e 4
Jt)L 29 N Docket No.
99900503/83-02 Burns and Roe, Incorporated ATTN:
Mr. K. Keith Roe Executive Vice President 550 Kinderkamack Road Oradell, NJ 07649 Gentlemen:
This refers to the inspection conducted by Mr. P. M. Sears of this office on June 6-10, 1983, of your facility at Oradell, New Jersey, and to the discussions of our findings with Mr. J. DeLooper and members of your staff at the conclusion of the inspection.
l This inspection included a review of the following Burns & Roe 10 CFR Part 21 reports:
(1) concerning errors in the ADLPIPE computer code, and (2) design problems associated with the remote shutdown panel for Washington Nuclear Plant-2.
Areas examined during this inspection and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.
During this inspection it was found that you failed to meet certain commitments in your Topical Report No. B&R0E-COM4-1-NP-2A.
The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.
Please provide us within 30 days from the date of this letter a written statement containing:
(1) a description of steps that have been or will be taken to correct these items; (2) a description of steps that have been or will be taken to prevent recurrence; and (3) the dates your corrective actions and preventive measures were or will be completed.
Consideration may be given to extending your response time for good cause shown.
The response requested by this letter is not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
i SC:RSSN BC: P8 D:
PMSears/1k CJHa e UPo povs RLBangart 7/13/83 7
83 7
83 7/
83 8308160349 830729 lA PDR GA999 EECBURO j
99900503 PDR
l
..6 Burns and Roe, Incorporated In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
If this report contains any information that you believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephon2 within 10 days from the date of this letter of your intention to file a request for withholding; and (b) submit within 25 days from the date of this letter a written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than 7 days are available for your review, please notify this office promptly so that a new due date may be established.
Consistent with Section 2.790(b)(1), any such application must be accompanied by an affidavit executed by the owner of the information which identifies the document or part sought to be withheld, and which contains a full statement of the reasons on the basis which it is claimed that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4).
The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit.
If we do not hear from you in this regard within the specified periods noted above, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely, Original Sicnod By:;
Uldia Potapoya Uldis Potapovs, Chief Vendor Program Branch
Enclosures:
1.
Appendix A - Notice of Nonconformance 2.
Appendix B - Inspection Report No. 99900503/83-02 3.
Appendix C - Inspection Data Sheets (5 pages) bcc:
JTCollins, RIV RLBangart, RIV JEGagliardo, RIV EHJohnson, RIV MIS Section (J. Perry)
VPB Branch Chief VPB Section Chiefs VPB Inspector DMB-IE: 09 ASME NBB&PVI