Interim Deficiency Rept DER 83-42 Re Inability of RCS Thermowells to Maintain Pressure Boundary.Initially Reported on 830629.Bechtel/C-E Evaluation Continuing.Final Rept Will Be Submitted by 830921
ML20024D557
Person / Time
Site: Palo Verde 
Issue date: 07/25/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-27398-BSK, DER-83-42, NUDOCS 8308050247
Download: ML20024D557 (3)


Text

-

)

f..if, fu

~

D /!/S Arizona Public Service Co.mpany y (([

P o. Box 21666 PHOENIX. ARIZONA 85036

, Sc

'YNr July 25, 1983 ANPP-27398-BSK/RQT U. S. Nuclear Regulatory Commission h

Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. D. M. Sternberg, Chie f Reactor Projects Branch 1

Subject:

Interim Report - DER 83-42 A 50.55(e) Potent ially Reportable Deficiency Relating to Thermowells in Rtactor Coolant System File: 83-019-026; D.4.33.2

Reference:

Telephone Conversation between P. Johnson and J. Roedel on June 29, 1983

Dear Sir:

The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days.

Due to the extensive investigation and evaluation required, an Interim Report is attached.

It is now expected that this information will be finalized by September 21, 1983, at which time a complete report will be submitted.

Very truly yours,

}

7. E nd %

cett l

E. E. Van Brunt, Jr.

APS Vice President, Nuclear Projects Management ANPP Project Director EEVBJr./RQT:rb l

Enclosure cc:

See Page Two l.

I 6

![

9300050247 830725 PDR ADOCK 05000528 PDR f f-) /,

L S

. U. S. Nuclear Regulatory Commission Page Two ec: Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

G. C. Andognini J. A. Roedel D. B. Fasnacht A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. R..Bynum P. P. Klute/D. D. Green A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiore11i S. R. Frost J. Self Records Center Institute of Nuclear Power Operations

'1100 circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339 l

i l

l l

t I

L

s

-INTERIM REPORT '- DER 83 POTENTIAL REPORTABLE DEFICIENCY-ARIZONA PUBLIC SERVICE COMPANY (APS)

PVNGS UNIT 1 1.

Potential Problem During hot functional testing, it was discovered that thermowells 01JRCA-TW-122CA and 01JRCC-TW-112CC were not maintaining the pressure boundary in the Reactor Coolant System and were emitting steam through their respective temperature elements, tag numbers 01JRCA-TE-122CA and 01JRCC-TE-112CC. Preliminary investigation reveals penetration cracks on the thermowells. internal wall surface. Some damage to temperature elements was also observed.

II.

Approach To and Status of Proposed Resolution-Bechtel engineering is corresponding with C-E to provide reportability disposition and technical justification for corrective action.

III. Projected Completion of Corrective Action and Submittal of the Final Report Evaluation of this condition and submittal of the Final Report is forecast to be completed by September 21, 1983.

f f

l l-i 1

i

.