-7 F.
X HRC to CECO 11/16/79 VI-2 A.
X NRC to Ceco 05/07/81 VI-2 X
HRC to CECO 05/07/81 VI-2 B.
X NRC to Ceco 05/07/81 VI-9 X
NRC to CECO 11/16/79 i
VI-2 C.
X HRC to CECO 11/16/79 VI-10 A.
DL/SEPB 7
NRC to Ceco 09/02/82 VI-2 D.
DSI/CSB 7
HRC TO CECO 08/19/82 VI-10 B.
DL/SEPB 7(Sys)
CECO TO NRC 11/03/81 DL/SEPB 7(Elec) HRC TO CECO 09/24/82 VI-3 DSI/CSB 7
NRC TO CECO 08/19/82 VII-1 A.
DL/SEPB 7
NRC to Ceco 08/05/81 VI-4 DSI/CSB 7(SYS)
HRC TO CECO 09/24/82 DL/SEPB 7(ELEC) NRC TO CECO 06/23/82 VII-1 B.
DL/SEPB 7
HRC to Ceco 10/18/78 VI-5 X
HRC to Ceco 05/07/81 VII-2 DL/SEPB 7
CECO to HRC 11/03/81 VI-6 DSI/CSB 7
HRC TO CECO 06/25/82 VII-3 DL/SEPB 7(Sys)
HRC to Ceco 04/24/81 DL/SEPB 7(Elec) HRC to CECO 07/07/81 VI-7 A.
1 X
NRC to Ceco 11/16/79 VII-4 X
HRC to Ceco 05/07/81 VI-7 A. 2.
X NRC to Ceco 11/16/79 VII-5 X
NRC to Ceco 05/07/81 VI-7 A. 3.
DL/SEPB 7
Ceco to NRC 11/03/81 VII-6 DL/SEPB 7
NRC to CECO 08/26/81 VI-7 A. 4.
DSI/RSB 7
NRC to Ceco 04/23/82 VII-7 X
HRC to CECO 11/16/79 VI-7 B.
X NRC to CECO 11/16/79 VIII-1 A.
DSI/PSB 7
NRC TO CECO J6/15/82 VI-7 C.
DL/SEPB 7
HRC to Ceco 03/13/81 VIII-2 DL/SEPB 7
HRC to CECO 06/26/81 VI-7 C.
1 DSI/PSB 7
NRC TO CECO 02/05/82 VIII-3 A.
DL/SEPB 7
NRC to CECO 07/07/81 VI-7 C. 2.
DL/SEPB 7
NRC to Ceco 03/13/81 VIII-3 B.
DL/SEPB 7
NRC to Ceco 06/26/81 VI-7 C. 3.
X HRC to CECO 11/16/79 VIII-4 DL/SEPB 7
HRC to Ceco 11/30/81 (2-9)
DRESDEN 2 TOPIC NO.
REVIEW STATUS REMARKS TOPIC NO.
REVIEW STATL'S REMARKS DIV/BR DIV/BR IX-1 DSI/ASB 7
NRC TO CECO 05/05/82 XV-10 X
NRC to Ceco 18/16/79 IX-2 X
NRC to Ceco 05/07/81 XV-11 DSI/CPB 7
NRC to CECO 02/08/82 IX-3 DL/SEPB 7
CECO to NRC 11/03/81 XV-12 X
NRC to CECO 11/16/79 IX-4 X
NRC to Ceco 11/16/79 XV-13 DSI/CPB 7(Sys)
HRC to CECO 02/08/82 DSI/AEB 7(Doses) HRC to CECO 12/28/81 IX-5 DL/SEPB 7
HRC TO CECO 09/02/82 XV-14 DSI/RSB 7
NRC to Ceco 12/15/81 IX-6 DE/CEB 7
NRC TO CECO 06/23/82 XV-15 DSI/RSB 7
NRC to CECO 01/04/82 X
X NRC to CECO 11/16/79 XV-16 DSI/AEB 7
Ceco to NRC 10/20/81 XI-1 X
NRC to Ceco 12/04/81 XV-17 X
NRC to Ceco 11/16/79 XI-2 X
NRC to CECO 12/04/81 XV-18 DSI/AEB 7
HRC TO CECO 09/02/82 l XIII-1 X
HRC to Ceco 05/07/81 XIII-2 DL/SSPB 7
NRC to Ceco 04/14/82 XV-19 DSI/RSB 7(Sys)
HRC to Ceco 12/07/81 DSI/AEB 7(DOSES) CECO to NRC 01/05/82 XV-1 DSI/RSB 7
NRC to CECO 12/29/81 XV-20 DSI/AEB 7
NRC to CECO 11/20/81 XV-2 X
NRC to Ceco 11/16/79 XV-21 X
HRC to CECO 05/07/81 XV-3 DSI/RSB 7
NRC to CECO 12/07/81 XV-22 X
NRC to Ceco 05/07/81 XV-4 DSI/RSB 7
NRC to Ceco 12/07/81 XV-23 X
NRC to Ceco 11/16/79 XV-5 DSI/RSB 7
NRC to Ceco 12/15/81 XV-24 X
HRC to Ceco 05/07/81 XV-6 X
NRC to CECO 11/16/79 XVI X
NRC to Ceco 11/05/80 XV-7 DSI/RSB 7
NRC to Ceco 01/04/82 XVII DL 7
NRC to Ceco 11/20/79 XV-8 RSI/CPB 7
HRC to CECO 02/J8/82 XV-9 DSI/RSB 7
NRC to Ceco 12/15/81 (2-10)
GINNA FACILITY: GINNA TOPIC HO.
REVIEW STATUS REMARKS DIV/BR LICENSEE: ROCHESTER GAS & ELECTRIC II-1 A.
DE/SAB 7
HRC to RGE 07/17/81-REGION /LOCATIDH: 15 MILES HORTH EAST OF ROCHESTER, NY.
II-1 B.
DE/SAB 7
HRC t 07/21/81 DOCKET H0.8 05000244 II-1 C.
DE/SAB 7
HC GE 09/29/81 POWER CAPACITY: 1520(THERMAL) 0490(ELECTRICAL)
II-2 A.
DSI/AE R
RE 11/03/81 OL HUMBER: DPR-18 II-2 B.
X HRC to RGE 05/07/81 H.S.S.S.: WEST.
I-D I/
7 HRC to RGE 09/24/81-A/E FIRM: GIL.
'-2 D.
X HRC to RGE 05/07/81 g
SYSTEMATIC EVALUATION PROGRAM BRANCH CHIEF: W. RU h
A.
DE/HGEB 7
HRC TO RGE 05/27/82 OPERATING REACTORS BRANCH CHIEF: D. CRUT L
l II-3 B.
HGEB 7
HRC TO RGE 05/27/82 OPERATING REACTORS PROJECT MANAGER: G. D K I
1
/ GEB 7
HRC TO RGE 05/27/82 INTEGRATED ASSESSMEN PSE AC D PERSINKO II DE/HGEB 7
HRC TO RGE 05/27/82 forb'S6 4Cb T lq
([
[B
/ ""* ** **"
II-4 7
HRC to RGE 06/08/81
]J
/GSB 7
HRC to RGE 07/09/81 FROM REVI NCH DE/GSB 7
HRC to RGE 06/08/81 X-TED 4b-SAR RECEIVED FROM 0 - TOPIC NOT LICENSEE II-4 D.
DE/AGEB 7
HRC to RGE 02/19/82 STARTED 5 - DRA II-4 E.
X HRC to RGE 11/16/79 1 - QUESTIONS RECEIVED TD II-4 F.
DE/HGEB 7
HRC to RGE
'02/19/82 FROM REVIEW BRANCH 6-!
E RECEIVED 2 - QUESTIONS SENT B
C III-1 DL/SEPB 7(Sys)
HRC to RGE 12/17/81 TO UTILITY DL/SEPB 7(Elec) HRC to RGE 04/02/81 7 - TOPIC COMPLETE 3 - QUESTION RESPONSE III-2 DL/SEPB 7
HRC TO RGE 04/21/82 RECEIVED BY HRC M - DATA FOR HEXT MONTH
( NOV EMBER) e (2-11)
i GlHA TOPIC NO.
REVIEW STATUS REMARKS TOPIC N0.
REVIEW STATUS REMARKS i
DIV/BR DIV/BR I
III-3 A.
DE/SEB_
7 NRC TO RGE 03/03/82 III-80 5.
DL/SFPB 7
NRC to RGE 06/22/88 I
III-3 B.
X NRC to RGE 12/31/80 III-10 C.
X NRC to RGE 11/16/79 III-3 C.
DE/MGER 7
NRC TO RGE 05/27/82 III-11 X
NRC to RGE 05/07/88 III-4 A.
DSI/AES 7
NRC TO RCE 04/16/82 III-12 X-MRC to RGE 05/07/81 III-4 5.
DE/NTER 7
NRC to RGE 02/19/82 IV-1 A.
DL/SEPB 7
NRC to RGE 05/29/79 III-4 C.
DSI/ASB 7
NRC to RGE 02/17/22 IV-2 DSI/ICSB 7
NRC to RGE 05/26/88 III-4 D.
DE/SAB 7
NRC to RGE 07/21/81 IV-3 X
NRC to RGE 05/07/81 III-5 A.
DL/SEPB 7
NRC to RGE 02/22/82 V-t X
NRC to RGE 11/27/81 III-5 B.
DL/SEPB 7
NRC to RGE 09/04/81 V-2 X
NRC to RGE 11/16/79 III-6 DL/SEPB 7
KRC to RGE 02/17/82 V-3 X
NRC to R6E 05/07/31 III-7 A.
DL/SEPR 7
MRC TO RGE 04/16/82 V-4 X
NRC to RGE 05/07/81 III-7 B.
DL/SEPB 7
NRC TO RGE 04/21/82 V-5 DL/SEPB 7
NRC ts RGE 02/04/82 III-7 C.
DE/SEB 7
RGE to NRC 07/07/88 V-6 DL/SEPB 7
NRC to RGE 05/05/80 III-7 D.
DE/SEB 7
NRC to RGE 05/08/80 V-7 DSI/ASB 7
NRC to RGE 02/17/82 III-8 A.
DSI 7
MRC to RGE 02/17/82 V-8 X
NRC to RGE 05/07/41 j
III-5 B.
X NRC to RGE 02 12 51 V-9 X
NRC to RGE 11/16/79 III-8 C.
DL/SEPB 7
RGE to NRC 12/07/79 V-10 A.
DL/SEPB 7
NRC to RGE 02/02/79 III-5 D.
X NRC to RGE 05/07/41 V-te B.
DL/SEPB 7
RGE to NRC 09/29/81 III-9 X
NRC to RGE 05/07/81 V-11 A.
DL/SEPB 7
NRC to RGE 11/07/81 4
i III-10 A.
DL/SEPR 7
MRC to RGE 08/03/41 V-11 B.
DL/SEPR 7(S s)
RGE to NRC 09/29/41 DL/SEPS 7(E oc) NRC to RGE 04/24/81 i
(2-12)
. ~.
I i
GINNA i
I TOPIC N0.
REVIEW STATUS REMARKS TOPIC NO.
REVIEW STATUS REMARKS DIV/BR DIV/BR V-12 A.
X NRC to RGE lifa6/79 VI-7 D.
DL/SEPB 7
NRC to RGE 08/17/78 V-13 X
HRC to RGE 25/07/81 VI-7 E.
X HRC to RGE 05/07/81 VI-1 DE/CEB 7
NRC to RGE 02/19/82 VI-7 F.
DL/SEPB 7
HRC to RGE 06/24/81 VI-2 A.
X NRC to RGE 05/07/81 VI-8 X
NRC to RGE 05/07/81 4
VI-2 B.
X HRC to RGE 05/07/31 VI-9 X
NRC to RGE 11/16/79 VI-2 C.
X NRC to RGE' 11/16/79 VI-10 A.
DL/SEPB 7
NRC to RGE 11/27/81 VI-2 D.
DSI/CSB 7
HRC TO RGE 04/12/82 VI-10 B.
X NRC to RGE 11/16/79 VI-3 DSI/CSB 7
HRC TO RGE 04/12/82 VII-1 A.
DL/SEPB 7
NRC to RGE 07/30/81 VI-4 DSI/CSB 7(SYS)
HRC TO RGE 04/12/82 VII-1 B.
DL/SEPB 7
NRC.to RGE 08/17/78 DL/SEPB 7(ELEC) HRC TO RGE 03/19/82 VII-2 DL/SEPB 7
NRC to RGE 12/28/81 71-5 X
HRC to RGE 05/07/81 VII-3 DL/SEPB 7(Sys)
HRC to RGE 09/29/81 VI-6 DSI/CSB 7
NRC to RGE 05/06/81 DL/SEPB 7(Elec) HRC to RGE 03/25/82 VI-7 A.
1.
DL/SEPB 7
NRC to RGE 02/20/81 VII-4 X
HRC to RGE 05/07/81 VI-7 A. 2.
DL/SEPR 7
HRC to RGE 08/17/78 VII-5 X
HRC to RGE 05/07/81 VI-7 A. 3.
DL/SEPB 7
HRC to RGE 11/27/81 VII-6 DL/SEPB 7
HRC to RGE 06/24/81 l
VI-7 A. 4.
X
- MRC to RGE 05/07/81 VII-7 X
HRC to RGE 11/16/79
]
VI-7 B.
DSI/R$B 7(SYS)
HRC TO RGE 03/09/82 VIII-1 A.
DSI/PSB 7
NRC to RGE 03/26/81 i
t DL/SEB 7(Elec) HRC to RGE 09/18/81 i
VIII-2 DL/SEPB 7
NRC to RGE 06/24/81 VI-7 C.
DL/SEPB 7
NRC to RGE 02/20/81 VIII-3 A.
DL/SEPB 7
NRC to RGE 07/31/81 VI-7 C.
1 DL/SEPB 7
HRC to RGE 11/27/81 VIII-3 B.
DL/SEPB 7
NRC to RGE 06/03/81 VI-7 C. 2.
DL/SEPB 7
NRC to RGE 02/20/81 VIII-4 DL/SEPB 7
RGE to MRC 10/08/81 VI-7 C. 3.
X HRC to RGE 11/16/79 i
-i i
(2-13)
IGill4lltlk TCPIC NO.
REVIEW STATUS REMARKS TOPIC HO.
REVIEW STATUS REMARKS DIV/BR DIV/BR IX-1 DSI/ASB 7
NRC to RGE
'11/24/81 XV-10 DSI/RSB 7
NRC to RGE 09/04/81 IX-2 X
NRC to RGE 05/07/81 XV-11 X
NRC to RGE 10/01/80 IX-3 DL/SEPS 7
NRC to RGE 11/03/81 XV-12 DSI/CPB 7(Sys)
NRC to RGE 0 9/ 04/8 f-DSI/AEB 7(DOSES) HRC TO RGE 03/03/82 IX-4 DSI/R$8 7
NRC to RGE 08/26/81-XV-13 X
NRC to RGE 11/16/19 IX-5 DL/SEPB 7
RGE to NRC 03/29/82 XV-14 DSI/RSB 7
NRC to RGE 09/05/81 IX-6 7
NRC TO RGE 05/07/82 XV-15 DSI/RSB 7
NRC to RGE 09/f,4/81 X
X NRC to RGE 05/07/81 XV-16 DSI/AEB 7
NRC TO RGE 03e03/82 XI-1 X
HRC to RGE 12/04/81 XV-17 DSI/RFB 7(Sys)
HRC to RGE 07/04/81 XI-2 X
HRC to RGE 12/04/81 DSI/AEB 7(DOSES) HRC TO RGE F3/03/82 XIII-1 X
HRC to RGE 05/07/81 XV-18 X
NRC to RGE 03/11/80 XIII-2 DL/SEPB 7
HRC to RGE 03/26/81 XV-19 DSI/RSB 7(Sys)
NRC to RGE 10/02/81 DSI/AEB 7(DOSES) RGE TO NRC 03/09/82 XV-1 DSI/R$8 7
NRC to RGE 09/04/81 XV-20 DSI/AEB 7
NRC TO RGE 03/03/82 XV-2 DSI/RSB 7(Sys)
HRC to RGE 09/04/81 DSI/AEB 7(DOSES) NRC TO RGE 03/03/82 XV-21 X
HRC to RGE 05/07/81 XV-3 DSI/R$8 7
NRC to RGE 09/04/81 XV-22 X
NRC to RGE 05/07/81 XV-4 DSI/R$B 7
NRC to RGE 09/04/81 XV-23 X
NRC to RG'i 05/07/81 XV-5 DSI/RSB 7
NRC to RGE 09/04/81 XV-24 X
HRC to RGE 05/07/81 XV-6 DSI/RSB 7
HRC to RGE 09/04/81 XVI X
HRC to RGE 11/05/80 XV-7 DSI/RSB 7
NRC to RGE 09/04/81 XVII DL 7
NRC to RGE 08/17/78 XV-8 DSI/CPB 7
NRC to RGE 09/04/81 XV-9 DSI/RSB 7
RGE to tiRC 10/16/81 t
(2-14)
HADDAM NECK FACILITY: HADDAM NECK TOPIC HO.
REVIEW STATUS REMARKS DIV/BR LICENSEE CONNECTICUT YANKEE ATOMIC POWER II-1 A.
DE/SAB 7
HRC TO CYA 04/22/82 REGIDH/LOCATIDH 13 MILES EAST OF MERIDEN, CT.
I1-1 B.
DE/SAB 7
HR TO 04/22/82 DOCKET NO: 05000213 II-1 C.
DE/SAB 7
C 0 AP 06/28/22 POWER CAPACITY: 1825(THERMAL) 0575(ELECTRICAL)
II-2 A.
DSI/AE CY to NRC 01/22/81 OL NUMBER: DPR-61 II-2 B.
X NRC to CYAPCo 05/07/81 s
H.S.S.S.: WEST.
C.
/ B 7
HRC TO CYAPCO 04/26/82 A/E FIRMS S&W X
HRC to CYAPCo 05/07/81 SYSTEMATIC EVALUATION PROGRAM BRANCH CHIEF: W. RU A.
DE/HGEB 7
HRC TO CYAPCO 12/20/82
- ~
II-3 B.
D /HGEB 7
NRC TO CYAPCO 12/20/82 OPERATING REACTORS BRANCH CHIEF: D. CRU l
OPERATING REACTORS PROJECT MAN R
. R CKS I
B.
1.
E/ EB 7
HRC TO CYAPCO 12/20/82 HR 12/20/82 j"CTOCYAPCO INTEGRATED ASSESSMENT P M C AGI OWN g
II-DE/HGEB 7
..s
(
A 4 (1'E b 's b u1 C AES (d
II-E 7
HRC to CYAPCo 06/17/81
~
}
G - ENER 4a-DRAFT SE R ED DE/GSB 7
HRC TO CYAPCO 06/04/82 L.
FROM REVIE NCH 4 C.
DE/GSB 7
NRC to CYAPCo 06/17/81 X-
' LTTED d
(b-SAR RECEIVED FROM 0 - TOPIC NOT LICENSEE II-4 D.
DE/HGEB 7
HRC TO CYAPCO 07/13/82 STARTED 5-D M,
II-4 E.
X NRC to CYAPCo 04/16/79 1 - QUESTIONS RECEIVED Tf V
II-4 F.
DE/HGEB 7
HRC TO CYAPCO 07/06/82 FROM REVIEW BRANCH 6 - SI R
NSE RECEIVED 2 - QUESTIONS SENT BY RC III-1 DL/SEPB 7(SYS)
HRC TO CYAPCO 08/12/82 DL/SEPB 7(Elec) Part of VII-5 TO UTILITY 7 - TOPIC COMPLETE III-2 DL/SEPB 7
NRC TO CYAPCO 09/02/82 3 - OUESTION RESPONSE RECEIVED bY HRC (2-15)
HADDAM NECK TOPIC NO.
REVIEW STATUS REMARKS TOPIC NO.
REVIEW STATUS REMARKS DIV/BR DIV/BR III-3 A.
DE/SEB 7
HRC TO CYAPCO 08/26/82 111-10 8.
DL/SEPB 7
CYAPCO TO NRC 05/25/82 III-3 8.
DE/MGEB 7
NRC TO CYAPCu 12/20/82 III-10 C.
X NRC to CYAPCo 04/16/79 III-3 C.
DE/MGES 7
HRC TO CYAPCO 06/28/82 III-11 X
NRC to CYAPCo 05/07/81 III-4 A.
DSI/ASB 7
NRC TO CYAPCO 08/02/82 III-12 X
NRC to CYAPCo 05/07/81 III-4 B.
DE/MTEB 7
NRC TO CYAPCO 07/13/82 IV-1 A.
DL/SEPB 7
CYAPCo to NRC 06/25/79 III-4 C.
DSI/ASB 7
HRC TO CYAPC0 05/10/82 IV-2 DSI/ICSB 7
HRC to CYAPCo 02/22/82 III-4 D.
DE/SAB 7
NRC TO CYAPCO 04/22/82 IV-3 X
NRC to CYAPCo 05/07/81 III-5 A.
DL/SEPB 7
HRC TO CYAPCO 10/12/82 V-1 X
NRC to CYAPCo 11/27/81 III-5 B.
DL/SEPS 7
HRC TO CYAPCD 05/10/82 V-2 X
HRC to CYAPCo 04/16/79 III-6 DL/SEPB 7
NRC TO CYAPCO 02/25/82 V-3 X
HRC to CYAPCo 05/07/81 III-7 A.
X HRC TO CYAPCO 05/07/81 V-4 X
NRC to CYAPCo 05/07/81 III-7 B.
DL/SEPS 7
HRC TO CYAPCO 02/23/83 V-5 DL/SEPB 7
HRC to CYAPCo 02/22/82 III-7 C.
X NRC to CYAPCo 04/16'/79 V-6 DL/SEPB 7
NRC to CYAPCo 03/05/80 III-7 D.
DE/SEB 7
NRC to CYAPCo 10/16/81 V-7 DSI/ASB 7
HRC TO CYAPCO 06/21/82 III-8 A.
DSI 7
NRC TO CYAPCO 06/21/82 V-8 X
NRC to CYAPCo 05/07/81 III-8 B.
X NRC to CYAPCo 10/01/80 V-9 X
NRC to CYAPCo 11/16/79 III-8 C.
DL/SEPS 7
NRC to CYAPCo 01/29/82 V-10 A.
DL/SEPB 7
NRC to CYAPCo 01/13/81 l
III-6 D.
X NRC to CYAPCo 05/07/81 V-10 8.
DL/SEPB 7
HRC to CYAPCo 12/28/81 III-9 X
NRC to CYAPCo 05/07/81 V-11 A.
DL/SEPB 7
'NRC to CYAPCo 11/03/81 III-19 A.
DL/SEPB 7
CYAPCo to NRC 09/21/81 V-11 B.
DL/SEPB 7(Sys)
HRC to CYAPCo 12/28/81 DL/SEPB 7(Elec) HRC TO CYAPCO 03/03/82 (2-16)
HADDAM NECK TOPIC N0.
REVIEW STATUS REMARKS TOPIC N0.
REVIEW STATUS R EMARKS DIV/BR DIV/BR V-12 A.
X HRC to CYAPCo 11/16/79 VI-7 D.
DL/SEPS 7
HRC to CYAPCo 08/17/78 V-13 X
HRC to CYAPCo 05/07/81 VI-7 E.
X HRC to CYAPCo 05/07/81 VI-1 DE/CEB 7
HRC TO CYAPC0 07/15/82 VI-7 F.
X HRC to CYAPCo 04/16/79 VI-2 A.
X NRC to CYAPCo 05/07/81 VI-8 X
HRC.to CYAPCo 05/07/81 VI-2 B.
X HRC to CYAPCo 05/07/81 VI-9 X
HRC to CYAPCo 11/16/79 VI-2 C.
X HRC to CYAPCo 04/16/79 VI-10 A.
DL/SEPB 7
HRC TO CYAPCO 12/03/82 VI-2 D.
DSI/CSB 7
HRC TO CYAPC0 09/16/82 VI-10 B.
X HRC to CYAPCo 04/16/79 VI-3 DSI/CSB 7
HRC TO CYAPCO 09/16/82 VII-l A.
DL/SEPB 7
HRC TO CYAPCO 10/20/82 VI-4 DSI/CSB 7(SYS)
HRC TO CYAPCO 12/18/82 VII-1 B.
DL/SEPE 7
HRC to CYAPCo 08/17/78 DL/SEPR 7(Elec) HRC to CYAPCo 09/21/81 VII-2 DL/SEPB 7
HRC TO CYAPCO 63/05/82 VI-5 X
HRC to CYAPCo 05/07/81 VII-3 DL/SEPB 7(Sys)
HRC to CYAPCo 12/28/81 VI-6 DSI/CSB 7
HRC TO CYAPCO 05/07/82 DL/SEPB 7(Elec) HRC to CYAPCo 08/28/81 VI-7 A.
1.
DL/SEPS 7
HRC to CYAPCo 02/20/81 VII-4 X
HRC to CYAPCo 05/07/81 VI-7 A. 2.
X HRC to CYAPCo 05/07/81 VII-5 X
HRC te CYAPCo 05/07/81 VI-7 A. 3.
DL/SEPB 7
HRC TO CYAPC0 10/27/82 VII-6 DL/SEPB 7
HRC to CYAPCo 08/28/81 VI-7 A. 4.
X HRC to CYAPCo 05/07/81 VII-7 X
HRC to CYAPCo 04/16/79 VI-7 B.
DSI/R$8 7($YS)
HRC TO CYAPCO 08/12/82 VIII-1 A.
DSI/PSB 7
HRC TO CYAPCO 07/22/82 DL/SEPS 7(Elec) HRC to CYAPCo 05/21/81 VIII-2 DL/SEPB 7
HRC to CYAPCo 08/28/81 VI-7 C.
DL/SEPB 7
HRC to CYAPCo 03/13/81 VIII-3 A.
DL/SEPB 7
CYAPCo to NRC 08/16/79 VI-7 C.
1.
DL/SEPB 7
CYPACO to HRC 01/11/82 VIII-3 B.
DL/SEPB 7
HRC to CYAPCo 08/28/81 VI-7 e 2.
DL/SEPB 7
HRC to CYAPCo 03/13/81 VIII-4 DL/SEPB 7
HRC TO CYAPCD 05/t7/82 VI-7 C. 3.
DL/SEPB 7
CYAPCo to NRC 02/12/82 (2-17)
HADDAM NECK TOPIC NO.
REVIEW STATUS REMARKS TOPIC NO.
REVIEW STATUS REMARKS DIV/BR DIV/BR IX-1 DSI/ASB 7
NRC TO CYAPCO 03/01/82 XV-10 DSI/RSB 7
NRC TO CYAPCO 04/82/82 IX-2 X
NRC to CYAPCo 05/07/81 XV-fl X
NRC to CYAPCo 10/01/80 IX-3 DL/SEPB 7
NRC TO CYAPCO 06/07/82 XV-12 DSI/CPB 7(SYS)
HRC TO CYAPCO 03/23/82 DSI/RSB 7(DOSES) HRC TO CYAPCO 06/29/82 IX-4 DSI/RSB 7
NRC TO CYAPCO 04/26/82 XV-13 X
HRC to CYAPCo 11/16/79 IX-5 DL/SEPB 7
HRC TO CYAPCO 08/27/82 XV-14 DSI/RSB 7
NRC TO CYAPCO 04/26/82 IX-o DE 7
NRC TO CYAPCO 06/22/82 XV-15 DSI/RSB 7
NRC TO CYAPCO 04/16/82 X
X HRC to CYAPCo 05/07/81 XV-16 DSI/AEB 7
CYAPCo to NRC 09/28/81 XI-1 X
HRC to CYAPCo 12/04/81 XV-17 DSI/RSB 7(SYS)
NRC TO CYAPCO 08/19/82 XI-2 X
NRC to CYAPCo 12/04/81 DSI/AEB 7(DOSES) NRC TO CYAPCO 08/19/82 XIII-t X
HRC to CYAPCo 05/07/81 XV-18 X
NRC to CYAPCo 10/01/80 XIII-2 DL/SSPB 7
HRC TO CYAPCO 06/10/82 XV-19 DSI/RSB 7(Sys)
NRC to CYAPCo 12/02/81 DSI/AEB 7(DOSES) NRC TO CYAPCO 08/27/82 XV-1 DSI/RSB 7
HRC TO CYAPCO 06/18/82 XV-20 DL/SEPB 7
NRC to CYAPCo 06/09/81 XV-2 DSI/RSB 7 (SYS) NRC TO CYAPCO 11/05/82 DSI/AEB 7(DOSES) HRC TO CYAPCO 11/09/32 XV-21 X
NRC to CYAPCo 05/07/81 XV-3 DSI/RSB 7
HRC TO CYAPCO 03/17/82 XV-22 X
NRC to CYAPCo 05/07/81 XV-4 DSI/RSB 7
HRC to CYAPCo 12/17/81 XV-23 X
NRC to CYAPCo 05/07/81 XV-5 DSI/RSB 7
NRC TO CYAPC0 04/16/82 XV-24 X
HRC to CYAPCo 05/07/81 XV-6 DSI/RSB 7
HRC TO CYAPCO 05/20/82 XVI X
HRC to CYAPCo 11/05/8G XV-7 DSI/RSB 7
HRC TO CYAPCO 05/25/82 XVII DL 7
NRC to CYAPCo 08/17/78 XV-8 DSI/CPB 7
NRC TO CYAPCO 03/25/82 XV-9 DSI/RSB 7
HRC TO CYAPCO 04/26/82 (2-18)
LACROSSE TOPIC NO.
REVIEW STATUS REMARKS FACILITY: LACROSSE DIV/BR LICEN$EE: DAIRYLAND POWER 11-1 A.
DE/SAB 7
NRC TO DPC 01/31/83 REGION / LOCATION: 19 MILES SOUTH OF LACROSSE. WISC.
II-1 B.
DE/SAB 7
NC P
09/13/82 DOCKET NO.
05000409 II-1 C.
DE/SAB 7
R DPC 08/30/82 POWER CAPACITY: 0165(THERMAL) 0050(ELECTRICAL)
II-2 A.
DSI/
o DPC 12/15/80 OL NUMBER: DPR-45 II-2 B.
NRC to CPC 05/07/81 H.S.S.S.: AC.
I SI A 7
NRC TO DPC 10/15/82 A/E FIRM: S&L i
-2 D.
X NRC to DPC 05/07/81 SYSTEMATIC EVALUATION PROGRAM BRANCH CHIEF: W. R LL A.
DE/NGEB 7
NRC TO DPC 11/12/82 II-3 B.
/NGEB 7
- iRC TO DPC 11/12/82 OPERATING REACTORS BRANCH CHIEF: D. CRU
)
OPERATING REACTORS PROJECT MANAGER D
UDL
-3 HGEB 7
NRC TO DPC 11/12/82 INTEGRATED ASSESSMENT J
ANA M CHAELS
/
I DE/HGEB NRC TO DPC 11/12/82 l
V"'
-4 7
NRC to DPC 07/20/82 j
d II A.
7 NRC to DPC 06/08/81 V
G C
(a-DRAFT SE C
4 4 DE/GSB 7
HRC TO DPC 07/2G/82 FROM REVI ANCH C.
DE/GSB 7
NRC to DPC 06/08/81 X
ETED 4b-SAR RECEIVED FROM W
0 - TOPIC NOT LICENSEE II-4 D.
DE/HGEB 7
NRC TO DPC 08/27/82 STARTED 5 - DRA SE SE II-4 E.
DE/HGEB 7
NRC TO DPC 08/16/82 1 - QUESTIONS RECEIVED TO L
II-4 F.
DE/HGEB 7
NRC TO DPC 07/29/82 FROM REVIEW BRANCH
_ {
III-1 DL/SEPB 7(Sys)
DPC TO HRC 07/02/82 2 - QUESTIONS SENT DL/SEPB 7(Elec) HRC TO DPC 01/04/83 TO UTILITY 7 - TOPIC COMPLETE 3 - QUESTION RESPONSE III-2 DL/SEPB 7
HRC TO DPC 01/27/83 RECEIVED BY NRC (2-19) l
LACROSSE TOPIC NO.
REVIEW STATUS REMARKS TOPIC HO.
REVIEW STATUS REMARKS DIV/BR DIV/BR III-3 A.
DE/SEB 7
HRC TO DPC 12/13/82 III-10 B.
X NRC to DPC 10/29/79 III-3 B.
X NRC to DPC 03/10/81 III-10 C.
X NRC to DPC
.10/29/79 III-3 C.
DE/MGER 7
NRC TO DPC 10/15/82 III-11 X
NRC to DPC 05/07/81 III-4 A.
DSI/ASB 7
HRC TO DPC 11/29/82 III-12 X
NRC to DPC 05/07/81 III-4 B.
DE/MTER 7
NRC TO DPC 01/27/83 IV-1 A.
DL/SEPB 7
HRC to DPC 04/19/79 III-4 C.
DSI/ASB 7
NRC TO DPC 07/19/82 IV-2 DSI/ICSB 7
HRC TO DPC 09/10/82 III-4 D.
DE/SAB 7
HRC TO DPC 08/23/82 IV-3 X
HRC to DPC 05/07/81 III-5 A.
DL/SEPR 7
HRC TO DPC 11/08/82 V-1 X
NRC to DPC 11/27/81 III-5 B.
DL/SEPB 7
HRC TO DPC 08/12/82 V-2 X
HRC to DPC 10/29/79 III-6 DL/SEPR 7
NRC TO DPC 04/05/83 V-3 X
HRC to DPC 05/07/81 III-7 A.
X HRC to DPC 05/07/81 V-4 X
HRC to DPC 05/07/81 III-7 B.
DL/SEPB 7
DPC To NRC 01/20/83 V-5 DL/SEPB 7
NRC TO DPC Oi/19/82 l
III-7 C.
X HRC to DPC 10/29/79 V-6 DL/SEPB 7
NRC to DPC 03/05/80 III-7 D.
DE/SEB 7
NRC TO DPC 04/13/82 V-7 X
NRC to DPC 05/07/81 III-8 A.
DSI 7
HRC TO DPC 02/22/82 V-8 X
HRC to DPC 05/07/81 III-8 B.
X NRC to DPC 09/26/80 V-9 X
HRC to DPC 10/29/79 III-8 C.
DL/SEPB 7
DPC to NRC 03/03/81 V-10 A.
DL/SEPB 7
HRC to DPC 01/07/80 III-8 D.
X HRC to DPC 05/07/81 V-10 B.
DL/SEPB 7
NRC TO DPC 10/07/82 III-9 X
HRC to DPC 05/07/81 V-11 A.
DL/SEPB 7
NRC to DPC 02/22/82 III-10 A.
DL/SEPB 7
HRC to DPC 09/22/81 V-11 B.
DL/SEPB 7(SYS)
HRC TO DPC 10/07/82 DL/SEPB 7(ELEC) NRC TO DPC 03/04/82 l
l l
(2-20)
1.ACROSSE TOPIC HO.
REVIEW STATUS REMARKS TOPIC HO.
REVIEW STATUS REMARKS DIV/BR DIV/BR V-12 A.
DL/SEPB 7
NRC to DPC 04/30/79 VI-7 D.
DL/SEPB 7
HRC to DPC 08/17/78 V-13 X
HRC te DPC 05/07/81 VI-7 E.
X HRC to DPC 05/07/81 VI-1 DE/CEB 7
HRC TO DPC 10/14/82 VI-7 F.
X HRC to DPC 10/29/79 VI-2 A.
X HRC to DPC 05/07/81 VI-8 X
HRC to DPC 05/07/81 VI-2 B.
HRC to DPC 10/29/79 VI-2 C.
X HRC to DPC 10/29/79 VI-10 A.
DL/SEPB 7
HRC TO DPC 09/20/82 VI-2 D.
DSI/CSB 7
HRC TO DPC 08/27/82 VI-10 B.
X HRC to DPC 10/29/79 VI-3 DSI/CSB 7
NRC TO DPC 08/27/82 VII-1 A.
DL/SEPB 7
HRC TO DPC 03/09/82 VI-4 DSI/CSB 7(SYS)
HRC TO DPC 12/09/82 VII-1 B.
DL/SEPB 7
HRC to DPC 08/17/78 DL/SEPB 7(Elec) HRC to DPC 01/05/82 VII-2 DL/SEPB 7
HRC TO DPC 03/11/82 VI-5 X
HRC to DPC 05/07/81 VII-3 DL/SEPB 7(SYS)
HRC TO DPC 10/07/82 VI-6 DSI/CSB 7
HRC TO DPC 08/24/82 DL/SEPB 7(ELEC) HRC TO DPC 01/04/83 VI-7 A.
1.
X HRC to DPC 10/29/79 VII-4 X
HRC to DPC 05/07/81 VI-7 A. 2.
X HRC to DPC 05/07/81 VII-5 X
HRC to DPC 05/07/81 VI-7 A. 3.
DL/SEPB 7
NRC to DPC 01/05/83 VII-6 DL/SEPB 7
NRC to DPC 09/21/81 VI-7 A. 4.
X HRC to DPC 05/07/81 VII-7 X
HRC to DPC 10/29/79 VI-7 B.
X HRC to DPC 10/29/79 VIII-1 A.
DSI/PSB 7
HRC TO DPC 10/14/82 VI-7 C.
DL/SEPB 7
HRC to DPC 03/13/81 VIII-2 DL/SEPB 7
HRC to DPC 12/18/81 VI-7 C.
1.
DL/SEPB 7
HRC to DPC 09/21/81 VIII-3 A.
DL/SEPB 7
HRC to DPC 06/05/79 VI-7 C. 2.
DL/SEPB 7
HRC to DPC 03/13/81 VIII-3 B.
DL/SEPB 7
HRC to DPC 08/28/81 VI-7 C. 3.
X HRC to DPC 10/29/79 VIII-4 DL/SEPB 7
HRC to DPC 09/09/81 (2-21)
LACROSSE TOPIC NO.
REVIEW STATUS REMARKS TOPIC NO.
REVIEW STATUS REMARKS DIV/BR DIV/BR IX-1 DSI/ASB 7
NRC TO DPC 10/26/82 XV-10 X
NRC to DPC 10/29/79 IX-2 X
NRC to DPC 05/07/81 XV-11 DSI/CPB 7
NRC TO DPC 04/05/82 IX-3 DL/SEPB 7
NRC TO DPC 07/20/82 XV-12 X
NRC to DPC 10/29/79 IX-4 X
NRC to DPC 10/29/79 XV-13 DSI/CPB 7(DOSES) HRC TO DPC 07/20/82 DSI/AEB 7($YS)
HRC TO DPC 04/05/82 IX-5 DL/SEPB 7
NRC TO DPC 10/28/82 XV-14 DSI/RSB 7
NRC TO DPC 08/06/82 IX-6 DSI/ASB 4A 10/14/82 XV-15 DSI/R$B 7
NRC to DPC 09/21/81 X
X NRC to DPC 05/07/81 XV-16 DSI/AEB 7
NRC TO DPC 10/14/82 XI-1 X
NRC to DPC 12/04/81 XV-17 X
NRC to DPC 10/29/79 XI-2 X
NRC to DPC 12/04/81 XV-18 DSI/AEB 7
NRC TO DPC 0A/06/82 XIII-1 X
NRC to DPC 05/07/81 XV-19 DSI/AEB 7(DOSES) HRC TO DPO 10/14/82 XIII-2 DL/SSPB 7
HRC to DPC 12/14/82 DSI/RSB 7(SYS)
NRC TO DPC 10/29/82 XV-1 DSI/RSB 7
- 4RC TO DPC 09/29/82 XV-2C DSI/AEB 7
HRC TO DPC 10/14/82 XV-2 X
NRC to DPC 10/29/79 XV-21 X
NRC to DPC 05/07/81 XV-3 DSI/RSB 7
NRC to DPC 11/13/81 XV-22 X
NRC to DPC 05/07/81 XV-4 DSI/RSB 7
HRC to DPC 11/03/81 XV-23 X
NRC to DPC 05/07/81 XV-5 DSI/RSB 7
HRC TO DPC 08/24/82 XV-24 X
NRC to DPC 05/07/81 XV-6 X
NRC to DPC 10/29/79 XVI X
NRC to DPC 11/05/80 XV-7 DSI/R$B 7
NRC TO DPC 08/96/82 XVII DL 7
NRC to DPC 08/17/78 XV-8 DSI/CPB 7
NRC TO DPC 09/10/82 XV-9 DSI/RSB 7
NRC TO DPC 10/12/82 (2-22)
MILLSTONE 1 FACILITY: MILLSTONE 1 TOPIC NO.
REVIEW STATUS REMARKS DIV/BR LICENSEE: NORTHEAST NUCLEAR ENERGY 11-1 A.
DE/SAB 7
NRC to NU 07/31/81 REGION / LOCATION: 5 MILES SOUTH WEST OF NEW LONDON, CONN.
II-1 B.
DE/SAB 7
NRC to 11/27/81 DOCKET H0.8 05000245 II-1 C.
DE/SAB 7
08/04/82 POWER CAPACITY: 2011(THERMAL) 0660(ELECTRICAL)
II-2 A.
DSI/AEB t N 03/30/81 OL NUMBER: DPR-21 II-2 B.
to NU 05/07/81 II-2 NRC to NU 12/23/e*
A/E FIRMS EBASCO X
NRC to NU 05/47/81 SYSTEMATIC EVALUATION PROGRAM BRANCH CHIEF: W. RUSSE DE/HGEB 7
HRC 10 NU 06/30/82 OPERATING REACTORS BRANCH CHIEF: D. CRUTCHF
, I II-3 B.
GEB 7
NRC TO NU 06/30/82 OPERATING REACTORS PROJECT MANAGER:
II-H EB 7
NRC TO NU 06/30/82 INTEGRATED ASSESSMENT PR C
GEtt S 'KO II-HGEB 7
NRC TO NU 06/30/82 V"
I DE/G.
NRC to NU 06/08/81 NRC to NU C1/08/81 g
A II-4 A.
E 1
B.
/D JSB 7
NRC TO NU 05/11/82 DE/GSB 7
NRC to NU 06/08/81 X-D 4b-SAR RECEIVED FROM y
0 - TOPIC NOT LICENSEE h
II-4 D.
DE/HGEB 7
NRC TO NU 06/30/82 STARTED 5 - DRAFT SE SENT II-4 E.
X NRC to NU 11/16/79 1 - QUESTIONS RECEIVED T0tU T
FROM REVIEW BRANCH i
II-4 F.
DE/HGEB 7
HRC TO NU 06/15/82 6 - SE E
ECEIVED 2 - QUESTIONS SENT BY R III-1 DL/SEPB 7(Elec) HRC TO NU 09/16/82 DL/SEPB 7(SYS)
HRC TO NU 09/01/82 TO UTILITY 7 - TOPIC COMPLETE 3 - QUESTION RESPONSE III-2 DL/SEPB 7
NRC TO NU 09/30/82 RECEIVED BY NRC (2-23) i
MILLSTONE 1 TOPIC HO.
REVIEW STATUS REMARKS TOPIC NO.
REVIEW STATUS REMARKS DIV/BR DIV/BR III-3 A.
DE/SEB 7
NRC TO NU 09/15/82 III-10 B.
X NRC to NU 11/16/79 III-3 B.
X HRC to NU 12/26/80 III-10 C.
DL/SEPB 7
HU to NRC 08/29/79 III-3 C.
DE/HGEB 7
NRC TO HU 06/23/82 III-11 X
NRC to NU 05/07/81 III-4 A.
DSI/ASB 7
NRC TO NU 05/25/82 III-12 X
NRC to NU 05/07/81 III-4 B.
DE/MTEB 7
NRC TO HU 06/29/82 IV-1 A.
DL/SEPB 7
HU to NRC 02/12/79 III-4 C.
DSI/ASB 7
HRC TO NU 06/09/82 IV-2 DSI/ICSB 7
NRC TO HU 06/03/82 III-4 D.
DE/SAB 7
NRC to NU 11/27/81 IV-3 DL 7
HRC to NU 02/22/82 III-5 A.
DL/SEPB 7
NRC TO NU 06/24/82 V-1 X
HRC to NU 31/27/81 III-5 B.
DL/SEPB 7
NRC TO HU 09/09/82 V-2 X
HRC to NU 11/16/79 III-6 DL/SEPB 7
NRC TO NU 06/30/82 V-3 X
NRC to HU 05/07/81 III-7 A.
X HRC to HU 05/07/81 V-4 X
NRC to NU 05/07/81 III-7 B.
DL/SEPB 7
NRC TO HU 08/11/82 V-5 DL/SEPB 7
HRC to NU 08/28/81 III-7 C.
X NRC to NU 11/16/79 V-6 DL/SEPB 7
HRC to NU 09/29/82 III-7 D.
DE/SEB 7
NU to NRC 02/17/81 V-7 X
NRC to NU 05/07/81 III-8 A.
DSI 7
NRC TO NU 03/03/82 V-8 X
NRC to NU 05/07/81 III-8 B.
X NRC to NU 09/26/80 V-9 X
HRC to NU 11/16/79 III-8 C.
DL/SEPB 7
HRC TO NU 06/24/82 V-10 A.
DL/SEPB 7
NU to NRC 03/05/79 III-8 D.
X HRC to NU 05/07/81 V-10 B.
DL/SEPB 7
HU to NRC 07/22/81 III-9 X
NRC to NU 05/07/81 V-11 A.
DL/SEPB 7
NRC to NU 07/08/81 III-10 A.
DL/SEPB 7
NRC to NU 04/07/82 V-11 B.
DL/SEPB 7(Sys)
HU to NRC 07/22/81 DL/SEPB 7(ELEC) HRC TO NU 09/16/82 (2-24)
l l
MILLSTONE 1 TOPIC HO.
REVIEW STATUS REMARKS TOPIC N0.
REVIEW STATUS REMARKS DIV/BR DIV/BR V-12 A.
DL/SEPB 7
NRC to MU 12/17/79 VI-7 D.
DL/SEPB 7
HRC to MU
$8/l7/78 V-13 X
.1RC to MU 05/97/81 VI-7 E.
X NRC to NU 05/87/81 VI-1 DE/CEB 7
NRC to MU 82/26/82 VI-7 F.
X MRC to MU 11/16/79 VI-2 A.
X NRC to NU 05/87/81 VI-S X
HRC to MU 05/07/41 VI-2 3.
X NRC to NU 05/87/81 VI-9 X
HRC to NU 11/16/79 VI-2 C.
X HRC to NU 11/16/79 VI-18 A.
DL/SEPS 7
NRC to NU 10/04/81 VI-2 D.
DSI/ CSS 7
HRC TO MU 09/15/82 VI-10 5.
DL/SEPB 7
NU to NRC 04/05/81 VI-3 DST / CSS 7
HRC TO MU 09/15/82 VII-1 A.
DL/SEPB 7
HRC to NU 07/23/81 VI-4 DSI/CSB 7(SYS)
HRC TO MU 10/08/82 DL/SEPB 7(ELEC) HRC TO MU 96/24/82 VII-1 B.
DL/SEPB 7
MRC to MU 08/17/78 VI-5 X
NRC to NU 05/07/81 VII-2 DL/SEPB 7
NU TO NRC 06/25/82 VI-6 DSI/CSB 7
NRC TO MU 18/22/82 VII-5 DL/SEPS 7(Sys)
NU to NRC 87/22/St DL/SEPB 7(ELEC) MRC TO MU 09/16/82 VI-7 A.
1 X
NRC to NU 11/16/79 VII-4 X
NRC to MU 05/07/81 VI-7 A. 2.
X NRC to MU 05/07/81 VII-5 X
MRC to NU 05/07/81 VI-7 A. 3.
DL/SEPB 7
NRC to MU 10/27/41 VII-6 DL/SEPR 7
NRC to NU 88/26/81 VI-7 A. 4.
DSI/CPB 7
MRC TO MU 03/11/82 VII-7 X
NRC to NU 11/16/79 VI-7 3.
X NRC to MU 11/16/79 VIII-1 A.
DSI/PSB 7
NRC TO MU 06/30/82 VI-7 C.
DL/S EPR 7
NRC to MU 43/29/41 VIII-2 DL/SEPB 7
NRC to NU 09/30/81 VI-7 C.
1.
DL/SEPB 7
HU to NRC 11/02/41 VIII-3 A.
DL/SEPB 7
NRC to MU 98/26/81 VI-7 C. 2.
DL/SEPS 7
NRC to NU 03/29/81 VIII-5 5.
DL/SEPS 7
NRC to NU 07/23/81 VI-7 C. 3.
X NRC to MU 11/16/79 VIII-4 DL/SEPB 7
NRC to NU 07/07/S?
i (2-25)
MILLSTONE 1 TOPIC NO.
REVIEW STATUS REMARKS TOPIC HO.
REVIEW STATUS REMARKS DIV/BR DIV/BR IX-1 DSI/ASB 7
NRC TO HU 03/09/82 XV-10 X
NRC to NU 11/16/79 IX-2 X
HRC to NU 05/07/81 XV-11 DSI/CPB 7
NRC to NU 10/14/81 IX-3 DL/SEPB 7
NRC TO HU 07/16e82 XV-12 X
NRC to NU 11/16/79 IX-4 X
NRC to NU 11/16/79 XV-13 DSI/CPB 7(Sys)
NU to NRC 09/09/81 DSI/AEB 7(Doses) HRC to NU 11/03/81 IX-5 DL/SEPB 7
NRC TO HU 09/14/82 XV-14 DSI/R$B 7
NRC to NU 09/18/81 IX-6 DE 7
HRC TO NU 06/15/82 XV-15 DSI/RSB 7
NRC to NU 10/28/81 X
X NRC to NU 05/07/81 XV-16 DSI/AEB 7
HU to NRC 01/13/82 XI-1 X
HRC to HU 12/04/81 XV-17 X
NRC to NU 11/16/79 XI-2 X
HRC to NU 12/04/81 XV-18 DSI/AEB 7
HU to NRC 01/13/82 XIII-1 X
HRC to NU 05/07/81 XV-19 DSI/RSB 7(Sys)
NRC to NU 08/26/81 XIII-2 DL/SSPB 7
HRC TO HU 06/09/82 DSI/AEB 7(DOSES) HRC TO NU 01/13/82 XV-1 DSI/RSB 7
HRC to HU 12/31/81 XV-20 DSI/AES 7
NRC to NU 11/03/81 XV-2 X
NRC to NU 11/16/79 XV-21 X
HRC to NU 05/07/81 XV-3 DSI/RSB 7
HRC to NU 09/18/81 XV-22
'X NRC to NU 05/07/81 XV-4 DSI/RSB 7
NRC to NU 09/18/81 XV-23 X
NRC to NU 05/07/81 XV-5 DSI/RSB 7
HRC to NU 01/07/82 XV-24 X
NRC to NU 05/07/81 XV-6 X
NRC to NU 11/16/79 XVI X
NRC to NU 11/15/80 XV-7 DSI/RSB 7
HRC to NU 12/04/81 XVII DL 7
NRC to NU 08/17/78 XV-8 DSI/CPB 7
NRC to NU 08/26/81 XV-9 DSI/RSB 7
NRC to NU 01/12/82 (2-26)
OYSTER CREEK FACILITY: OYSTER CREEK 1 TOPIC HO.
REVIEW STATUS REMARKS DIV/BR LICENSEE JERSEY CENTRAL POWER & LIGHT II-1 A.
DE/SAB 7
NRC to JCPL 02/04/82 REGION / LOCATION: 9 MILES SOUTH OF TOMS RIVER, NJ.
II-1 B.
DE/SAB 7
HRC to 02/04/82 DOCKET NO.s 05000219 II-1 C.
DE/SAB 7
PL 02/04/82 POWER CAPACITY: 1930(THERMAL) 0650(ELECTRICAL)
II-2 A.
DSI/AEB t J L 11/16/81 OL NUMBER: DPR-16
('"k RC to JCPL 05/07/81 II-2 B.
H.S.S.S.: GE.
II-2 DSI/
7 HRC TO JCPL 03/16/82 A/E FIRMS 88R I-2 X
HRC to JCPL 05/07/81 SYSTEMATIC EVALUATION PROGRAM BRANCH CHIEF: W. RUS I
I-DE/HGEB 7
HRC TO JCPL 08/27/82 II-3 B.
GE8 7
NRC TO JCPL 08/27/82 OPERATING REACTORS BRANCH CHIEF: D. CRUTC D
OPERATING REACTORS PROJECT MANAGER:
O BAR I
1.
EB 7
HRC TO JCPL 08/27/82 AGI G.
A IHA II-E/HGEB 7
HRC TO JCPL 08/27/82 INTEGRATED ASSESSMENT P y C e'liiSitrutECJLtS s
""' ** d
d lh%-)
II-4 A.
NRC to JCPL 06/08/81 V
EI D GSB 7
HRC to JCPL 08/03/81 G-E 4a-DRAFT SE R FROM REVIEb CH X-L ED DE/GSB 7
HRC to JCPL 06/08/81 4b-SAR RECEIVED FROM g
II-4 D.
DE/HGEB 7
HRC TO JCPL 06/28/82 0 - TOPIC HOT LICENSEE STARTED 5 - DRAFT E SEN II-4 E.
X HRC to JCPL 11/16/79 1 - QUESTIONS RECEIVED Tff I
FROM REVIEW BRANCH II-4 F.
DE/HGEB 7
HRC TO JCPL 06/15/82 i
6 - SI RECEIVED 2 - QUESTIONS SENT B1 III-1 DL/SEPB 7($YS)
HRC TO JCPL 08/30/82 TO UTILITY DL/SEPB 7(Elec) HRC to JCPL 07/09/81 7 - TOPIC COMPLETE 3 - QUESTION RESPONSE III-2 DL/SEPB 7
HRC TO JCPL 06/15/82 RECEIVED BY NRC (2-27)
OYSTER CREEK TOPIC H0.
REVIEW STATUS REMARKS TOPIC N0.
REVIEW STATUS REMARKS DIV/BR DIV/BR III-3 A.
DE/SEB 7
HRC TO JCPL 05/14/82 III-te B.
X HRC to JCPL 11/16/79 III-3 B.
X HRC to JCPL 12/26/80 III-10 C.
X HRC to JCPL 11/16/79 III-3 C.
DE/HGER 7
HRC TO JCPL 08/27/82 III-11 X
HRC to JCPL 05/07/88 III-4 A.
DSI/ASB 7
HRC TO JCPL 08/27/82 III-12 X
HRC to JCPL 05/07/81 III-4 B.
DE/MT EB 7
NRC TO JCPL 06/28/82 IV-1 A.
DL/SEPB 7
HRC to JCPL 05/30/79 III-4 C.
DSI/ASB 7
HRC TO JCPL 06/15/82 IV-2 DSI/ICSB 7
HRC TO JCPL 06/18/82 III-4 D.
DE/SAB 7
HRC TO JCPL 06/21/82 IV-3 X
HRC to JCPL 05/07/81 III-5 A.
DL/SEPB 7
NRC TO JCPL 06/29/82 V-1 X
HRC to JCPL 11/27/81 III-5 8.
DL/SEPB 7
HRC TO JCPL 06/22/82 V-2 X
HRC to JCPL 11/16/79
.III-6 DL/SEPB 7
HRC TO JCPL 05/12/82 V-3 X
HRC to JCPL 05/07/81 III-7 A.
X HRC to JCPL 05/07/81 V-4 X
HRC to JCPL 05/07/81 III-7 B.
DL/SEPB 7
HRC TO JCPL 08/27/82 V-5 DL/SEPB 7
HRC to JCPL 02/22/82 III-7 C.
X HRC to JCPL 11/16/79 V-6 DL/SEPB 7
HRC to JCPL 03/05/80 III-7 D.
DE/SEB 7
HRC TO JCPL 03/08/82 V-7 X
HRC to JCPL 05/07/81 III-8 A.
DSI/CPB 7
HRC TC ICPL 02/29/82 V-8 X
HRC to JCPL 05/07/81 III-8 B.
X NRC to JCPL 09/26/80 V-9 X
HRC to JCPL 11/16/79 III-8 C.
DL/SEPB 7
HRC to JCPL 10/30/80 V-10 A.
DL/SEPB 7
JCPL to NRC 05/15/79 l
III-8 D.
X HRC to JCPL 05/07/81 V-10 B.
DL/SEPB 7
HRC to JCPL 09/25/80 III-9 X
HRC to JCPL 95/07/81 V-11 A.
DL/SEPB 7
HRC to JCPL 07/08/81 III-10 A.
DL/SEPB 7
HRC to JCPL 06/29/81 V-11 B.
DL/SEPB 7(Sys)
HRC to JCPL 09/25/80 DL/SEPB 7(Elec) HRC to JCPL 07/09/81 (2-28)
OYSTER CREEK TOPIC HO.
REVIEW STATUS REMARKS TOPIC NO.
REVIEW STATUS REMARKS DIV/BR DIV/BR V-12 A.
DL/SEPB 7
NRC TO JCPL 03/16/81 VI-7 D.
DL/SEPB 7
NRC to JCPL 08/17/78 V-13 X
HRC to JCPL 05/07/81 VI-7 E.
X HRC to JCPL 05/07/81 VI-1 DE/CEB
'7 NRC TO JCPL 06/29/82 VI-7 F.
X NRC to JCPL 11/16/79 VI-2 A.
X HRC to JCPL 05/07/81 VI-8 X
NRC to JCPL 05/07/81 VI-2 B.
X HRC to JCPL 05/07/81 VI-9 X
NRC to JCPL 11/16/79 VI-2 C.
X HRC to JCPL 11/16/79 VI-10 A.
DL/SEPB 7
HRC to JCPL 08/18/81 VI-2 D.
DSI/CSB 7
NRC TO JCPL 04/30/82 VI-10 B.
X NRC to JCPL 11/16/79 VI-3 DSI/CSB 7
NRC TO JCPL 04/30/82 VII-1 A.
DL/SEPB 7
HRC to JCPL 07/30/81 VI-4 DSI/CSB 7(SYS)
HRC TO JCPL 06/15/82 VII-1 B.
DL/SEPB 7
NRC to JCPL 12/28/81 DL/SEPB 7(Elec) HRC to JCPL 08/05/81 VII-2 DL/SEPB 7
HRC TO JCPL 06/29/81 VI-5 X
HRC to JCPL 05/07/81 VII-3 DL/SEPB 7(Sys)
HRC to JCPL 09/25/80 VI-6 DSI/CSB 7
HRC TO JCPL 03/04/82 DL/SEPB 7(Elec) HRC to JCPL 07/09/81 VI-7 A.
1.
X NRC to JCPL 11/16/79 VII-4 X
NRC to JCPL 05/07/81 VI-7 A. 2.
X NRC to JCPL 05/07/81 VII-5 X
HRC to JCPL 05/07/81 VI-7 A. 3.
DL/SEPB 7
NRC to JCPL 07/30/81 VII-6 DL/SEPB 7
HRC to JCPL 08/29/81 VI-7 A. 4.
DSI/RSB 7
HRC TO JCPL 08/27/82 VII-7 X
HRC to JCPL 11/16/79 VI-7 B.
X HRC to JCPL 11/16/79 VIII-1 A.
DSI/PSB 7
HRC to JCPL 03/03/82 VI-7 C.
DL/SEPB 7
HRC to JCPL 03/13/81 VIII-2 DL/SEPB 7
HRC to JCPL 06/29/81 VI-7 C.
1.
DL/SEFB 7
NRC to JCPL 06/29/81 VIII-3 A.
DL/SEPB 7
NRC to JCPL 06/29/81 VI-7 C. 2.
DL/SEPB 7
HRC to JCPL 03/13/81 VIII-3 B.
DL/SEPB 7
NRC to JCPL 06/29/81 VI-7 C. 3.
X NRC to JCPL 11/16/79 VIII-4 DL/SEPB 7
NRC TO JCPL 08/26/81 (2-29)
1]Ilf!siflElt I:llHlilill TOPIC NO.
REVIEW STATUS REMARKS TOPIC NO.
REVIEW STATUS REMARKS DIV/BR DIV/BR IX-1 DSI/ASB 7
NRC TO JCPL 06/01/82 XV-10 X
NRC to JCPL 81/16/79 IX-2 X
HRC to JCPL 05/07/81 XV-11 DSI/CPB 7
MRC TO JCPL 05/17/82 IX-3 DSI/ASB 7
NRC to JCPL 11/13/81 XV-12 X
NRC to JCPL 11/16/79 IX-4 X
NRC to JCPL 05/07/81 XV-13 DSI/AEB 7(DOSES) HRC TO JCPL 09/02/82 DSI/CPB 7(SYS)
HRC to JCPL 05/17/82 IX-5 DL/SEPB 7
NRC TO JCPL 06/28/82 XV-14 DSI/R$5 7
NRC to JCPL 07/16/81 AX-6 DE 7
NRC TO JCPL 06/15/82 XV-15 DSI/RSB 7
NRC to JCPL 12/04/81 X
X NRC to JCPL 05/07/81 XV-16 DSI/AEB 7
NRC TO JCPL 09/02/82 XI-1 X
NRC to JCPL 12/04/81 XV-17 X
NRC to JCPL 11/16/79 XI-2 X
HRC to JCPL 12/04/81 XV-18 DSI/AEB 7
NRC TO JCPL 09/02/82 XIII-1 X
NRC to JCPL 05/07/81 XV-19 DSI/AEB 7(DOSES) HRC TO JCPL 09/02/82 XIII-2 DL/SSPB 7
NRC to JCPL 09/25/80 DSI/RSB 7(Sys)
HRC to JCPL 09/04/81 XV-1 DSI/RSB 7
NRC to JCPL 12/07/81 XV-20 DSI/AEB 7
NRC TO JCPL 09/02/82 XV-2 X
NRC to JCPL 11/16/79 XV-21 X
NRC to JCPL 05/07/81 XV-3 DSI/RSB 7
NRC to JCPL 07/16/81 XV-22 X
NRC to JCPL 05/07/81 XV-4 DSI/RSL 7
NRC to JCPL 07/16/81 XV-23 X
HRC to JCPL 05/07/81 XV-5 DSI/RSB 7
NRC to JCPL 12/07/81 XV-24 X
HRC to JCPL 05/07/81 XV-6 X
NRC to JCPL 11/16/79 XVI X
NRC to JCPL 11/05/80 XV-7 DSI/RSB 7
NRC to JCPL 12/04/81 XVII DL 7
NRC to JCPL 08/17/78 XV-8 DSI/CPB 7
HRC TO JCPL 05/17/82 XV-9 DSI/R$5 7
NRC to JCPL 01/07/82 (2-30)
(
PAllSADES FACILITY: PALISADES TOPIC HO.
REVIEW STATUS REMARKS DIV/BR LICENSEE CONSUMERS POWER II-1 A.
DL/SEPB 7
CPCo to NRC 12/28/79 REGION / LOCATION: 5 MILES SOUTH OF SOUTH HAVEH, MI.
71-1 B.
DL/SEPB 7
CPCo t 12/28/79 DOCKET HO 05000255 II-1 C.
DL/SEPB 7
o RC 05/13/81 POWER CAPACITY: 2530(THERMAL) 0805(ELECTRICAL)
II-2 A.
DSI/AEB t C o 06/30/81 OL NUMBER: DPR-20 II-2 B.
RC to CPCo 05/07/81 H.S.S.S.: C-E II-2 DSI/A 7
HRC to CPCo 64/23/81 A/E FIRMS BECH.
II-2 X
HRC to CPCo 05/07/81 SYSTEMATIC EVALUATION PROGRAM. BRANCH CHIEF: W. RUSS I-DE/HGER 7
NRC to CPCo 02/19/82 OPERATING REACTORS BRANCH CHIEF: D. CRUTCH II-3 B.
GEB 7
HRC to CPCo 02/19/82 OPERATING REACTORS PROJECT MANAGER A BAC I
1.
/ EB 7
HRC to CPCo 02/19/82 INTEGRATED ASSESSMENT P AGI R T.
C ELS II-E/HGEB 7
HRC to CPCo 02/19/82 DE/
CPCo to HRC 07/22/81
{
II-4 A.
E HRC to CPCo 06/08/81 V
DUGSB 7
CPCo to HRC 07/22/81 FROM REVI CH X-ED DE/GSB 7
HRC to CPCo 06/08/81 4b-SAR RECEIVED FROM g
II-4 D.
DE/HGEB 7
CPCo to NRC 06/01/81 0 - TOPIC NOT LICENSEE STARTED 5 - DRAF E SEN II-4 E.
X HRC to CPCo 11/16/79 1 - QUESTIONS RECEIVED T(r FROM REVIEW BRANCH II-4 F.
DE/HGER 7
CPCo to NRC 06/01/81 6 - SI RECEIVED 2 - QUESTIONS SENT BT III-1 DL/SEPB 7(Elec) HRC to CPCo 11/12/80 TO UTILITY DL/SEPB 7(Sys)
HRC to CPCo 02/08/82 7 - TOPIC COMPLETE 3 - QUESTION RESPONSE RECEIVED BY HRC (2-31)
PALISADES TOPIC HO.
REVIEW STATUS REMARKS TOPIC N0.
R EVIEW STATUS R EMARKS DIV/BR DIV/BR III-2 DL/S EPS 7
HRC to CPCo 02/08/82 111-10 5.
DL/SEPS 7
HRC to CPCo 02/02/82 III-3 A.
DE/SER 7
HRC to CPCo 08/26/81 III-10 C.
X HRC to CPCo 11/16/79 III-5 5.
X HRC to CPCo 12/26/80 III-11 X
HRC to LPCo 05/07/81 III-3 C.
DE/HGEB 7
HRC to CPCo 02/22/82 III-12 X
HRC to CPCo 05/07/81 III-4 A.
DSI/AEB 7
HRC to CPCo 02/02/82 IV-1 A.
DL/SEPB 7
CPCo to NRC 02/08/79 III-4 B.
DE/MTER 7
HRC to CPCo 02/08/82 IV-2 DSI/ICSB 7
HRC to CPCo 07/08/82 III-4 C.
DSI/ASB 7
HRC to CPCo 09/21/81 IV-3 X
HRC to CPCo 05/07/81 III-4 D.
DE/SAB 7
CPCo to NRC 08/03/81 V-1 X
HRC to CPCo 11/27/81 III-5 A.
DL/SEPS 7
HRC to CPCo 02/08/82 V-2 X
HRC to CPCo 11/16/79 III-5 B.
DL/SEPB 7
HRC to CPCo 02/19/82 V-3 X
HRC to CPCo 05/07/81 III-6 DL/SEPB 7
CPCo to MRC 12/16/81 V-4 X
HRC to CPCo 05/07/81 III-7 A.
DL/SEPB 7
HRC to CPCo 02/10/82 V-5 DL/SEPB 7
HRC to CPCo 02/04/82 III-7 B.
DL/SEPB 7
HRC to CPCo 02/12/82 V-6 DL/SEPB 7
HRC to CPCo 03/05/80 III-7 C.
DE/SEB 7
HRC to CPCo 10/19/81 V-7 DSI/ASB 7
HRC to CPCo 11/16/81 III-7 D.
DE/SEB 7
CPCo to MRC 08/17/81 V-8 X
HRC to CPCo 05/07/81 III-8 A.
DSI 7
HRC to CPCo 11/18/81 V-9 X
HRC to CPCo 11/16/79 I
l III-8 B.
X HRC to CPCo 10/01/80 V-10 A.
DL/SEPB 7
HRC to CPCo 09/26/81 III-8 C.
DL/MTER 7
CPCo to NRC 12/28/79 V-10 B.
DL/SEPB 7
CPCo to NRC 12/23/81 III-8 D.
X HRC to CPCo 05/07/81 V-11 A.
DL/SEPB 7
HRC to CPCo 11/09/81 III-9 X
HRC to CPCo 05/07/81 V-11 B.
DL/SEPB 7(Sys)
HRC to CPCo 12/23/81 DL/SEPB 7(Elec) HRC to CPCo 12/24/81 III-10 A.
DL/SEPB 7
HRC to CPCo 05/19/81 l
l (2-32) l
PALISADES TOPIC HO.
REVIEW STATUS REMARKS TOPIC HO.
REVIEW STATUS REMARKS DIV/BR DIV/BR V-12 A.
X NRC to CPCo 11/16/79 VI-7 D.
DL/SEPB 7
NRC to CPCo 08/97/78 V-13 X
NRC to CPCo 05/87/81 VI-7 E.
X HRC to CPCo 05/07/81 VI-1 DE/CEB 7
NRC to CPCo 08/03/81 VI-7 F.
DL/SEPB 7
NRC to CPCo 10/29/89 VI-2 A.
X NRC to CPCo 05/07/81 VI-8 X
NRC to CPCo
$5/07/81 VI-2 B.
X HRC to CPCo 05/07/88 VI-9 X
HRC to CPCo 11/16/79 VI-2 C.
X HRC to CPCo 11/16/79 VI-te A.
DL/SEPB 7
NRC to CPCo 10/16/81 VI-2 D.
DSI/CSB 7
HRC to CPCo 11/16/81 YI-10 3.
X NRC to CPCo 11/16/79 VI-3 DSI/ CSS 7,
NRC to CPCo 11/16/81 VII-1 A.
DL/SEPB 7
HRC to CPCo 08/28/81 VI-4 DL/SEPB 7(EIec) CPCo to NRC 88/18/81 VII-t B.
DL/SEPS 7
NRC to CPCo 08/17/78 DCI/CSB 7(Sys)
HRC to CPCo 82/88/82 VII-2 DL/SEPB 7
NRC to CPCo 85/19/81 VI-5 X
HRC to CPCo 85/87/81 VII-3 DL/SEPB 7(Sys)
CPCo to NRC 12/23/81 VI-6 DSI/CSB 7
NRC to CPCo 12711/81 DL/SEPB 7(Elec) CPCo to NRC 12/31/81 VI-7 A.
1.
X NRC to CPCo 11/16/79 VII-4 X
HRC to CPCo 85/07/81 VI-7 A. 2.
X HRC to CPCo 05/07/81 VII-5 X
HRC to CPCo 85/07/81 VI-7 A. 3.
DL/SEPB 7
NRC to CPCo 12/18/81 VII-6 DL/SEPB 7
HRC to CPCo 05/19/81 VI-7 A. 4.
X NRC to CPCo 85/07/81 VII-7 X
NRC to CPCo 11/16/79 VI-7 B.
DL/SEPR 7(EIac) NRC to CPCo 05/19/81 VIII-1 A.
DSI/PSB 7
NRC to CPCo 12/22/81 DSI/RSB 7(Sys)
NRC to CPCo 06/30/88 VIII-2 DL/SEPB 7
HRC to CPCo 10/29/81 VI-7 C.
DL/SEPB 7
HRC to CPCo 02/28/81 VIII-3 A.
DL/SEPB 7
HRC to CPCo 05/22/81 VI-7 C.
1.
DL/SEPB 7
NRC to CPCo 10/14/89 VIII-3 B.
DL/SEPB 7
NRC to CPCo 08/05/81 VI-7 C. 2.
DL/SEPB 7
NRC to CPCo 02/20/81 VIII-4 DL/SEPB 7
HRC to CPCo 07/31/81 VI-7 C. 3.
X CPCo to NRC 12/12/79 (2-33)
PALISADES TOPIP HO.
REVIEW STATUS R EMARKS TOPIC H0.
REVIEW STATUS R EMARKS DIV/BR DIV/BR IX-l DSI/ASB 7
NRC to CPCo 02/08/82 XV-10 DL/SEPB 7
NRC to CPCo 11/03/81 IX-2 X
HRC to CPCo 05/07/81 XV-11 X
HRC to CPCo 10/01/80 IX-3 DL/SEPB 7
HRC to CPCo 02/22/82 XV-12 DL/SEPB 7(Doses) HRC to CPCo 12/04/81 DL/SEPB 7(Sys)
HRC to CPCo 11/03/81 IX-4 DSI/R$8 7
HRC to CPCo 02/08/82 XV-13 X
HRC to CPCo 11/16/79 IX-5 DL/SEPB 7
HRC to CPCo 02/11/82 XV-14 DL/SEPB 7
HRC to CPCo 11/03/31 IX-d DE 7
HRC TO CPC0 04/07/82 XV-15 DL/SEPB 7
NRC to CPCo 11/03/81 X
X HRC to CPCo 05/07/81 XV-16 DL/SEPB 7
NRC to CPCo 11/03/81 XI-1 X
HRC to CPCo 12/04/81 XV-17 DL/SEPB 7(Doses) NRC to CPCo 91/03/81 XI-2 X
HRC to CPCo 12/04/81 DL/SEPB 7(Sys)
NRC to CPCo 11/03/81 XIII-1 X
HRC to CPCo 05/07/81 XV-18 X
NRC to CPCo 10/01/80 XIII-2 DL/SSPB 7
NRC to CPCo 10/01/80 XV-19 DL/SEPB 7(Doses) HRC to CPCo 11/03/81 XV-1 DL/SEPB 7
HRC to CPCo 11/03/81 X4-20 DL/SEPB 7
HRC to CPCo 11/03/81 XV-2 DL/SEPB 7(Doses) HRC to CPCo 11/03/81 DL/SEPB 7(Sys)
HRC to CPCo 11/03/81 XV-21 X
HRC to CPCo 05/07/81 XV-3 DL/SEPB 7
NRC to CPCo 11/03/81 XV-22 X
NRC to CPCo 05/07/81 XV-4 DL/SEPB 7
NRC to CPCo 11/03/81 XV-23 X
HRC to CPCo 05/07/81 XV-5 DL/SEPB 7
HRC to CPCo 11/03/81 XV-24 X
HRC to CPCo 05/07/81 XV-6 DL/SEPB
,7 HRC to CPCo 11/03/81 XVI X
HRC to CPCo 11/05/80 XV-7 DL/SEPB 7
HRC to CPCo 11/03/81 XVII DL 7
HRC to CPCo 08/17/78 XV-8 DL/SEPB 7
NRC to CPCo 11/03/81 XV-9 DL/SEPB 7
HRC to CPCo 11/03/81 (2-34)
[
SAN ONOFRE FACILITY: SAN OHOFRE 1 TOPIC H0.
REVIEW STATUS REMARKS DIV/BR LICENSEE: SOUTHERN CALIFORNIA EDISON II-1 A.
DL/SEPB 7
NRC to SCE 11/07/79 REGION / LOCATION: 5 MILES SOUTH OF SAN CLEMENTE, CA.
II-t B.
DL/SEPB 7
NRC to SCE 11/07/79 DOCKET NO.
05000206 II-t C.
DE/SAB 7
NRC TO SCE 05/03/83 POWER CAPACITY: 1347(THERMAL) 0430(ELECTRICAL)
II-2 A.
DSI/AEB 7
NRC to SCE 04/27/81 OL NUMBER: DPR-13 II-2 B.
X NRC to SCE 05/07/81 H.S.S.S.: WEST.
II-2 C.
DSI/AEB 7
NRC to SCE 11/18/81 A/E FIRM: BECH.
II-2 D.
X NRC to SCE 05/07/81 SYSTEMATIC EVALUATION PROGRAM BRANCH CHIEF: W. RUSSELL II-3 A.
DE/HGEB 5
NRC TO SCE 01/31/83 OPERATING REACTORS BRANCH CHIEF: D. CRUTCHFIELD II-3 B.
DE/HGEB 5
NRC TO SCE 01/31/83 OPERATING REACTORS PROJECT MANAGER: W. PAULSON II-3 B.
1 DE/HGEB 5
HRC TO SCL 01/31/83 E.MCKENHA{j{;p INTEGRATED ASSESSMENT PROJECT MANAGER:
II-3 C.
DE/HGEB 5
NRC TO SCE 01/31/83 II-4 DE/GSB 7
NRC TO SCE 11/18/82 KEY FOR STATUS CODES II-4 A.
DE/GSB 7
NRC TO SCE 11/19/82 G - GENERIC 4a-DRAFT SE RECEIVED II-4 B.
DE/GSB 7
NRC TO SCE 11/18/82 FROM REVIEW BRANCH X - DELETED II-4 C.
DE/GSB 7
NRC TO SCE 09/16/82 4b-SAR RECEIVED FROM 0 - TOPIC NOT LICENSEE II-4 D.
DE/HGEB 7
NRC TO SCE 11/12/82 STARTED 5 - DRAFT SE SENT II-4 E.
X NRC to SCE 11/16/79 1 - QUESTIONS RECEIVED TO UTILITY FROM REVIEW BRANCH II-4 F.
DE/HGEB 7
NRC TO SCE 12/01/82 6 - SE RESPONSE RECEIVED 2 - QUESTIONS SENT BY NRC III-1 DL/SEPB 6(SYS)
SCE TO HRC 01/26/83 TO UTILITY DL/SEPB 7(Elec) Part of VII-3 11/18/81 7 - TOPIC COMPLETE 3 - QUESTION RESPONSE III-2 DL/SEPB 7
NRC TO SCE 02/01/83 RECEIVED BY NRC (2-35) l
SAN ONOFRE TOPIC Ho.
REVIEW STATUS REMARKS TOPIC Ho.
REVIEW STATUS REMARKS DIV/BR DIV/BR III-3 A.
DE/SEB 3
DL/SEPB 7
NRC to SCE 11/08/79 III-3 B.
X HRC to SCE 11/16/79 III-10 C.
X NRC to SCE 11/16/79 III-3 C.
DE/HGEB 7
HRC to SCE 11/27/81 III-11 X
HRC to SCE 05/07/81 III-4 A.
DSI/ASB 7
HRC TO SCE 11/19/82 III-12 X
HRC to SCE 05/07/81 III-4 B.
DE/MTEB 7
HRC TO SCE 02/01/83 IV-t A.
DL/SEPB 7
HRC to SCE 11/13/79 III-4 C.
DSI/ASB 7
HRC TO SCE 10/12/82 IV-2 DSI/ICSB 7
HRC TO SCE 01/03/83 III-4 D.
DE/SAB 7
HRC TO SCE 11/16/82 IV-3 X
HRC to SCE 05/07/81 III-5 A.
DL/SEPB 0
V-1 X
HRC to SCE 11/27/81 III-5 B.
DL/SEPB 45 SCE TO HRC 03/31/83 v-2 X
HRC to SCE 11/16/79 III-6 DL/SEPR 3
HRC to SCE 05/07/81 III-7 A.
X HRC to SCE 05/07/81 V-4 X
HRC to SCE 05/07/81 III-7 B.
DL/SEPB 6
SCE TO HRC 01/26/83 V-5 DL/SEPB 7
HRC TO SCE 03/07/83 III-7 C.
X HRC to SCE 11/16/79 V-6 DL/SEPB 7
HRC to SCE 03/05/80 III-7 D.
DE/SEB 7
HRC TO SCE 0,3/01/83 V-7 DSI/ASB 7'
HRC to SCE 12/04/81 III-8 A.
DSI 7
HRC to SCE 12/21/81 V-8 X
HRC to SCE 05/07/81 III-8 5.
X HRC to SCE 10/01/80 V-9 X
HRC to SCE 11/16/79 III-8 C.
DL/SEPB 7
HRC te SCE 01/29/80 V-te A.
DL/SEPB 7
HRC to SCE 01/07/81 III-8 D.
X HRC to SCE 05/07/81 V-te B.
DL/SEPB 7
HRC 70 SCE 11/12/82 III-9 X
HRC to SCE 05/07/81 V-St A.
DL/SEPB 7
HRC to SCE 08/03/81 III-10 A.
DL/SEPB 7
SCE to NRC 07/24/81 V-11 B.
DL/SEPB 7(SYS)
HRC TO SCE 11/12/82 DL/SEPB 7(Elec) HRC to SCE 02/04/82 (2-36)
SAN ONOFRE TOPIC N0.
REVIEW STATUS REMARKS TOPIC MO.
REVIEW STATUS REMARKS DIV/BR DIV/BR V-12 A.
X HRC to SCE 11/16/79 VI-7 D.
DL/SEPB 7
NRC to SCE 08/17/78 V-13 X
NRC to SCE 05/07/81 VI-7 E.
X NRC to SCE 05/87/81 VI-1 7
NRC TO SCE 07/13/82 VI-7 F.
X HRC to SCE 11/16/79 VI-2 A.
X NRC to SCE 85/07/81 VI-8 X
X NRC to SCE 05/07/81 VI-9 X
X NRC to SCE 11/16/79 VI-10 A.
DL/SEPB 7
DSI/ CSS 7
NRC TO SCE 02/24/83 VI-10 B.
DL/SEPR 7
MRC to SCE 11/15/79 VI-3 DSI/CSB 7
NRC TO SCE 02/24/83 VII-1 A.
DL/SEPB 7
MRC TO SCE 02/18/83 VI-i DSI/CSB 7(SYS)
SCE TO NRC 06/28/83 DL/SEPB 7(Elec) HRC to SCE 12/06/82 VII-I B.
DL/SEPB 7
MRC to SCE 05/07/81 VII-2 DL/SEPB 7
MRC TO SCE 03/29/83 VI-6 DSI/CSB 7
NRC TO SCE 08/12/82 VII-3 DL/SEPB 7(SYS)
HRC TO SCE 11/12/82 DL/SEPB 7(Elec) HRC to SCE 06/04/82 VI-7 A.
1 DL/SEPB 7
NRC to SCE 02/20/81 VII-4 X
NRC to SCE 05/87/81 VI-7 A. 2.
X NRC to SCE 05/07/89 VII-5 X
NRC to SCE 05/07/81 VI-7 A. 3.
DL/SEPB 7
NRC TO SCE 02/01/83 VII-6 DL/SEPB 7
HRC to SCE 08/28/81 VI-7 A. 4.
X NRC to SCE 05/07/81 VII-7 X
DSI/RSB 7(SYS)
HRC TO SCE 11/24/82 DL/SEPB 7(Elec) SCE TO NRC 09/15/82 VIII-1 A.
DST /RSB 7
DL/SEPB 7
NRC to SCE 06/01/81 VIII-2 DL/SEPB 7
NRC to SCE 87/31/81 VI-7 C.
1 DL/SEPB 7
HRC to SCE 08/03/81 VIII-3 A.
DL/SEPB 7
MRC to SCE 11/07/79 VI-7 C. 2.
DL/SEPB 7
NRC to SCE 06/01/81 VIII-3 B.
DL/SEPB 7
NRC TO SCE 02/24/83 VI-7 C. 3.
X NRC to SCE 11/16/79 VIII-4 DL/SEPB 7
HRC TO SCE 12/06/82 (2-373
SAN ONOFRE TOPIC HO.
REVIEW STATUS REMARKS TOPIC HO.
REVIEW STATUS REMARKS DIV/BR DIV/BR IX-1 DSI/ASB 7
HRC TO SCE 12/07/82 XV-10 DSI/R$8 7
F<C TO SCE 03/29/83 IX-2 X
HRC to SCE 05/07/81 XV-11 X
NRC to SCE 10/01/80 IX-3 DL/SEPB 7
HRC TO SCE 12/27/82 XV-12 DSI/RSB 7(Sys)
HRC to SCE 04/05/82 DL/SEPB 7(Doses) HRC to SCE 01/29/80 IX-4 DSI/RSB 7
NRC to SCE 07/16/81 XV-13 X
NRC to SCE 11/16/79 IX-5 DL/SEPB 7
SCE TO NRC 06/24/83 XV-14 DSI/RSB 7
NRC TO SCE 12/02/82 XV-15 DSI/RSB 7
NRC TO SCE 04/20/82 X
X NRC to SCE 05/07/81 XV-16 DSI/AEB 7
NRC to SCE 04/05/82 XI-1 X
HRC to SCE 12/04/81 XV-17 DSI/RSB 7(Sys)
SCE TO NRC 03/12/82 XI-2 X
HRC to SCE 12/04/81 DSI/AEB 7(Doses) HRC to SCE 01/29/80 XIII-1 X
HRC to SCE 05/07/81 XV-18 X
HRC to SCE 10/01/80 XIII-2 DL/SSPB 7
HRC to SCE 01/22/81 XV-19 DSI/RSB 7(Sys)
SCE TO NRC 03/12/82 DL/SEPB 7(Doses) HRC to SCE 01/29/80 XV-1 DSI/R$5 7
NRC TO SCE 07/22/82 XV-20 DL/SEPB 7
NAC to SCE 03/28/80 XV-2 DSI/R$B 7(SYS)
HRC TO SCEP 12/17/82 DL/SEPB 7(Doses) HRC to SCE 01/29/80 XV-21 X
HRC to SCE 05/07/81 XV-3 DSI/RSS 7
SCE TO NRC 03/12/82 XV-22 X
NRC to SCE 05/07/81 XV-4 DSI/R$5 7
HRC to SCE 04/05/82 XV-23 X
HRC to SCE 05/07/81 XV-5 DSI/R$8 7
NRC TO SCE 03/14/83 XV-24 X
NRC to SCE 05/07/81 XV-6 DSI/R$B 7
NRC TO SCE 03/03/82 XVI X
NRC to SCE 11/05/80 XV-7 DSI/RSB 7
SCE TO HRC 06/17/83 XVII DL 7
NRC to SCE 11/20/79 XV-8 DSI/CPB 7
SCE TO HRC 03/12/82 XV-9 DSI/R$8 7
NRC to SCE 02/24/82 (2-38)
YANKEE FACILITY YANKEE NUCLEAR POWER STATIDH TCPIC NO.
REVIEW STATUS REMARKS DIV/BR LICENSEES YANKEE ATOMIC ELECTRIC 11-1 A.
DE/SAB 7
HRC TO YAEC 07/13/82 REGION / LOCATION: 25 MILES HORTH EAST OF PITTSFIELD, MASS.
~
POCKET Ho.s 05000029 II-1 C.
DE/SAB 7
C AEC 07/13/82 POWER CAPACITY 600(THERMAL) 165(ELECTRICAL)
II-2 A.
DSI/AE R
Y EC 08/03/81 OL NUMBER: DPR-3 II-2 B.
NRC to YAEC 05/07/81 H.S.S.S.: WEST.
II-D I/
7 HRC to YAEC 09/04/81 A/E FIRMS $8W
-2 X
HRC to YAEC 05/07/81 SYSTEMATIC EVALUATION PROGRAM BRANCH CHIEF: W. RUS L
g II DE/HGEB 7
MRC TO YAEC 09/30/82 CPERATING REACTORS BRANCH CHIEF: D. CRUTC II-3 B.
HGER 7
HRC TO YAEC 09/30/82 l
OPERATING REACTORS PROJECT MANA'GER: J. L NS I
1 GEB 7
NRC TO YAEC 09/30/82
~
INTEGRATED ASSESSMENT AC M.
O E II DE/HGES NRC TO YAEC 09/30/82
\\
%d DE/
NRC to YAEC 07/15/82 GR S TtI ES l
5
'ws'~
l II-4 A.
7 NRC to YAEC 06/08/81 G
/GSB 7
NRC TO YAEC 07/15/82 FROM REVI NCH X-TED DE/GSB 7
HRC to YAEC 06/08/81 4b-SAR RECEIVED FROM r
0 - TOPIC NOT LICENSEE II-4 D.
DE/HGER 7
HRC TO YAEC 09/02/82 STARTED 5 - DRAF E SEN II-4 E.
DE/HGEB 7
HRC TO YAEC 01/27/83 1 - QUESTIONS RECEIVED TD I
FROM REVIEW BRANCH l
II-4 F.
DE/HGEB 7
HRC TO YAEC 09/16/82 6-S RECEIVED 2 - QUESTIONS SENT B
III-1 DL/SEPB 7(Elec) HRC to YAEC 09/14/82 TO UTILITY DL/SEPB 7(SYS)
HRC TO YAEC 06/18/82 7 - TOPIC COMPLETE 3 - QUESTION RESPONSE III-2 DL/SEPS 7
HRC TO YAEC 08/31/82 RECEIVED BY NRC (2-39)
t YAMEE TOPIC NO.
REVIEW STATUS REMARKS TOPIC NO.
REVIEW STATUS.
REMARKS DIV/SR DIV/BR III-5 A.
DE/SEB 7
NRC TO YAEC 10/13/82 III-10 5.
X MRC to YAEC 11/16/79 III-3 B.
X HRC to YAEC 12/26/80 III-te C.
X MRC to YAEC 11/16/79 III-3 C.
DE/MGES 7
NRC TO YAEC 10/04/82 III-11 X
NRC to YAEC 05/07/81 III-4 A.
DSI/ASB 7
NRC TO YAEC 08/31/82 III-12 X
NRC to YAEC 05/07/81 III-4 B.
DE/MTER 7
NRC to YAEC 02/08/82 IV-1.A.
DL/SEPB 7
HRC to YAEC 04/18/79 III-4 C.
DSI/ASB 7
NRC TO YAEC 09/29/82 IV-2 DSI/ICSB 7
HRC to YAEC 12/23/81 i
III-4 D.
DE/SAB 1
NRC TO YAEC 07/13/82 IV-3 X
NRC to YAEC 05/07/81 III-5 A.
DL/SEPR 7
NRC TO YAEC 08/20/82 V-1 X
NRC to YAEC 11/27/81 III-5 B.
DL/SEPB 7
NRC TO YAEC 06/29/82 V-2 X
MRC to YAEC 11/16/81 III-6 DL/SEPB 7
HRC TO YAEC 02/01/83 V-3 X
NRC to YAEC 05/07/89 III-7 A.
X NRC to YAEC 05/07/81 V-4 X
NRC to YAEC 05/07/81 III-7 B.
DL/SEPB 7
HRC TO YAEC 01/27/83 V-5 DL/SEPB 7
HRC TO YAEC 07/13/82 III-7 C.
X NRC to YAEC 11/16/79 V-6 DL/SEPB 7
HRC to YAEC 03/05/88 III-7 D.
DE/SEB 7
NRC TO YAEC 03/18/82 V-7 X
HRC to YAEC 12/14/81 III-8 A.
DSI,
7 NRC to YAEC 12/29/81 V-8 X
MRC to YAEC 05/07/81 III-8 3.
X.
NRC to YAEC 10/01/80 V-;
X NRC to YAEC 11/16/79 III-8 C.
DL/SEPR 7
NRC to YAEC 11/15/79 V-10 A.
DL/SEPB 7
HRC to YAEC 11/05/79 III-8 D.
X HRC to YAEC 05/07/81 V-te B.
DL/SEPB 7
NRC to YAEC 02/01/82 III-9 X
NRC to YAEC 05/07/88 V-11 A.
DL/SEPB 7
NRC to YAEC 07/27/82 III-te A.
DL/SEPB 7
NRC to YAEC 09/22/81 V-11 B.
DL/SEPB 7(Sys)
HRC to YAEC 02/01/82 DL/SEPB 7(Elec) HRC to YAEC 07/27/82 (2-40)
YANKEE TOPIC NO.
REVIEW STATUS REMARKS TOPIC NO.
REVIEW STATUS REMARKS DIV/BR DIV/BR W-12 A.
X NRC to YAEC 11/16/79 WI-7 D.
DL/SEPB 7
MRC to YAEC 88/17/78 V-13 X
HRC to YAEC 05/07/81 VI-7 E.
X HRC to YAEC 05/07/81 VI-t DE/CEB 7
HRC TO YAEC 01/27/83 VI-7 F.
DL/SEPB 7
NRC to YAEC 08/28/81 VI-2 A.
X NRC to YAEC 05/07/81 VI-8 X
MRC to YAEC 05/07/81 VI-2 B.
X NRC to YAEC 05/07/81 VI-9 X
HRC to YAEC 11/16/79 VI-2 C.
X HRC to YAEC 11/16/79 VI-10 A.
DL/SEPB 7
HRC to YAEC 06/10/22 VI-2 D.
DSI/CSB 7
HRC TO YAEC 08/20/82 VI-10 3.
X NRC to YAEC 11/16/79 VI-3 DSI/CSB 7
NRC TO YAEC 08/20/82 VII-1 A.
DL/SEPB 7
HRC to YAEC 02/22/82 VI-4 DSI/CSB 7(SYS)
HRC TO YAEC 11/24/82 VII-t B.
DL/SEPB 7
HRC to YAEC 08/17/78 DL/SEPB 7(Elec) HAC to YAEC 03/05/82 VII-2 DL/SEPB 7
HRC to YAEC 02/01/82 VI-5 X
NRC to YAEC 05/07/81 VII-3 DL/SEPB 7(Sys)
HRC to YAEC 02/01/82 VI-6 DSI/CSB 7
NRC TO YAEC 09/02/82 DL/SEPB 7(Elec) HRC to YAEC 09/14/82 VI-7 A.
1.
DL/SEPB 7
HRC to YAEC 02/20/81 VII-4 X
NRC to YAEC 05/07/88 VI-7 A. 2.
X HRC to YAEC 05/07/81 VII-5 X
HRC to YAEC 45/07/81 VI-7 A. 3.
DL/SEPB 7
HRC to YAEC 02/08/82 VII-6 DL/SEPB 7
MRC to YAEC 08/28/81 VI-7 A. 4.
X HRC to YAEC 05/07/81 VII-7 X
HRC to YAEC 11/16/79 VI-7 B.
DSI/RSB 7(Elec) HRC to YAEC 06/04/81 VIII-t A.
DSI/PSB 7
NRC TD YAEC 11/02/82 7($YS)
HRC TO YAEC 07/13/82 VI-7 C.
DL/SEPB 7
HRC to YAEC 03/13/81 VIII-2 DL/SEPB 7
HRC to YAEC 09/03/81 VI-7 C.
1.
DL/SEPB 7
HRC to YAEC 09/04/82 VIII-3 A.
DL/SEPB 7
HRC to YAEC 11/07/79 VI-7 C. 2.
DL/SEPB 7
HRC to YAEC 03/13/81 VIII-3 B.
DL/SEPB 7
HRC to YAEC 08/28/81 VI-7 C. 3.
DL/SEPB 7
HRC to YAEC 07/24/80 VIII-4 DL/SEPB 7
NRC TO YAEC 08/13/82 (2-41)
4 11fillllM[l!IEL i
TOPIC MO.
REVIEW STATUS REMARKS TOPIC NO.
REVIEW STATUS REMARKS i
DIV/BR DIV/BR l-IX-1 DSI/ASB 7
NRC TO YAEC 09/16/82 XV-10 DSI/RSS 7
NRC TO YAEC 04/26/82 IX-2 X
NRC to YAEC 05/07/81
'XV-11 X
NRC to YAEC 10/01/80 i
I IX-3 DL/SEPB 7
hKC TO YAEC 06/11/82 XV-12 DSI/CPB 7(SYS)
NRC TO YAEC.
04/16/82 DSI/AEB 7(Doses) HRC to YAEC 12/29/81 IX-4
-DSI/RSB 7
H5C TO YACC 06/15/82 XV-13 X
NRC to'YAEC 11/16/79 IX-5 DL/SEPB 7
NRC TO YAEC 06/14/82 XV-14 DSI/RSB 7
NRC TO YAEC 07/14/82 IX-6 DE 7
NRC TO YAEC 01/27/8;
'XV-15 DSI/R$B 7
NRC TO YAEC 05/10/82 X
X NRC to YAEC 05/07/81' i
XV-16 DSI/AER 7
NRC TO YAEC 08/31/82 XI-1 X'
HRC to YAEC 12/04/81 XV-17 DSI/RSB 7($YS)
NRC TO YAEC 08/31/82 4
XI-2 X
HRC to YAEC 12/04/81 DSI/AEB 7(DOSES) HRC TO YAEC 03/30/82 5
XIII-1 X
NRC to YAEC 05/07/81 XV-18 X
NRC to YAEC 10/01/80 XIII-2 DL/SSPB 7
NRC to YAEC 08/31/82 XV-19 DSI/RSS 7(SYS)
HRC TO YAEC F7/13/82 DSI/AEB 7(DOSES) NRC TO YAEC 09/01/82 XV-1 DSI/RSB 7
NRC TO YAEC 07/19/82 I
XV-i DSI/RSB 7(SYS)
HRC TO YAEC 07/13/82 i
DSI/AEB
~7(DOSES) HRC TO YAEC 01/27/83 XV-21 X
NRC to YAEC 05/07/81 XV-3 L:T/RSB 7
NRC to YAEC 01/25/82 XV-22 X
NRC to YAEC 05/07/81 XV-4 DSI/RSB 7
HRC TO YAEC 07/21/82 XV-23 X
NRC to YAEC 05/07/81 XV-5 DSI/RSB 7
NRC.to YAEC 02/10/82 XV-24 X
NRC to YAEC 05/07/81 XV-6 DSI/RSB 7
HRC TO YAEC 07/13/82 XVI.
X NRC to YAEC 11/05/80 i
XV-7 DSI/RSB 7
NRC TO YAEC 06/29/82 XVII DL 7
MRC to YAEC 11/20/79 XV-8 DSI/CPB 7
NRC TO YAEC 03/05/82 j.
XV-9 DSI/RSB 7
HRC TO YAEC 06/25/82 I;.
1 t
t i
(2-42) i I
t
a 1
+
.-2
.M
.a_m I
I l
t l
l C
>(J LaJ M
l i
l t
l
...w
.--,.-.--___._,,,_,_,-.__,.._..__,,,.,.,.,-..r-
PALISADES ISSUES RE9UIRING REFINED ENGINEERING AIALYSIS OR CONTINUATION OF ONGO!70 EVALUATION FROM NURES-0820.
(FINAL) INTEGRATED PLANT SAFETY ASSESSMENT DATES-OCTOBER 1982 i
IPSAR SEP LICENSEE
'SER SECTION.
' TOPIC TAC REVIEW SUBMITTAL SER ISSUE NUMBER 1/
TITLE REFERENCE NO.
BRANCH SCHEDULE 2/
INPUT }/
DATE 1/
4.2 II-3.5 i
4.3 II-3.B.1 4.4 FLOODING ISSUES II-3.C 48722 HGEB 03/23/82C 10/04/82C 10/07/82C 4.5 CLASSIFICATION OF STRUCTURES, COMPONENTS AND III-1 48723 SEPB 08/16/82C 06/27/83C 06/27/83C SYSTEMS (SEISMIC AND QUALITY) 4.9 EFFECTS OF PIPE BREAKS ON STRUCTURES, SYSTEMS, AND III-5.A 48724 MEB 12/09/82C 04/22/83C 06/22/83C CDMPONENTS INSIDE CONTAINMENT.
4.10(1) SEISMIC COMPONENT EVALUATIONS III-6 48725 SEPB 10/13/a.J 06/15/83C 07/25/83C-06/30/83 4.10(2) 01/18/83C 4.12 DESIGN CODES, DESIGN CRITERIA, LOAD CONFIGURATIONS III-7.B 48726 SEPB 02/28/83P 06/30/83 07/30/83 AND REACTOR CAVITY DESIGN CRITERIA.
4.26 ELECTRICAL PENETRATIONS OF REACTOR CONTANMENT VIII-4 48727 SEPR 02/11/83P 06/10/83C 06/10/83C 4.27.1 COOLING OF CCW HEAT EXCHANGER IX-3 48728 SEPB 01/06/83C 05/20/83C 05/31/83C 4.28.1 VENTILATION SYSTEMS IX-5 48729 SEPB-11/01/82C 05/31/83C 06/03/83C 4.28.2 l
l/ REFERS TO INTEGRATED PLANT SAFETY ASSESSMENT REPORT (HUREG-0820), TABLE 4-1 2/ LICENSEE ANALYSIS OR EVALUATION SUBMITTAL COMMITMENT DATE - WHEN FOLLOWED BY P INDICATES PARTIAL SUBMITTAL, WHEN FOLLOWED BY A C INDICATES COMPLETE SUBMITTAL, AND WHEN FOLLOWED BY A T INDICATES TARGET DATE FJR SUBMITTAL.
1/ STAFF SAFETY EVALUATIDH REPORT - SCHEDULED-OR COMPLETE - COMPLLTE WHEN FOLLOWED BY A C 1/ ISSUANCE TO LICENSEE OF STAFF SAFETY EVALUATION REPORT - SCHEDULED OR COMPLETE - COMPLETE WHEN FOLLOWED BY A C t
3-2
IPSAR SUPPLEMENT STATUS PALISADES TACS la LIC. RESP. REC'D SER I H T REC'D 8--
SER ISSUED l
/
GOAL 6--
/
/'
jll 4-l l'
,-f-l 2--
ll l,'/
3' i
L' I
I I
I I
I I
I I
I I
i 1
g DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR 4
LIC RESP REC'D 4
5 5
5 5
5 6
1 1
1 2
2 6
7 SERISSUED 1
1 1
1 1
4 6
6 G0AL 8
0
~B 1
3 3
7 8
3-3
GINNA" ISSUES. REQUIRING REFINED ENGINEERING ANALYSIS OR CONTINUATION OF ONGOING EVALUATION FROM NUREG-0821 (FINAL) INTEGRATED PLANT SAFETY ASSESSMENT DATE: DECEMBER 1982 IPSAR SEP LICENSEE SER SECTION -
TOPIC TAC REVIEW SUBF1ITTAL SER ISSUE HUMBER.1/
TITLE REFERENCE NO.
BRANCH SCHEDULE 2/
IMPUT 1/
DATE 1/
4.3 II-3.B 4.4 II-3.5.1 4.5 FLOODING OF DEER CREEK
.II-3.C 48882 NEGB 05/20/83C 06/30/83 07/30/83 4.9.2 III-3.A 4.7 CLASSIFICATION OF STRUCTURES, COMPONENTS, AND III-1 48883 SEPB 01/24/83C 06/18/83C 06/28/83C SYSTEMS (SEISMIC AND QUALITY) 4.8 STRUCTURAL UPGRADE PROGRAM III-2 48881 SEPB 04/22/83P 05/27/83C 07/29/83C 07/15/83 4.11.2 III-4.A 04/22/83P 05/27/83C 4.17 III-7.5 04/22/83P 05/27/83C 4.13.2 PIPE BREAK INSIDE CONTAINMENT III-5.A 48887 SEPB 04/22/83C 06/20/83C 06/28/83C 4.13.3 4.14 PIPE BREAK OUTSIDE CONTAINMENT III-5.5 48888 SEPB 03/22/83C 04/21/83C 04/21/83C 4.15.4 SEISMIC COMPONENT EVALUATION III-6 48889 SEPB 04/11/83P 06/16/83C 06/30/83C 07/15/83 4.15.5 4.15.6 4.15.7 4.17.1
- CONTAINMENT LINER INSULATION III-7.B 48890 SEPB 04/28/83C 06/22/83C 08/01/83C 4.25.3 FLOODING DUE TO FAILURE.0F TANKS IX-3 48896 SEPB 04/11/83P 06/16/83C 06/23/83C 07/08/83C l/ REFERS TO INTEGRATED PLANT SAFETY. ASSESSMENT REPORT (NUREG-0821), TABLE 4-1 2/ LICENSEE ANALYSIS OR EVALUATION SUBMITTAL COMMITMENT DATE - WHEN FOLLOWED BY P INDICATES PARTIAL SUBMITTAL, WHEN FOLLOWED BY A C INDICATES COMPLETE SUBMITTAL, AND WHEN FOLLOWED BY A T INDICATES TARGET DATE FOR SUBMITTAL.
1/ STAFF SAFETY EVALUATION REPORT - SCHEDULED OR COMPLETE - COMPLETE WHEN FOLLOWED BY A C i/ ISSUANCE TO LICENSEE OF STAFF SAFETY EVALUATION REPORT - SCHEDULED OR COMPLETE - COMPLETE WHEN FOLLOWED BY,A C 3-4 L
u v
1
-a4 e-4 IPSAR SUPPLEMENT STATUS
^
IB LIC. RESP. REC'D SER INPUT REC'D 8--
g SERISSUED
/ /:([
/
G0AL 6--
p ll l;
'jl
/
/
ll
/
~~
/
/
2--
/
l
/
/
/ /
/
i i
i/ v' i
i i
i i
i i
i i
e i
g DEC JAN FEB MAR APR MAY JUN JUL AUG SEP DCT NOV DEC JAN FEB MAR APR LICRESPREC'D 0
1 1
2 4
5 7
B B
B 1
1 6
7 SER ISSUED 8
8 B
B 1
1-3 4
G0AL 0
0 B
B 0
1 3
8 3-5
I I
OYSTER CREEK ISSUES REQUIRING REFINED ENGINEERING ANALYSIS 00 CONTINUATION OF ONGOING EVALUATION FROM NUREG-0822 i
(FINAL) INTEGRATED PLANT SAFETY ASSESSMENT DATE: JANUARY 1983 IPSAR SEP LICENSEE SER SECTION TOPIC TAC REVIEW SUBMITTAL SER ISSUE NUMBER 1/
TITLE REFERENCE NO.
BRANCH SCHEDULE Z/
IMPUT 1/
DATE 1/
4.1(7)
FLOODING EVALUATION II-3.C 49391 SEPB 04/30/83 06/06/83C 06/23/83C 06/23/83C 4.3.1 WIND AND TORNADO LOADINGS III-2 49392 SEPB 02/02/83P 06/30/83T 07/30/83 08/30/83 4.3.2 02/02/83P 06/30/83T 07/30/83 08/30/83 4.3.3 06/30/83P 06/30/83T 07/30/83 08/30/83 4.3.6 02/02/83P 06/30/83T 07/30/83 08/30/83 4.3.7 02/02/83P 06/30/83T 07/30/83 08/30/83 l
4.4(2)
HYEROSTATIC LOADS (SHORT-DURATION)
III-3.A 49393 SEPB 04/30/83- 06/30/83T 07/30/83 08/30/83 4.6.1 TORNADO MISSILE PROTECTION III-4.A 49394 SEPB 06/30/83T 07/30/83 08/30/83 4.6.2 06/30/83T 07/30/83 08/30/83 4.6.4 06/30/83T 07/30/83 08/30/83 4.7 TURBINE MISSILES III-4.5 49395 SEPB 07/30/83T 08/30/83 09/30/83 i
4.8.2 AIRCRAFT HAZARDS III-4.D 49396 SAB 03/04/83C 04/26/83C 05/03/83C 4.10(2)
EMERGENCY CONDENSER ISOLATION III-5.5 49397 SEPB 06/30/83T 07/30/83 08/30/83 4.11(1)
SEISMIC DESIGN III-6 49398 SEPB 12/31/83T 01/31/84 02/28/84 4.11(2) 12/31/83T 01/31/84 02/28/84 4.11(3) 12/31/83T 01/31/84 02/28/84 4.11(5) 12/31/83T 01/31/84 02/28/84 i
4.12 DESIGN CODES, DESIGN CRITERIA, LOAD COMBINATION III-7.5 49399 SEPB 06/30/83 11/30/83T 12/30/83 01/30/84 4.14(1) THERMAL OVERLOAD BYPASS III-10.A 49400 SEPB 12/31/83T 01/31/84 02/28/84 4.16.1 LEAKAGE DETECTION V-5 49401 SEPB 06/30/83T 07/30/83 08/30/83 4.16.2 12/31/83T 01/31/84 02/28/84
- 4. 17 REACTOR VESSEL INTEGRITY V-6 49402 SEPB 03/10/83C 04/28/83C 04/28/83C 4.19 ISOLATION OF HIGH AND LOW PRESURE SYSTEMS V-11.A 49403 SEPB 06/30/83T 07/30/83 08/30/83 1
i 4.20 WATER PURITY OF PWR PRIMARY COOLANT V-12.A 49404 SEPB 12/31/83T 01/31/84 02/28/84 4.23 EMERGENCY CORE COOLING SYSTEM ACTIVATION VI-7.A.3 49405 SEPB 12/31/83T 01/31/84 02/28/84 4.25(1) AUTOMATIC BUS TRANSFERS VI-7.C.1 49406 SEPB 06/30/83T 07/30/83 08/30/83 4.26.2 REACTOR TRIP SYSTEM (RTS) TESTING VI-12.A 49407 SEPB 12/31/83T 01/31/84 02/28/84 4.27(1) REACTOR PROTECTION SYSTEM ISOLATION VII-1.A 49408 SEPB 07/31/83T 08/31/83 09/30/83 4.31 ONSITE EMERGENCY POWER SYSTEMS (DIESEL GENERATOR)
VIII-2 49409 SEPB 07/15/83 08/15/83 09/15/83 3-6 4
i
OYSTER CREEK (CONT.)
.I IPSAR SEP LICENSEE SER SECTION TOPIC TAC REVIEW SUBMITTAL SER ISSUE NUMBER 1/
TITLE REFERENCE NO.
BRANCH SCHEDULE 2/
INPUT }/
DATE 1/
4.32 DC POWER SYSTEM BUS VOLTAGE MONITORING AND VIII-3.5 49410 SEPB 11/16/82P 08/30/83T-09/30/83 10/30/83 ANNUNCIATION 4.34(3) VENTILATION SYSTEMS IX-5 49411 SEPB 06/30/83T 07/30/83 08/30/83 4.34(4) 12/31/83T 01/31/84 02/28/84 4.36 PRIMARY COOLANT ACTIVITY T.S.
XV-16 49412 SEPB 12/31/83 01/31/84 02/28/84 3
I 4.38 MSIV LEAKAGE XV-19 49413 SEPB 12/31/83 01/31/84 02/28/84 l/ REFERS TO INTEGRATED PLANT SAFETY ASSESSMENT REPORT (NUREG-0822), TABLE 4-1 4
2/ LICENSEE ANALYSIS OR EVALUATION SUBMITTAL COMMITMENT DATE - WHEN FOLLOWED BY P INDICATES PARTIAL SUBMITTAL, WHEN FOLLOWED BY A C INDICATES COMPLETE SUBMITTAL, AND WHEN FOLLOWED BY A T INDICATES TARGET DATE FOR SUBMITTAL.
1/ STAFF SAFETY EVALUATION REPORT - SCHEDULED OR COMPLETE - COMPLETE WHEN FOLLOWED BY A C 1/ ISSUANCE TO LICENSEE OF STAFF SAFETY EVALUATION REPORT - SCHEDULED OR COMPLETE -. COMPLETE WHEN FOLLOWED BY A C l
I
}
b 3-7
IPSAR SUPPLEMENT STATUS
~ 1
~
OYSTER CREEK
20 --
ll SERISSUED ll G0AL 15 --
/
==
- g -
i ll 5--
l
.l
........l i
i i
i i
i i
i' i i
1 e'
i
- t-g DEC JAN FEB HAR APR MAY JUN JUL AUG SEP DCT,NOV. DEC ' JAN : FEB MAR APR 2
,t l.
LIC RESP REC'D 0
0 0
2-2 2
3 4
0 0
0 2
2 3
3 s>
SERISSUED 0
3 0.
0 1
2 3
3
-G0AL' 0
0 0
0" 1
2
'2 2
18 13 14 14 14 14 23 s
4 3-8--
i 3
4
\\.
m.
.k
.A
~
i ISSUES REQUIRING REFINED ENGINEERING ANALYSIS OR CONTINUATION OF GMGOING EVALUATION FROM NUREG-0833 j
(FINAL). INTEGRATED PLANT SAFETY ASSESSMENT DATE: FEBRUARY 1983 IPSAR SEP LICENSEE SER SECTION TOPIC TAC REVIEW SUBMITTAL SER' ISSUE' i
NUMBER 1/
TITLE REFERENCE NO.
BRANCH SCHEDULE 2/
INPUT 1/
DATE 1/-
i I
4.3.2 WIND AND TORNADO LOADING III-2 49363.SEPB 02/09/83C
-08/30/83 08/30/83.
j 4.3.3 11/22/82C 08/30/83-08/30/83 O.3.4 11/22/82C
'08/30/83 08/30/83 1
4.5.3 III-4.A 02/03/83P-10/01/83T 10/01/83 10/30/83 j
4.5.4 02/03/83P 10/01/83T 10/01/83 10/30/83' j
4.6 TURBINE MISSILES III-4.8 49362 MTEB 10/08/82C 05/23/83C 05/31/83C 4.7.1 PIPE BREAK INSIDE CONTAINMENT III-5.A 49364 MEB 4.7.2 11/17/82P 01/10/83C 02/09/83C
.10/39/83 11/17/82C 02/09/83C 10/3u/83 1
4.7.3 11/17/82C 09/30/83 10/30/83 4.7.4 11/17/82P 08/03/83 09/30/83 10/30/83 4.9.2 SEISMIC DESIGN III-6 49365 SEPB.
07/22/83P 10/15/83 10/15/83 l
4.9.3 09/01/83T 4.10 DESIGN CODES, DESIGN CRITERIA, LOAD COMBINATIONS-III-7.8 49361 SEPB 08/02/82C 08/30/83 09/30/83 4.12.1 THERMAL OVERLOADS III-10.A 49366 SEPB 04/29/83 09/01/83T 09/30/83 09/30/83
]~
4.13.1 LEAKAGE DETECTION V-5 49367 SEPB 10/30/83 4.13.2 1
4.18.2 VI-4 10/01/83T 4.21.1 EISC REREVIEWS VI-7.C.1-49368 SEPB 04/29/83 10/01/83T 10/30/83 10/30/83 l
4.21.4 05/30/83 08/01/83T 10/30/83 10/30/83 I
4.31.5 04/29/83 10/01/83T 10/30/83 10/30/83 l
4.23.1 VI-10.8 05/30/83 10/01/83T 10/30/83 10/30/83 4.34.1 REACTOR PROTECTION SYSTEM ISOLATION VII-1.A 49369 SEPB 04/22/83 08/03/83T 09/30/83 09/30/83 4.24.2 05/30/83 08/03/83T 09/30/83 09/30/83' 4.31 PRIMARY COOLANT ACTIVITY T.S.
XV-16 49370 SEPB 06/01/83 09/01/83T 10/01/83 10/01/83 4.32 XV-18 06/01/83 09/01/83T 10/01/83 10/01/83 1/ REFERS TO INTEGRATED PLANT SAFETY ASSESSMENT REPORT (NUREG-0823), TABLE 4-1 l
2/ LICENSEE ANALYSIS OR EVALUATION SUBMITTAL COMMITMENT DATE - WHEN FOLLOWED BY P INDICATES PARTIAL SUBMITTAL, WHEN I
FOLLOWED BY A C INDICATES COMPLETE SUBMITTAL, AND WHEN FOLLOWED BY A T INDICATES TARGET.DATE FOR SUBMITTAL.
i 1/ STAFF SAFETY EVALUATION REPORT - SCHEDULED OR COMPLETE - COMPLETE WHEN FOLLOWED BY A C 1/ ISSUANCE TO LICENSEE OF STAFF SAFETY' EVALUATION REPORT - SCHEDULED OR COMPLETE - COMPLETE WHEN FOLLOWED BY A C I
i t
l 3-9 l
4 r
IPSAR SUPPLEMENT STATUS DRESDEN 2 TACS 12 LIC. ESP. EC'D SER IFJT'EC'D 18 --
l I
SER ISSED
,I B--
l GDAL l
6--
l l
4--
l l
l l
2 l
8 DEC JAN FEB MAR APR MAY JtN JL't ALE SEP DCT NOV DEC JAN FEB MAR APR LIC ESP EC'D 2
2 2
2 2
2 2
2 SER IIFili EC'D 8
8 8
8 8
1 1
1 SER ISSED 8
8 8
8 8
1 1
1 t
G0AL E
8 8
8 8
8 1
1 1
4 18 l
3-18 l
l l
i MILLSTONE 1 ISSUES REQUIRING REFINED ENGINEERING ANALYSIS OR CONTINUATION OF ONGOING EVALUATION FRDM MUREG-0824 (DRAFT). INTEGRATED PLANT SAFETY ASSESSMENT DATE: MOVEMOER 1982 IPSAR SEP LICENSEE SER SECTION TOPIC TAC REVIEW SUBMITTAL SER ISSUE NUMBER 1/
TITLE REFERENCE NO.
BRANCH SCHEDULE 2/
INPUT 2/
DATE 1/
I 4.1.1 INTEGRATED STRUCTURAL ANALYSIS II-3.A,8 49376 SEPB 10/31/83 12/31/83 01/31/84 4.1.7 4.2.1 II-4.F 10/31/83 4.2.2 10/31/83 4.2.3 10/31/83 4.4.1 III-2 10/31/83 i
4.4.2 12/03/82P l
4.4.3 10/31/83 4.4.4 10/31/83 4.4.5 10/31/83 4.4.6 10/31/83 4.5.1 III-3.A 10/31/83 4.5.2 10/31/83 4.6.1 III-3.C 10/31/83 4.11.1 III-6 10/31/83 4.12 III-7.5 10/31/83 3
4.7 MISSILES III-4.A 49377 SEPB 04/30/83 08/30/83T 09/30/83 10/15/83 4
4.8 III-4.B 04/30/83 06/30/83T 4.9.1 PIPE BREAKS III-5.A 49378 MEB 04/15/83C 06/22/83C 06/29/83C 4.9.2 04/15/83C 06/29/83C 4.9.3 04/15/83C 06/29/83C 4.10.2-III-5.5 03/24/83C 06/29/83C 4.16.1 V-5 04/15/83C 06/29/83C 4.11.2 SEISMIC III-6 49379 SEPB 07/31/83C 08/30/83 09/30/83 4.11.6 04/01/83 08/30/83T 4.11.8 06/30/83 4.14 MOV INTERLOCKS III-10.A 49380 SEPB 01/31/83 08/30/83T 09/30/83 10/15/83 i
4.19.1 WATER CHEMISTRY V-12.A 49382 SEPB 06/16/83 07/15/83 07/30/83 I
4.20.3 CONTAINMENT ISOLATION VI-4 49383 SEPB 02/23/83C 07/07/83C 07/07/83C 4.20.7 03/31/83 06/22/83C 4.23.1 FAULT TRANSFERS VI-7.C.1 49384 SEPB 04/12/83P 07/30/83 08/30/83 4.23.2 04/12/83P
+
4.25.1 VII-1.A 01/31/83 06/40/83T 4.28.3 EMERGENCY POWER VIII-2 49387 SEPB 05/10/83P 07/15/83 07/30/83 4.29 VIII-3.A 06/16/83 4.30.1 VIII-3.5 12/27/82P 4.30.2 VIII-3.4 06/16/83 3-11 l
MILLSTONE 1 (CONT.)
IPSAR SEP LICENSEE SER SECTION TOPIC TAC REVIEW SUBMITTAL SER ISSUE HUMBER l/
TITLE REFERENCE NO.
BRANCH SCHEDULE 2/
INPUT 1/
DATE 1/
4.32.1 VENTILATIDW SYbfEMS IX-5 49389 SEPB 04/18/83C 06/23/83'C 07/05/83C 4.32.2 04/18/83C 07/85/43C 4.32.3 04/18/83C 07/05/83C 4.32.4 VI-7.A.3 04/18/83C 07/05/83C 4.21.1 87/45/83C 4.35 ACTIVITY LIMITS XV-16 49390 SEPB 06/16/83 07/15/83 87/30/83 4.36 XV-18 06/16/83 4.1.1 FLOODING (NON-STRUCTURAL)
II-3.A',B 49780 SEPB 01/31/83 09/30/83T 10/30/83 11/30/83 1/ REFERS TO INTEGRATED PLANT SAFETY ASSESSMENT REPORT (NUREG-0824), TABLE 4-1 Z/ LICENSEE ANALYSIS CR EVALUATION SUBMITTAL COMMITMENT DATE - WHEN FOLLOHED BY P INDICATES PARTIAL SUBMITTAL, WHEN FOLLOWED BY A C INDICATES COMPLETE SUBMITTAL, AND WHEN FOLLOWED BY A T INDICATES TARGET DATE FOR SUBMITTAL.
1/ STAFF SAFETY EVALUATION REPORT - SCHEDULED OR COMPLETE - CCMPLETE WHEN FOLLOWED BY A C
'4/
ISSUANCE TO LICENSEE OF STAFF SAFETY EVALUATION REPORT - SCHEDULED OR COMPLETE - COMPLETE WHEN FOLL&JED BY A C l
i l
i 3-12
IPSAR SUPPLEMENT STATUS HILLSTONE 1 TACS 14 LIC. ESP. EC'_D 12 --
,/
GDAL 8--
,/
p 6--
l'
,a' l
4-l 4
/+F 2--
r-'
jl B
DEC JAN FEB MAR APR MAY JLN J!A. AUG SEP DCT NDV DEC JAN FEB MAR APR LIC RESP EC'D 8
B B
B 2
2 3
3 SER INPUT EC'D B
B B
B B
B 2
3 SERISSUED 8
8 8
8 8
8 1
3 GDAL 9
8 8
8 8
8 1
5 7
8 18 11 11 11 12 3-13
- - ~._
YANKEE.
ISSUES REOUIRING REFINED ENGINEERI 3 ANALYSIS OR CONTINUATION OF ONGOING EVALUATION FROM NURE3-0825 (FINAL) INTEGRATED PLANT SAFETY ASSESSMENT DATEt JUNE 1983 IPSAR SEP LICENSEE SER SECTION TOPIC TAC REVIEW SUBMITTAL SER ISSUE MUMBER 1/
TITLE REFERENCE NO.. BRANCH SCHEDULE Z/
INPUT 1/
DATE 1/
4.1 NYDROLOGIC ISSUES II-3.8 51885 SEPB 01/30/84 02/07/84 4.2 II-3.5.1 4.6 II-3.C 01/01/84 4.7 II-4.E III-3.A III-3.C 11/01/83 4.4 CLASSIFICATION OF STRUCTURES, COMPCAENTS, AND III-1 51806 SEPB 06/01/84 07/01/84 07/01/84 SYSTEMS 4.5 INTEGRATED STRUCTURAL ANALYSIS III-2 51807 SEPB 01/01/84 06/30/84 07/07/84 4.8 III-4.A 01/01/84 4.11 III-6 08/01/83 4.12 III-7.B 4.9 PIPE BREAK EFFECTS ISSUE 5 III-5.A 51898 SEPB 06/01/84 06/30/84 07/07/84 4.10 III-5.3 06/01/84 4.16 V-5 96/01/84 4.35 XV-19 01/01/84 l
4.21 WATER CHEMISTRY ISSUES VI-1 51809 SEPB 09/01/34 10/01/84 10/07/84 4.14 ELECTRICAL AMD INTERLOCK ISSUES III-10.A 51810 SEPB 1984 REFUELING OUTAGE 05/30/84 05/30/84 4.19 V-10.8 4.20 V-11.8 4.24 VII-3 4.27 V-11.A 1
4.28 V-10.A 01/01/84 i
i 4.29 VIII-1.A VIII-3.5 VIII-4 01/01/84 4.22 CONTAINMENT ISSUES VI-4 51811 SEPB 03/16/83C 07/30/83 07/30/83 4.31 VENTILATION ISSUES IX-5 51812 SEPB 1984 REFUELING OUTAGE 05/30/84 05/30/84 1/ REFERS TO INTEGRATED PLANT SAFETY ASSESSMENT REPORT (NUREG-0825), TABLE 4-1 i
2/ LICENSEE ANALYSIS OR EVALUATION SUBMITTAL COMMITMENT'DATE - WHEN FOLLOMED BY P INDICATES PARTIAL SUBMITTAL, WHEN l
FOLLOWED SY A C INDICATES COMPLETE SUBMITTAL, AND WHEN FOLLOWED BY A T INDICATES TARGET DATE FOR SUBMITTAL.
i 1/ STAFF SAFETY EVALUATION REPORT - SCHEDULED OR COMPLETE - COMPLETE WHEN FOLLOWED BY A C 1/ ISSUANCE TO LICENSEE OF STAFF SAFETY EVALUATION REPORT - SCHEDULdD OR COMPLETE - COMPLETE WHEN FOLLOWED BY A C l
i 3-14 i
IPSAR SUPPLEMENT STATUS YANKEE TACS 18 LIC. ESP. EC'D SER I H T E C'D 8--
SER ISSED l
GOAL 6--
,/
,o l
4--
a' l
2--
,o l
a n
i i
L' i
i i
i i
i i
i g,
SEP OCT NOV DEC JAN FEB MAR APR MAY JIM JUL AUG SEP OCT NOV DEC JAN LIC RESP REC'D SER IHT EC'D SERISSUED G0AL 8
8 8
8 8
1 1
1 1
3 4
4 7
7 8
3-15
HADDAM HECK ISSUES REQUIRING REFINED ENGINEERIN3 ANALYSIS OR CONTINUATICH OF ONGOING EVALUATION FROM MURE2-0826 (FINAL) INTEGRATED PLANT SAFETY ASSESSMTNT DATEt JUNE 1983 IPSAR SEP LICENSEE SER SECTION TOPIC TAC REVIEW SUBMITTAL SER ISSUE NUMBER 1/
TITLE REFERENCE NO.
BRANCH SCHEDULE Z/
INPUT 1/
DATE 1/
4.1.2 FLOODING EVALUATION II-3.B.1 51930 SEPB 07/31/83 09/30/83 10/15/83 4.1.4 II-3.8.1 09/30/82P 4.1.5 II-3.C 07/31/83 4.5 III-3.C 08/31/83 4.1.1 INTEGRATED STRUCTURAL ANALYSIS II-3.5 51939 SEPB 05/31/84 06/20/84 06/30/84 4.3.1 III-2 11/30/83 4.3.2 11/30/83 4.3.3 05/31/84 7
4.3.4 05/31/84 4.4 III-3.A 08/31/84 4.11.1 05/31/84 4.11.2 III-7.5 05/31/84 4.11.3 05/31/84 4.3.2 MISSILES III-2 51938 SEPB 11/30/E3 12/31/83 01/15/84 4.6 11/30/83 4.8 PIPE BREAKS III-5.A 51936 SEPB 08/31/83 09/30/83 10/15/83 4.9 III-5.8 07/31/83 4.16.1 V-5 08/31/83 4.10.1 SEISMIC III-6 51937 SEPB 10/31/83 49/30/83 10/15/83 4.10.2 06/30/83 4.10.3 06/30/83 4.10.4 06/30/83 j
4.10.6 08/31/83
]
4.22.3 CONTAINMENT ISOLATIDH SYSTEM VI-4 51935 SEPB 08/31/83 09/30/83 10/15/83 4.22.4 08/31/83 i
4.22.5 08/31/83 1
4.24.1 ONSITE STANDBY A.C. POWER SYSTEM VI-7.C.1 51934 SEPB 05/31/84 06/20/84 06/30/84 4.26 RPS ISOLATION VII-1.A 51933 SEPB 07/31/83 08/31/83 09/15/83 4.32.4 SERVICE WATER SYSTEM IX-3 51932 SEPB 09/30/83 10/30/83 11/15/83 IX-5 51931 SEPE 07/31/83 09/30/83 10/15/83 4.33.1 VENTILATIDH SYSTEMS x
4.33.2 07/31/83 4.33.5 08/31/83 l1/ REFERS TO INTEGRATED PLANT SAFETY ASSESSMENT REPORT (HUREG-0522), TABLE 4-1 Z/ LICENSEE ANALYSIS OR EVALUATION SUBMITTAL COMMITMENT DATE - WHEN FOLLOWED BY P INDICATES PART r4L SUBMITTAL, WHEN FOLLOWED BY A C INDICATES COMPLETE SUBMITTAL, AND WHEN FOLLOWED BY A T INDICATES TARGET DATE FOR SUBMITTAL.
1/ STAFF SAFETY EVALUATION REPORT - SCHEDULED OR COMPLETE - COMPLETE WilEN FOLLCWED BY A C 1/ ISSUANCE TO LICENSEE OF STAFF SAFETY EVALUATION REPORT - SCHEDULED CR COMPLETE - COMPLETE WHEN FOLLOWED BY A C l
3-16
IPSAR SUPPLEMENT STATUS HADDAM NECK IACS 12 LIC. RESP. EC'D SER INPUT REC'D 18 --
I SERISSUED
/
g--
GDAL 6--
r' t
l l
l 4--
l l
l l
2--
ll l
l l
l l
l l
l DEC JAN FEB MAR APR MAY J' N Jtt AUG SEP OCT NDV DEC JAN FEB MAR APR J
LIC RESP REC'D SER INPUT REC'O SER ISSUED CDAL 8
1 6
7 7
8 8
8 8 ; 18 3-17 W
ISSUES REQUIRING REFINED ENGINEERING ANALYSIS OR CONTINUATION OF ONIDING EVALUATION FROM NUREG-082 LACROSSE (FINAL) INTEGRATED PLANT SAFETY ASSESSMENT DATE: JULY 1083 l
SEP LICENSEE SER IPSAR TOPIC TAC REVIEW SUBMITTAL SER ISSUE SECTIDH REFERENCE NO.
BRANCH SCHEDULE 2/
INPUT 1/
DATE 1/
NUMBER 1/
TITLE III-2 51867 SEP8 01/01/84 01/31/84 01/31/84 4.6 WIND AND TORNADO LOADINGS l
4.7.1 EFFECTS OF MIGN WATER LEVEL ON STRUCTURES III-3.A Sf868 SEPB 02/14/83 12/30/83 10/01/83 11/30/83 4.7.2 III-4.A 51869 SEPB 01/01/84 01/34/84 01/31/84 1
4.9 TORNADO MISSILES III-4.8 51870 MTER 11/01/83 12/30/83 01/31/84 I
i 4.10 TURBINE MISSILES 01/31/84
(
i III-5.A 51871 MER 61/01/44 01/25/84 Of/3f/84 l
PIPE BREAK INSIDE CONTAINMENT 4.11 III-5.5 51872 MER 11/01/83 12/30/83 01/31/84 l
l l
4.12 PIPE BREAK OUTSIDE CONTAINMENT III-6 51873 SEPB 01/01/84-01/31/84 01/31/A4 l
l 4.13 SEISMIC DESIGN CONSIDERATIONS l
4.14 DESIGN CODES, DESIGN CRITERIA AND LOADS III-7.5 58874 SEPR 81/01/84 01/31/84 01/31/84 COMBINATIONS VI-4 51875 AEB 01/01/84 01/25/84 01/31/84 4.21.1.4 SC ATMOSPNERIC VENT VI-7.C.f 51876 SEP8 09/01/83 10/30/83 11/30/83 4.24.1
-APPENDIX K - ELECTRICAL REREVIEWS VII-1.A 51877 SEPR 81/01/84 '
O f/3 f/84 4.26.1 ISOLATION OF RPS 10/01/83 01/31/84 4.26.3 VIII-3.5 51878 SEPP 09/01/83 10/30/83 11/30/83 4.28 DC BUS VOLTAGE MONITORING IX-5 51879 SEPR 101/01/84 01/31/84 01/31/84 4.29.1.2 VENTILATION SYSTEMS 01/01/84 4.29.3 TABLE 4-1 REFERS TO INTEGRATED PLANT SAFETY ASSESSMENT REPORT (NUREG-0827).
J/
LICENSEE ANALYSIS OR EVALUATION SUBMITTAL COMMITMENT DATE - WHEN FOLLOWED BY P INDICATES PARTIAL SUBMITTAL, WHEN FOLLOWED BY A C INDICATES COMPLETE SUBMITTAL, AND WHEN FOLLOWED BY A T INDICATES TARGET DATE FOR SUBMITTAL.
Z/
STAFF SAFETY EVALUATION REPORT - SCHEDULED OR COMPLETE - COMPLETE WHEN FOLLOWED BY A C
}/
ISSUANCE TO LICENSEE OF STAFF SAFETY EVALUATION REPORT - SCHEDULED OR COMPLETE - CDMPLETE WHE 1/
3-18
IPSAR SUPPLEMENT STATUS LACROSSE TACS 14 LIC. ESP. EC'D
~~
E C
12 --
SERISSUED 18 --
l l
GOAL B--
l l
6-l 4--
l'
,o o'
2--
,a' i
L' I
I I
I I
I I
I i
l I
I I
g SEP OCT NOV DEC JAN FEB MAR APR MAY JIM Jll AUG SEP OCT NOV DEC JAN LIC ESP EC'D SER I!PUI EC'D SER ISSED GOAL 8
8 8
2 3
13 3-19
..... an
==2 e,nc.,
im. mo.,
RC Pomu M U.S. seUCLEAR ReeULATORY Cinessme0N
- 1. REPORT NUMSE R MamperWtr DOCI BISLIOGRAPHIC DATA SHEET NUREG-0485 Vol.5. No.7 4 71TLE AND SugTITLE Mais vakane Na, er pprepness a
2, fgee, pie.;
Systematic Evaluation Progran Status Summary Report
- a. RECiriENT'S ACCE8510N NO.
- 7. AUTHORLSI S. D ATE REPORT COMPLETED August l1983 M oN TM YEAR
- 9. PERFORMING ORGANIZATION NAME AND MAILING ADORESS (fache le Caes DATE REPORT ISSUED Office of Resource Management Office of Nuclear Reactor Regulation Auaust
'1583 U.S. Nuclear Regulatory' Commission Washington, D.C.
20555
- 2. ft,,,,..,
- 12. SPON8ORING ORGANIZATION AND MAILING ADORESS Itachair le Cearf 0 PROJECT' TASK / work UNIT NO Office of Resource Management Office of Nuclear Reactor Regulation
- 15. CONTRACT NO.
U.S. Nuclear Regulatory Conunission Washington, D.C.
20555 tv8E OF REPORT Ps mion cove nto trachsive seest July 1-31, 1983
- 15. SUPPLEMENTARY NOTES 14 (Le.re osav4J
- 14. ABSTR ACT 200 words'or Aess)
The Systematic Evaluation Program is intended to examine many safety-related aspects of 11 of the older 1.isht water reactors. This dccument provides the existing status of the review process including individual topic and overall completion status.
- 17. KEY WORDS AND DOCUMENT ANALYSIS 17a. DESCRIPTORS 17b. IDENTIFIERS /OPEN-ENDED TERMS l
l
- 18. AVAILAstLITY STATEMENT
- 19. SE CURITY CLASS (74 s soporrt 21.NO OF PAGES Unlimited Haela N zg"iTv, Ctg 5 tra,s, s
22 PRICE N.c..
l l
~
UNITE i STATE.:
, inst ciass mast NUCLEAR REGULATORY COMMISSION
'05f! G{S,'E E S P-'O
' WASHINGTON. D.C. 20555 easw a c esmust n. cn
- orriciAt susiNEss PENALTV FOR PRIVATE Ust. SK4 G
S 6
h ce 1/^555i'7mA77 1 I n t I N 51 x A lc o l l 'a NLC ACM-PIV ff TIPC PCL1LY E PtJ P PCI Rh-pnu y j p r (;
k ' !' 1 WA5HINGTLN CC 25 i
O 4
O c3 0
9 4
e 4
I
.