Procedures Generation Package.
ML20024D468
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 07/29/1983
From:
ALABAMA POWER CO.
To:
Shared Package
ML20024D461 List:
References
RTR-NUREG-0737, RTR-NUREG-737 PROC-830729, NUDOCS 8308050063
Download: ML20024D468 (41)


Text

a e #

e PROCEDURES GENERATION PACKAGE ALABAMA POWER COMPANY FARLEY NUCLEAR PLANT 8308050063 830729 PDR ADOCK 05000348 F PDR J

2 i 1. INTRODUCTION 1.1 PURPOSE The purpose of this Procedures Generation Package (PGP) is to describe the emergency response procedures (ERPs) development for the Alabama Power Company Farley Nuclear Plants Unit 1 and Unit 2.

Both units are 3 loop Westinghouse pressurized water reactors.

1.2 SCOPE This document was developed in response tb Supplement 1 to NUREG-0737, Item 7.2b, page 15.

1.3 ORGANIZATION This document consists of the following six parts:

" Introduction

" Plant-Specific Technical Guidelines

" Writers Guide for ERPs

'ERP Verification Program

  • ERP Validation Program
  • ERP Training Program Each part describes the approach taken as part of the overall ERP Implementation Plan for the Farley Nuclear Plant, Units 1 and 2.
2. PLANT-SPECIFIC TECHNICAL GUIDELINES 2.1 GENERAL The following program for converting the Westinghouse Emergency Response Guidelines (ERGS) into ERP's has been developed and will be used by the Farley Nuclear Plant, Units 1 and 2.

The ERGS, Basic Revision, dated September 1, 1981 will be used for the initially implemented ERP's. Subsequent revisions will be incorporated using the established revision, review, and approval process per FNP-0-AP-1 (Development, Review and Approval of Plant Procedures).

The following major items were considered in the methodology to be used.

" mechanics of conversion Page 1 of 9

  • location of the plant-specific technical information
  • how the plant-specific technical information will be used
  • the use of old E0Ps
  • documentation requirements use of the background information supplied with technical guidelines 2.2 PROGRAM DESCRIPTION 2.2.1 Mechanics of Conversion 2.2.1.1 Preparation The designated ERP writing team will obtain and review the following plant-specific technical information (ERP source documents):

l i

  • Westinghouse Emergency Response Guidelines (ERGS) with background information
  • FSAR Units 1 & 2 i
  • Farley Nuclear Plant Writers Guide for Emergency Operating Procedures.

i l

  • Technical Specifications for Units 1 & 2
  • the most current revision of existing E0Ps as-built plant drawings 2.2.1.2 Writing ERPs The ERP writing team will follow the ERGS step-by-step, adding footnoted information where designated. Concurrently, the writers will review appropriate ERP source documents.

! As each step is reviewed decisions will be made regarding its applicability to the Farley Nuclear Plant. If appropriate, corresponding ERP steps will be determined. Once reviewed a disposition will be determined to delete the step, alter the step sequence, alter the step, supply additional steps or adopt the step unchanged.

This review and disposition process will be documented on Figure 1. If the step requires no changes other than basic format adjustments to comply with the writers guide formating requirements, no further documentation will be Page 2 of 9-l

required. If changes are necessary, a step-change documentation sheet Figure 2 will be completed to document and justify the change.

The justification section will provide plant-specific technical information or analysis to assist in the verification process.

2.2.2 Documentation The completed Figures 1 and 2 will be provided as source documents to assist in the ERP verification process and in the revision, review, and approval process.

Pcge 3 of 9

3. WRITERS GUIDE FOR ERPs 3.1 GENERAL A writers guide for ERPs is a plant-specific document that pro-vides instructions on writing ERPs, using good writing principles.

In addition to establishing sound writing principles, the guide helps to promote consistency among all ERPs and their revisions, independent of the number of ERP writers.

The writers guide will be revised, as necessary, based on feed-back from operator training, experience, and validation.

3.2 DOCUMENT DESCRIPTION Information on the following major items is included in.the plant-specific writers guide for ERPs:

'ERP format

'ERP organization

'ERP level of detail

'ERP content

' mechanics of style The Farley Nuclear Plant Writers Guide for Emergency Response Procedures (FNP-0-AP-74 Attachment 1) is based on the industry document Emergency Operating Procedures Writing Guideline (INPO 82-017), developed by the Emergency Operating Procedures Implementation Assistance (EOPIA) Review Group and published by INPO. The writers guide is provided as Attachment 1.

4. ERP VERIFICATION PROGRAM 4.1 GENERAL ERP verification is the evaluation performed to confirm the written correctness of the procedure and to ensure that applicable generic and plant-specific technical information has been incorporated properly. This evaluation also checks that the human factors aspects presented in the writers guide for ERPs have been applied.

4.2 PROGRAM DESCRIPTION When developing this ERP verification program, the following major items were considered:

'how ERP verification will be performed

'how completion of the ERP verification process will be documented Page 4 of 9

.h ...m. _ . _ . . . & m .w. -c.. u a . , _ . _

3 4

i

  • w hat process will be used in resolving discrepancies The verification program will be based on the industry document Emergency Operating Procedures Verification Guideline (INP0 83-004), developed by the E0 PIA Review Group and published by INPO.

The Farley Nuclear Plant Verification Procedure for Emergency Response Procedures, will address the following objectives:

  • ERPs are technically correct, i.e., they accurately reflect the technical guidelines and other ERP source documents.
  • ERPs are written correctly, i.e., they accurately reflect the plant-specific writers guide.

'The language and level of information presented in the ERPs are compatible with the qualifications, training, and experience of the operating staff.

' Correspondence exists between the procedures and the control room / plant hardware.
5. ERP VALIDATION PROGRAM 5.1 GENERAL i ERP validation is the evaluation performed to determine that the actions specified'in the procedure can be performed by the
operator to manage the emergency conditions effectively. The

, methodology for ERP validation utilizes present, available 4 methods at the Farley Nuclear Plant while recognizing and allowing

} for future improvements. It will validate that part of the ERP

! not covered by any technical validation of generic technical guidelines.

5.2 PROGRAM DESCRIPTION

} When developing this ERP validation program, the following major j items will be considered:

'how ERP validation will be performed

'how to appropriately use simulators, walk-throughs, or table-top methods of validation

'how operating and training experience will be integrated into the program evaluation

  • the evaluation criteria to be applied and the methods to be followed in resolving discrepancies
  • how completion of the ERP validation process will be
documented.

i

Page 5 of 9 1

_ _ _ _ _ , ._ . _ . _ ..~ _ ._ .._ .. ..._ -. ___. .. _ ,_ ._ _ _ _ _ __._.__. _ . . _ . _ , . _ .-.__.

The program will be based on the industry document Emergency Operating Procedures Validation Guideline (INPO 83-006), developed by the E0 PIA Review Group and published by INPO. The Farley Nuclear Plant Validation Procedure for Emergency Response Procedures will address the following objectives:

'ERPs are usable, i.e., they can be understood and followed without confusion, delays, and errors.

"A correspondence exists between the procedures and the control room / plant hardware.

"The instructions presented in the ERPs are compatible with the shift manpower, qualifications, training, and experience of the operating staff.

'A high level of assurance exists that the procedures will work, i.e., the procedures guide the operator in mitigating transients and accidents.

6. ERP TRAINING PROGRAM 6.1 GENERAL The ERP training will be developed to support implementation of the ERPs. The ERP writer will interface with the Training Department to ensure a supportive program.

6.2 PROGRAM DESCRIPTION When developing the ERP training program, the following major items will be considered:

'what type of operator training should be provided (initial, refresher) l 'what method of operator training should be followed

'what operator knowledge and skill level is desired "what procedure tasks exist that require operator decision-making l 'what training material is needed to support E0P training requirements "what current operator licensing requirements exist j

'what method should be provided for operator feedback I into the training program and ERP development

[ 'what will be the effect on current plant operation j while training operators on ERPs not yet in place at l the plant l

Page 6 of 9 I

l This description outlines the approach to be used to train licensed operators on ERPs and to ensure that operators will be informed and knowledgeable of future changes to the ERPs.

6.3 TRAINING PROGRAM GOALS The initial, overall training goals for the ERP training program are as follows:

'to enable the operators to understand the structure of the ERPs i

! *to enable the operators to understand the technical bases l

of the ERPs

  • to enable the operators to have a working knowledge of the technical content of the ERPs

'to enable the operators to use the ERPs under emergency conditions Training prcgram objectives to support these goals will be developed for each lesson plan.

6.4 INITIAL ERP TRAINING METHODS The ERP training program will be established to instruct operators in the ERPs. Initial Training for License candidates will consist of classroom instruction, control room walk-throughs, and simulator exercises. Training for Licensed Operators will consist of classroom instruction and plant specific simulator exercises.

6.4.1 Classroom Instruction Classroom instruction sessions will be conducted. The information presented during this method will include the following:

  • the logic behind the development of ERPs

'the process used to develop the ERPs

'the ERPs themselves, including supporting technical and human-factors information 6.4.2 Control Room Walk-Throughs An important part of the instruction on ERPs will be the practical experience gained through control room walk-throughs or simulator exercises. During this method of training, the team approach to using ERPs will be used. This walk-through training will also concentrate on information flow and interactions of the operators in the control room.

Page 7 of 9

a 6.4.3 Simulator Exercises Training on the ERPs will be conducted for all licensed operators using scenarios on a control room simulator.

The scenarios will be reviewed for applicability on the present generic simulator being used. Training will be conducted with all operators performing their normal control room functions. Additional training will be conducted where the members of a crew alternate responsi-bilities. This additional training is important to promote understanding of the other operators' responsibilities in the overall conduct of the actions, and it should lead to enhanced communications within the control room.

Until the plant-specific simulator is completed, complicated scenarios will be discussed during classroom instruction and control room walk-throughs.

6.5 REFRESHER TRAINING All licensed operators will conduct control room walk-throughs using the ERPs during refresher training. The walk-throughs will be conducted either in the control room or on the plant-specific simulator. Realistic scenarios, to the extent determined by Farley simulator capabilities, will be developed to ensure that the critical aspects of the ERPs are exercised.

Training on ERPs will be conducted in such a manner that each crew conducts the walk-throughs with each operator simulating the actions that he normally would be responsible for during an emergency incident. Licensed operators not assigned to a shift will participate in the walk-throughs as part of the training program.

The plant training and operations staffs will participate in the development and execution of refresher training. The training staff is responsible for developing the scenarios, observing and evaluating the walk-throughs, and critiquing the results. Any additional training needs will be determined from the performance of the operators.

The scenarios will be varied sufficiently to ensure the operators do not develop a set pattern of responses to incidents but are able to respond to the symptoms as they develop.

6.6 TRAINING ON REVISIONS Training on important minor procedure revisions will be conducted through a program of pre shif t briefings or required readings (self-taught), or lectures in the requalification program. Training on major revisions will be conducted by the use of classroom instruction and walk-throughs in the control room or on the plant-specific simulator. If operat ~ onal considerations do not allow control room walk-throughs, and the plant-specific simulator is not available, training on major revisions will be conducted l during classroom instruction.

Page 8 of 9

! 6.7 INPUTS INTO TRAINING PROGRAM CHANGES

6.7.1 Supporting Training Material Changes
Changes to supporting training material will be factored into updated lesson plans and operator memos. Some of

! the supporting material identified to date is as follows:  ;

I

  • ERGS I
  • background information i

i associated WCAPs

(

I 6.7.2 Operator Feedback Operator feedback resulting from ERP verification, ERP i validations, and training critique forms will be used to keep the training program and ERPs current and relevant. ,

i 6.8 EVALUATION An evaluation will be used to ensure that the training program goals have been accomplished.

i 0

4 i  !

I i

i Page 9 of 9

_- . . _ . _ . _ _ . . _ . . . _ _ _ , _ . _ _ _ . . _ _ . - _ ~ . . , _ - _ . _ _ _ , . . . . . _ . . . _ _ _ _ . . ~ . . .

! . 6

! FIGURE 1 ERG REVIEW / DISPOSITION SHEET , ,

ERG SILP REVIEW i ERG STEP DISPOSITION ERG ERP IS FUNCTION DOES STEP COMPLY IS STEP 5EQUENCE ADDITIONAL STEPS SIEP NOT STEP SEQUENCE STEP ADDITIONAL STEP STEP CHANGE REMARKS STEP STEP OF STEP WITH FNP DESIGN APPROPRIATE'TO REQ'D. TO COMPLT REQ'D. CHANGE REQ'D. ALTER STEPS ADEQ DOCDfENTATION REQ'D. AT AND WRITERS FNP DESIGN WITH FNP DESIGN (DEI.ETE REQ'D. REQ'D. AS IS SHEET IF STEP FNP GUIDE STEP) NnT ADEQUATE i -__ . . _ _ - . _ _ . _ .

AS IS YES NO YES NO TES NO YES NO i

I '

m t N

o C

W tus i

6 l

1

~

l! mx ERP Rev.

o .

Page of Basis Guideline ERG Rev.

1

~

VOI. ME 1 FNP-0-AP-74 ERP REV.

Sheet of STEP CHANGE DOCUMENTATION ERP STEP:

ERG STEP:

JUSTIFICATION OF DIFFERENCES:

ERP WRITER DATE FIGURE 2 REV. 0

FNP-0-AP-74 ATTACHMENT I (TO PROCEDURES GENERATION PACKAGE)

FARLEY NUCLEAR PLANT EMERGENCY RESPONSE PROCEDURES WRITER'S GUIDE l

l l

FNP-0-AP-74 ATTACHMENT 1 EMERGENCY RESPONSE PROCEDURES WRITER'S GUIDE 1.0 Pu rpose 1.1 General The purpose of this Writer's Guide is to provide guidance in writing Emergency Response Procedures.

1.2 Scope.

This guide provides information for use in the preparation of Emergency Response Procedures (ERP's) to ensure their " UTILITY."

Utility being defined as that property of a procedure which measures its usefulness to the operator. Utility includes such subjects as a procedures completeness, readability, convenience, accuracy, etc.

This guideline is not intended to provide Technical information or bases for the ERPs. It does however, provide the mechanism to convert the applicable Technical data into finalized procedures.

1.3 Applicability This guideline is applicable to FNP Unit 1 and Unit 2 Emergency Response Procedures.

2.0 References 2.1 Emergency Operating Procedures Writing Guideline, INPO 82-017.

2.2 NUREG-0899, Guidelines for the preparation of Emergency Operating Procedures.

2.3 NRC Staff recommendations on the requirements for Emergency Response Capability, March 10, 1982.

2.4 NUREG-0737, Clarification of TMI Action Plan Requirements.

2.5 INPO 82-016, Emergency Operating Procedures Implementation Guideline.

2.6 Westinghouse Owners Group Emergency Response Guideline Volumes I, IIA, IIB, and III.

3.0 ERP Administrative Control 3.1 Title Page Each ERP will be prefaced by a title page. The title page will provide information regarding the procedure number / unit, title, current revision number, date of the revision approval and Page 1 of 14 REV. 0

FNP-0-AP-74 approval status. The list of effective pages may be presented on the title page or may be presented on a separate page following the title page.

3.2 Procedure Designation The Emergency Response Procedures will consist of two major categories, event related optimal recovery procedures and function related procedures. The optimal recovery procedures (ORPs) will be comprised of three series:

' Nominal Emergency / Upset Response (EEP-Series)

  • Emergency Contigency Action (ECP-Series)

The function related procedures will be comprised of two series:

' Critical Safety Function Status Trees (CSF-Series)

  • Function Restoration Procedures (FRP-Series) 3.3 Procedure Numbering Each Emergency Response Procedure will be assigned its own unique number designation. Each unit will have its own distinct procedures maintained in separate binders. The number designator will consist of "FNP ", followed by the applicable unit designation. This will be followed by the appropriate series designation. Finally a number designator will be provided to identify the specific procedure within the series (e.g., FNP-2-ECP-3.3).

3.4 Page Identification and Numbering Each procedure page will have its own heading (see Figure 1).

The heading will contain the procedure number, the procedure title, and the latest revision contained on that page. The bottom of each page will provide the page number and total number of pages in that procedure.

3.5 Revision Numbering and Designation Procedure revisions will be given a sequential integer number. The portions of the page affected by the current revision only will be annotated using a vertical line drawn next to the associated steps.

This line will be located in the left margin for changes affecting the left column of the procedure, and in the right margin for changes affecting the right column. If a change affects the entire page, the revision number may be annontated as a General (Gen.) Revision and the vertical lines omitted. The revision number corresponding to the latest revision for a particular page will be indicated in the Heading.

Page 2 of 14 REV. 0

FNP-0-AP-74 4.0 Procedure Sections / Construction 4.1 Procedure Organization The Emergency Response Procedures will be constructed and comprised of the following sections:

4.1.1 Title /LOEP Page(s)

Each procedure will be prefaced by a title page and a list of effective pages (see Figures 2 and 3). The title shall be a short word heading which is descriptive of the procedure's purpose or function.

4.1.2 Purpose / Symptoms Page(s)

Page 1 (and additional pages, if necessary) of each procedure will contain the purpose section (see Figure 4). Following the purpose, if applicable, will be the symptoms section.

The purpose will consist of a brief statement regarding the intended function or use of the procedure.

The symptoms will consist of a prescribed set of initiating events or procedure entry conditions. The symptoms will key the operator as to the applicability of the procedure for a given set of plant conditions. Although some redundancy of initiating symptoms is required, this section will be limited to major initiating events. Listing of large numbers of symptoms containing expected actions resulting from the initiating event shall be avoided.

If the sole means of entry into a procedure is from a previous procedure, then an additional set of symptoms or entry conditions would not be required. For example; since entry into the " Loss of Reactor Coolant" (EEP-1) procedure is only via the Reactor Trip or Safety Injection (ELP-0) procedure, a seperate set of entry conditions for the EEP-1 procedure is not required. Additionally,

the structure of the critical safety function status trees is such that the symptoms are incorporated into their instructions.

Therefore, a separate set of symptoms will not be required for the critical safety functions.

j 4.1.3 Operator Actions Following the purpose / symptoms page will be the Main Body of the i procedure consisting of a numbered set of operator actions (see Figure 5). The instructions will utilize a dual column format.

The left hand column, headed " Action / Expected Response", will l contain operator actions which would generally be the expected progression of events / actions for the given emergency. The right hand column, headed " Response Not Obtained", will provide contingency actions to be taken. The operator actions page formating will contain border and column designations as

! shown in Figure 5.

Page 3 of 14 REV. 0

ENP-0-AP-74 The operator actions will be composed of a set of concise and specific operator instructions. These will normally be in the form of written word type instructions. They may also be presented using a logic tree type format as in the case of the critical safety function status trees.

4.1.4 Step Numbering Each major step will be assigned a sequential number 1, 2, 3, etc. (under the column headed " Step"). First order substeps of a major step will be indented. They will be assigned a number consisting of the associated major step followed by a decimal and a sequential number (i.e., 1.1, 1.2, 1.3, etc.). Second order substeps will be further indented from first order substeps. They will be assigned a number consisting of the associated first order step number followed by a decimal and a sequential number (i.e., 1.1.1, 1.1.2, etc.). Further order substeps should be avoided.

4.1.5 Prerequisite Step Numbers Procedure steps should be presented in the expected sequence of performance, and the general flow should be from top to bottom.

In order to prov;de additional flexibility and guidance, howevar, a prerequisite numbering system can be specified. Under each major step number a prerequisite step number may be provided in parenthesis. While operator actions are presented in the generally expected order of completion, it is recognized that strict performance of the procedures in numerical sequence may sot always be plausible or desirable. Therefore, to assist the spcrator in determining when a step may be performed, the number of the step which is the final prerequisite for performance of the current step may be provided. For example, if the step number (20) is provided in parenthesis below step number 25, then step number 25 may be performed after step 20 has been completed even if steps 21 through 24 have not been completed.

If no prerequisite step number is specified, then the steps should be performed in the order presented. Substeps of a major step will generally be performed in order. If, however, the order of substep performance is unimportant, a black dot will be used to identify the steps. In all cases, substeps can only be performed after the prerequisites for their associated major step have been completed.

4.1.6 Cautions Information which contains _ conditions, practices or procedures which must be observed to avoid personal injury, loss of life, or damage to equipment will be presented in caution statements.

Such information should be applicable to a specific step or portion of the procedure and the caution should be placed just prior to the applicable step (s). Caution statements will not be used instead of instruction steps and will not contain Page 4 of 14 REV. O

FNP-0-AP-74 any directed operator actions. Caution statements shall be wholly contained on a single page to avoid confusion and possible errors when changing pages. Caution statements will be centered between the left and right columns to preclude confusion with the procedure steps. The word " CAUTION" will be capitalized and underlined. The caution statement will be segregated using asterisks on the top and bottom for emphasis.

4.1.7 Notes If additional information is necessary to support an instruction or portion of a procedure but such information does not meet the criteria for a caution statement, a note will be used.

Like caution statements, notes shall be placed just prior to their associated step (s). Notes will not contain directed operator action and will not be used instead of procedure instruction steps. Notes will be centered between the left and right hand columns to preclude confusion with actual procedure steps. The word " NOTE" will be capitalized. Notes will be enclosed on the top and bottom with straight lines.

More than one item of information may appear within one Note heading. If such is the case, however, separate information items will be anotated with a black dot.

4.1.8 Check Off Provisions Check off lines will be provided for all first order and greater substeps.

4.1.9 Procedure Completion After the final operator action statement the word "END" will be provided. This will assure the operator that he has completed the final step in the procedure.

4.1.10 Foldout Page The final page for the "EEP" and " ESP" series procedures will be a foldout page. Other procedures may also utilize a foldout page as appropriate. This page will foldout to permit frequent review by the operator as the main body of the procedure is pe rfo rmed. The foldout page will contain vital parameters and criteria which should be frequently monitored by the operator.

The foldout page will conform to the same rules which apply to the main text.

5.0 Procedure Writing (excluding Critical Safety Function Status Trees) 5.1 Style 5.1.1 Length Instruction steps shall be concise and precise. That is, procedural wording should be brief but well defined.

Page 5 of 14 REV. O

FNP-0-AP-74 5.1.2 Content Instruction steps shall be limited to a single idea or action.

5.1.3 Assumed User Instruction content shall be written to communicate to the user. The user being an individual with the minimum level of training and experience required to perform as an operator.

5.1.4 Complex Evolutions Complex evolutions shall be broken down into a series of single steps, with each step as simple as practicable.

5.2 Level of Detail 5.2.1 Excessive Detail Too much detail should be avoided in order to promote effective performance in a timely manner. The level of detail shall be the detail a newly trained and licensed operator would desire l during an emergency condition.

5.2.2 Expected Results Expected results of routine tasks need not be stated.

5.2.3 Objects of Operator Actions Objects of operator actions shall be specifically stated. l This shall be done with sufficient detail to explicitly define l what is to be done and to what. l 5.2.4 Component /Handswitch Operation Instructions IF operation of a component is performed using a standard switch with unambiguous switch positions, THEN operation of the component may be specified by detailing the desired I state of the component. Reference to the operation of the switch is not required. In such instances, however, the desired state of the component must correspond precisely to a specific position of the control switch or device.

For example, " start CCW Pump 1A", is acceptable without I

specifying how to manipulate the handswitch. It is important when using this type of instruction that "CCW Pump 1A" correspond precisely to the nameplate nomenclature and that there is a " START" position on the switch.

Page 6 of 14 REV. O j

FNP-0-AP-74

! 5.2.5 Specifying Locations If a component or control is to be operated and is rarely used or difficult to find, location information shall be given in parenthesis following the component or control name.

As a general practice this would apply to operation of equipment outside the "At the Controls Area."

5.2.6 Common Engineering / Operations Practices In conjunction with the minimum training standards of the operator, actions or responses of equipment or systems which are commonly considered as part of normal engineering practice need not be stated in the instructions. For example, obser-vation of extinguishing of the green indicating light and illumination of the red running light would be normal practice when starting a pump. As such, to include these actions as part of the procedure would not be required or desirable.

5.3 Mechanics of Grammer and Syntax

. 5.3.1 Sentence Structure Sentences, clauses, and phrases shall be short and written in a common American English Structure. Instructions requiring operator action (s) shall be written as a directive (imperative mode). In general operator actions are most effectively presented in sentence fragments or properly structured phrases, rather than long sentences or paragraphs. Use of articles, pronouns, and superfluous adjectives or adverbs shall be avoided.

5.3.2 Action Verbs Only verbs which are commonly understood by an inexperienced operator shall be used. Use of a particular action verb shall i

be consistent. Refer to Table 1 for a standardized list of common action verbs. Action verbs which are easily confused with other action verbs shall be avoided. For example, increase and decrease should not be used. Adverbs can change the meaning of action verbs and therefore shall be avoided. If an instruction l contains an action verb with three or more objects, the objects shall be segregated from the verbage and placed in list form with space provided for operator checkoff.

l 5.3.3 Vocabulary i

The simplest, most familiar, and most specific words that

( accurately convey the intended meaning shall be used. All

! words should be understood by the newly qualified operator.

Except where a word (s) has acquired a definition as a result l of technical usage and is commonly understood within the industry, the definition of the word (s) shall conform to the more common usages as found in a standard American Dictionary.

Page 7 of 14 l

l

~

FNP-0-AP-74 5.3.4 Spelling Spelling shall be consistent with modern usage as presented in a standard American English Dictionary.

5.3.5 Hyphenation a

Hyphens are used between elements of a compound word or structure. Use of a hyphen to break a word at the end of a sentence shall be avoided. If any doubt exists as to the proper usage of a hyphen, the word or sentence shall be restructured to avoid hyphenation. The following are situations where hyphens shall be used:

' Hyphens should be used between some prefix and root word conbin-ations when this combination is similar to a different word.

Examples are: re-cover and pre position.

'When writing compound numbers from 21 (twenty-one) through 99 (ninety-nine).

"In compounds with self; examples: self-contained, self-lubri-cated.

"When misleading or awkward words would result by joining the words; example: bell-like.

"In writing fractions; example: one-half.

' Serves as an equivalent of the phrase "up to and including" when used between numbers and dates.

  • When a letter is linked with a noun; example: o-ring.

"To seperate chemical elements and their atomic weight; examples:

Uranium-235; U-235.

5.3.6 Punctuation The rules of punctuation for standard American English shall be used. In general operator instructions shall be written such that a minimal amount of punctuation is required.

If extensive punctuation is required for clarity, the sentence will be restructured. Short, concise clauses or sentences which are somewhat choppy but easily understood are preferable to lengthy confusing verbage. Some specific rules for the more commonly used punctuation marks are as follows:

'An apostrophe is used to denote the possessive case of nouns and pronouns. It may also be used to form plurals of letters, figures and words referred to as letters, figures and words.

  • A colon is used to introduce a series.

"A comma is used to seperate words, phrases or clauses in a series.

Page 8 of 14 REV. O

FNP-0-AP-74

' Parentheses are used to set off or separate, supplementary, parenthetic or explanatory material when the inclusion of such material does not essentially alter the meaning of the sentence.

'A period is used at the end of a complete sentence. It denotes the decimal place in numbers. It also is used to follow some abbreviations such as etc.

' A semicolon is used to link clauses not joined by a conjunction.

5.3.7 Abbreviations, Symbols, and Acronyms The use of letter abbreviations, symbols and acronyms shall be limited to a well defined and understood standardized set.

In general this set will be in accordance with FNP-0-AP-25 (equipment identification). Although FNP-0-AP-25 presents a standard set of plant abbreviations, only those abbreviations which are commonly recognized by the operators without referring to FNP-0-AP-25 shall be used. A list of permissible mathematical symbols and units are presented in Table 2.

The presentation of abbreviations, symbols and acronyms should be consistent. For example, if an abbreviation is defined in lower case letters, then the abbreviation should always be presented in lower case letters, even in titles and headings.

Periods snall be avoided in abbreviations unless the ommission would result in confusion.

5.3.8 Logic Logic terms such as AND, OR, NOT, IF, IF NOT, WHEN and THEN may be used to describe a specific set of conditions upon which certain operator actions are based. When words are used as logic terms they shall be conspicuously identified by presenting them in capital letters and underlined. The following are rules for use in logic statements.

'The use of AND and OR within the same action shall be avoided.

'AND shall be used to indicate combinations of conditions which must all be true prior to performing the associated action.

'No more than three conditions can be joined by AND. IF more than three conditions are necessary, THEN the conditions should be presented in the form of a list.

  • 0R shall be used to indicate combinations of conditions any or all of which must be true prior to performing the associated action. If the all true combination is not an allowable pre-condition,it must be specifically identified. For example:

"either A OR B, but NOT both.

I j 'When action steps are contingent upon certain conditions a

( logic statement of the form "IF_","THEN" or "WHEN", "THEN" shall be used. The words "IF_" or "WHEN" shall precede the conditional portion l Page 9 of 14 I REV. O i

FNP-0-AP-74 1

of the statement. A comma should be used to signify the end of the conditional portion and the action portion shall begin with the word "THEN." "IF" is used for an unexpected but possible outcome. "WHEN" should be used for an expected outcome.

'"IF NOT" shall be limited to those cases in which the operator must respond to the second and less desirable of two possible outcomes. "IF" shall be used for the first and more desirable outcomc.

'THEN shall not be used at the end of an action step.

5.4 Numbers and Alphanumeries 5.4.1 Numerical Values Numerical values shall utilize standard recognizable symbols and shall be consistent. Arabic numberals shall be used.

For numbers less than unity, the decimal point shall be preceded by a zero (e.g. 0.1). The number of significent i digits used will correspond to the number of significant digits available on the associated display and the reading precision of the operator. Although higher degrees of interpolation are possible, as a general rule requiring interpolation of a meter scale more accurately than one-half of the value between graduations shall be avoided.

5.4.2 Units Units of measure shall be familiar to the operator. Units shall correspond to displayed information directly without necessitating conversion. A virgule (slant line) will be used instead of "per"; examples: ft/sec, Btu /hr.

5.4.3 Component Identification Equipment nomenclature, alarm designations and references to control room displays, whenever possible shall correspond precisely to the engraving provided on the associated control, annunciator window or display. For components such as breakers with a name and commonly used alphanumeric designation, both descriptions shall be provided.

5.4.4 Setpoints When an operator action specifies an alarm or automatic function, the applicable setpoint should be provided for verification by the operator.

5.4.5 Tolerance / Limits When designating control points, a tolerance / limit band shall be given. The telerance band will be specified in the same units as the control point and shall utilize a "from-to" Page 10 of 14 REV. O

_ _ _ _ . . .__ _ _ _ - - - _ - _ _ . _ _ . ._~ _, _. _ . _ ,

~

) ,

FNP-0-AP-74 specification. Using a "1" tolerance band shall be avoided as this requires additional action by the operator to determine l the limits. If an action is required upon reaching a specific value, then no tolerance band would be required. Under these circumstances the direction from which the action value would be reached should be known and specified in the instruction. For example, TRIP Reactor Coolant Pump 2A at 1300 psig falling pressure.

5.4.6 Calculations l Calculations shall be avoided as they direct the operators attention from the plant.

5.5 Printed Operator Aids 5.5.1 Figures Graphs and drawings required for performance of a procedure

, will be given a figure number. Assigned figure numbers shall be sequential and arranged to coincide with their order of l reference in the text. Graphs shall be legible and utilize

, scales with units corresponding to the operators' displays.

Simple line graphs are preferrable to more sophisticated 4

graphs such as bar charts. Significant areas of the graph such as acceptable and danger regions shall be clearly marked.

I 5.5.2 Tables

! When lists of data are necessary a table shall be used. Tables

! shall be numbered similar to figures. Units for numerical values utilized in tables shall be consistent with operator displays. Presentation of data in tables shall avoid the necessity of interpolation. If interpolation is required presentation of the data in graph form should be considered.

5.5.3 Attachments Additional information required by the operator other than figures and tables will be appended as attachments. Attachment numbering will be sequential and arranged according to the order referenced in the text. Presentation and writing of attachments shall conform to the same rules as required for the main portion of the procedure.

5.5.4 Tabs Locating tabs will be provided to enable quick and easy access to the various procedures.

5.5.5 Placekeeping In order to enhance procedure placekeeping for the operator, check off spaces will be provided for every substep. These Page 11 of 14 REV. 0 E,,..-_..-._,__ , _ . , . - - _,,, _ ,- __ , _ , . . _ _ _ , , - _ , _ . _ - - - . . - - - - - - _ , -

-. a - - - , .-_ .h - _1 s ~ .L1-__m -

- [ '

FNP-0-AP-74 checkoffs may be utilized as desired by the operator and shall not be considered as a signoff requirement.

5.6 Procedure Flow and Interface 5.6.1 Referencing Referencing implies that an additional procedure or procedure steps are to be used as a supplement to the procedure presently being used. Since referencing may create a potential for the concurrent use of two or more procedures, use of referencing shall be minimized. If required however the words " refer to" shall be used. Also, the referenced document must exist, and have entry conditions compatible with the plant status at the time of referencing. Care must be exercised to ensure referencing actions do NOT route the operator around important instructions or caution statements.

5.6.2 Branching When it is necessary to perform another procedure branching shall be used. Excessive use of branching destroys continuity and shall be avoided. If only a few procedure steps are involved in the branching, they will be included in the originating procedure. When branching is required to a new procedure the transfer will be total. That is, the new procedure will take control and the previous procedure shall no longer be required. Branching shall be directive in nature utilizing the words "go to." As in referencing, the branch procedure must exist and have compatible entry conditions.

l Branching shall NOT route the operator around important l or necessary instructions or cautions.

(

l 5.7 Methods for Emphasis 5.7.1 Underlining l Underlining will be used to emphasize logic terms. It is also a useful tool for showing general emphasis as it has minimal effect upon procedure readability. Underlining shall only be used for the following procedure parts: the word l

CAUTION statements, major procedure steps and logic terms.

5.7.2 Capitalization Rules of capitalization for Standard American English shall be followed. In addition the following items shall be

! capitalized for emphasis and clarity: verbatim equipment l nameplates, engraved or placarded switch positions, verbatim annunciator light wordings, the words " NOTE" and " CAUTION" l

Page 12 of 14 REV. 0

. ___ . . _ _ . _ _ _ _ .. - = - - __ _ _ _ _ _. __ _ . _ _ . .

FNP-0-AP-74 1

in Note and Caution statements, conditional logic terms, and verbatim procedure titles and headings. Excessive uses of capitalization shall be minimized to prevent a diminishing effect.

5.7.3. Framing Partial framing of note and caution statements with a straight line above and below the Note statement and asterisked lines

! above and below caution statements will be used. This will help draw attention to the statements and help segregate the statements from the main text.

5.8 Typing 5.8.1 Paper

! Page size with the exception of foldout pages shall be j standard 8 1/2 x 11 inches. To prevent confusion between units, Unit 1 procedures will use yellow paper and Unit 2 procedures will use green paper.

5.8.2 Type Procedures will be typed utilizing a standard modern style type with no greater than 12 characters per inch.

Temporary changes may be initially made as necessary until the affected pages are typed.

5.8.3 Page Arrangement i

Pages margins, borders and spacing shall be in accordance with Figure 6.

5.8.4 Page Rotation If rotation of a page is required for tables etc., the following rules should be followed:

  • The top of the rotated page should be the normal left hand edge.
  • The page margins do not rotate.
  • Page identification and numbering will not be rotated.

6.0 Critical Safety Function Status Trees 6.1 Logic Sequence Critical safety function status trees (F-Series) will utilize a branching logic tree format (see Figure 7). Flow of the logic will be from left to right across the page. Arrangement shall be in their general order of priority regarding plant safety.

Page 13 of 14 REV. 0

- . _ - _ = .- - -

T FNP-0-AP-74 6.2 Color Critical Safety Function Status Trees will contain a four color scheme to aid in indicating degrees of severity. Colors used will be red, orange, yellow and green respectively from more severe to less severe.

6.3 Logic l A progression logic sequence will be used that is limited to only two possible outcomes at each decision point. Additionally the two possible outcomes specified at each decision point will include all outcomes of the specified trial. This will ensure the operator can always proceed from the initial decision point to the final outcome.

6.4 Logic Path and Outcome Coding To reinforce the color coding both line and final outcome coding will be used. Red paths will be solid heavy lines, orange paths will be heavy dashed lines, yellow paths will.be dotted lines, and

! green paths will be two thin lines. Red outcomes will end with a i full heavy ring, orange paths will end with a ring of 240 degrees, l yellow paths will end with a ring of 120 degrees and green paths will end with a thin lined circle (see Figure 8).

6.5 Branching In all instances where the safety function monitored by the Critical Safety Function Status Tree is not satisfied (i.e. the final outcome is not a green circle), specific branching instructions shall be

, provided. This will direct the operator to the applicable function restoration procedure in order to restore the safety function to an acceptable status.

1 Page 14 of 14 REV. 0

. FIGURE 1 FNP-0-AP-74 FNP-1-EEP-0 Reactor Trip or Safety Injection Revision 0 Step Action / Expected Response Response NOT Obtained y if )I if if

-END-Ji d Ji 11/11 REV. 0

FNP-0-AP-74 FIGURE 2 FNP-1-EEP-0 Date Revision FARLEY NUCLEAR PLANT EMERGENCY EVENT PROCEDURE FNP-1-EEP-0 S

A F

E

! T

{ Y REACTOR TRIP OR SAFETY INJECTION R

E L

A T

E D

4 Approved:

Operations Superintendent

, i Date Issued:

i Diskette # REV. O

Figure 3 LZST OF EFFECT NE PAGES FNP-0-AP-74 REVISION NO. .

i PAGE NO. O !1 2 !3 4 5 l6 7 l8 l9 10l11 l l 1

i I

e .

I k l l I

! l I I  ! -

i i I i l

l l i  ;

l  ! l l l  ! l l l l i l l l

! l l I l l l i l l l t  ! l  ! i l l I i  !  ! i i  :

I  !  !  !  ! I i  ! i i  :

!  ! l  !  : i  !  ! t <

Rev. O

, . FIGURE 4 FNP-1-EEP-0 Reactor Trip or Safety Injection Revision 0 Step Action / Expected Response Response NOT Obtained V V. If V if if A. Purpose I. The purpose of this procedure is to verify proper response of the automatic protection systems following actuation of a Reactor Trip or Safety Injection; and to assess plant con-ditions and identify the appropriate recovery procedure.

B. Symptoms I. Following are symptoms of a reactor trip:

a. Any reactor trip annunciator.
b. Rapid drop in neutron level indicated by nuclear instrumentation.
c. All shut down and control rods are fully inserted. ,

Rod bottom lights are ON.

d. Rapid drop in unit load to zero power.

II. Following are symptoms of reactor trip and safety injection.

a. Any SI annunciator lit.
b. SI pumps in service.

Il ik A JL JL n

1/_

REV. 0

, FIGURE 5 FNP-0-AP-74 FNP-1-EEP-0 Reactor Trip or Safety Injection Revision 0 Step Action / Expected Response Response NOT Obtained V V lf lf U V

36. Check if RHR pumps should be stopped.

_ 36.1 RCS wide range 36.1 IF either RCS wide pressures greater range pressure less than 130 psig than 130 psig OR AND NOT falling. falling, THEN proceed to step 28.

~

RCS WIDE RANGE LOOP A (PI 403A)

~

RCS WIDE RANGE LOOP B (PI 402A)

_ 36.2 Reset SI.

SAFETY INJECTION TRAIN '

A reset SAFETY INJECTION TRAIN B reset CAUTION IF RCS pressure drops below 130 psig, THEN RHR pumps must be manually restarted to supply water to the RCS.

_ 36.3 TRIP RHR pumps RHR PMP 1A tripped RHR PMP 1B tripped

37. Rediagnose plant conditions:

_ 37.1 Proceed to step 18.

-END-N Jk Jk JL JL jg l .

11/11

REV. O I

l l

. FIGURE 6 FNP-0-AP-74 Step Action / Expected Response Response NOT Obtained if If lf lf if y Left hand margin greater than 3/4"

~

Right hand margin greater than 1/2" i

Bottom margin greater than 3/4" l

Il ik Jk Jk A a

REV. 0

,! r'

~ .

M [ClM c ~

mZTL eOC?P. D .

C - - >I f 3I AT<G T

OZ o D

E 1 1 2 I F

O T

S -

O S T -

O T

o 5 -

' P S

I P P FT O R O R O G F G F G aF R SA CS

\

b' .' , #

e ' c' 'w

-s

[ (k ('x I O o O c O c g O a g O c O e C c C o g CET o E T

A A c CR R g OUT P

e P

U T

E T

R S AT oET R A

E E T A cAR G

N R G N GS O S O

P A

4 I

U A

R ORE eUTP R E

E T

A gRA T E

T A

CR Z E G -

N

, R A

E G

N Z

R I T S

I D

  • - O A nSTE A O O

D A E R R E E E E V V M V I M GT I E C

eV I E

C I

T R T R A R T R A E

T I

S E

T DGE U oI G U G N O N O O O E

.P N S nP S N I I C

  • ,.(' $ o Q (b C G $ D ,/, ~

5

_ N

_ E A E  %

G H G 5 N T N A A N R A R E R T H R R T E A E S

E W R W S O

G O E P P L I

E E G G N N A A R H E E E L C C A R R C

_ F S U U O F O N

_ S O S O m-A%a

_ K

'o<-

UOLUME l- Figure d FNP-0-AP-74 THE S C H E !1 E OF L I ll E PATTERil C O D I tl G USED TO IDEllTIFY PRIORITIES BP#!CH STATUS LIFE IDBITIFIER e

O IHE CRITICAL SAFET/ FUNCTION IS SATISFIED -

CORRESPotOS To GR8)

NO OPEPATOR ACTION IS CALLED FOR CORRESPONDS To YEU_0W g za C_ _ ,_ ,S _ _

SATISFIED - OPERATOR ACTION t%Y EVENTUALLY BE NEEDED m THE CRITICAL SAFETY FUNCTION IS Uf0ER CORRESPCf0S To GPR!GE SEVERE CHAI.LENGE - PROMPT OPERATCR ACTICN IS NECESSARY l

l m IHE CRITICAL SAFETY FUNCTICN IS IN JECP/B( -

l CCRRESPCTOS To @ IfT'EDIATE OPERATCR ACTION IS RECUIRED REV. 0

1 .

4

FNP-0-AP-74 TABLE 1 ACTION VERBS VERB DEFINITION /USE Align To arrange or position a set of elements to perform a specified function. When " align" is used the instruction i

should specify the system or devices to be manipulated and the desired function (s) to be achieved. For example,

" Align the service water system to provide cooling water to the generator hydrogen cooler."

l Allow To permit a stated condition to be achieved. For example, -

j allow discharge pressure to stabilize.

Attempt To make an effort to perform a task. This verb should only be used when there is a significant possibility the specified task may not be achieved.

i' Block To prevent or inhibit the normal functioning of a device or control system. For example, " Block safety injection."

Check To investigate the position or status of a specified function or variable. Check should be used to indicate a strictly investigative process. No equipment or control devices

should be manipulated when performing a " Check" function.

Check Closed The process of investigating the position of a valve, breaker or other device when the expected position of the device is closed. The actual position of the device should remain unchanged regardless of its "As Found"

, position. If the "As Found" condition is not closed, further investigation to resolve the discrepancy should be performed.

Check Open The process of investigating the position of a valve, breaker or other device when the expected position of 1 the device is open. The actual ' tition of the device should remain unchanged regardiasr of its "As Found" position. If the "As Four> ; nd' ion is not open, further investigation to resolve n. uir , pancy should be performed.

Close To change the physical position of a device to either prevent the flow of mass thru the device (such as valves, doors, etc.) or in the case of breakers to permit the flow of electrical current.

Commence To begin the initial act. Generally to start a lengthy or complex evolution.

Page 1 of 4 4

4 e ., ,y. _ ,,,- . . y . . .,,p . . , . , ..,-g...,,,,,-,-y. m.r- - - . , ,_.---,.r,--.%y,,,,,,,,-.,.,e,- ,.,-,,,..,,..--c,%-

FNP-0-AP-74 TABLE 1 (cont)

VERB DEFINITION /USE Compare To examine two or more parameters in an effort to discern similarities or differences. The parameters should be similar to permit direct examination. In general comparisons should be limited to an examination of magnitude differences between two similar variables.

Complete To perform a specified action or task to a final end.

Continue To maintain a course of action or to resume a course of action which was interrupted.

Control To exercise direct physical influence over a parameter, function or device. Using physical manipulation of plant devices, to cause a desired event (s) to occur.

Decrease Do not use.

De te rmine To ascertain the status or to resolve a question thru an investigative process. Generally used to initiate an investigation upon which to base a decision.

Equalize The process of making two or more variables the same.

The variable (s) to be adjusted should be similar enough to enable direct comparison.

Establish To bring about. To take necessary actions to cause a specified set of conditions to exist.

Evaluate To determine the significance or worth of something usually by careful appraisal or study. Generally to formulate a decision regarding a course of action by careful study of applicable conditions. For example, " Evaluate the need for continued containment spray system operation."

Identify To distinguish an item or parameter with unique characteristics from a group of items or parameters. For example, " Identify the faulted steam generator."

Implement To carry out. To initiate and maintain a prescribed course of action (s).

Increase Do not use.

Initiate To commence or begin. Generally used to cause the start or beginning of an effort which can not be completed in a short time. For example, " Initiate SI."

Inspect To examine closely in a critical manner. Generally used to require a search for a potential problem or error.

Investigate To observe or study by close examination in a systematic manner. Generally used to cause a search for problems or information.

Page 2 of 4

[

  • FNP-0-AP-74 TABLE 1-(cont)

VERB DEFINITION /USE Isolate To seperate one item from another. Generally used to require the securing of flow to and from a component. For example,

" Isolate the boron injection tank."

Maintain To cause a condition or function to continue in an unchanged state. Should only be used to specify that a given set

! of conditions which have previously been established should be continued.

Open To change the position of a mechanical device to either permit the flow of mass thru the device (such as valves, doors, etc.) or in the case of breakers to prevent the flow of electrical current.

Operata Te perfore the necessary action (s) to cause a component or device to function. Generally used to direct the starting and running of equipment.

i Place To direct to a specific location. Generally used to direct the movement of a control device to a specific position.

l When used there should be direct correspondence between the directed position and the actual position as indicated on the associated control.

t Prepare To make ready for some purpose, use or activity. To plan in advance for an activity. Generally used to require all advanced planning and initial condie. ions be completed prior to performing a related activity.

Prevent To keep from happenning. Generally used to direct any necessary actions to preclude an action or condition from occurring.

Raise To cause a parameter to become larger in magnitude. For example, " Raise RCS pressure."

Record To set down in writing. Generally used to require the writing of informatoin so as to create a permanent reference.

Reduce To cause a parameter to become smaller in magnitude. For example, " Reduce RCS pressure."

Reset To restore to an initial or previous state. Generally used to direct the placement of a component or control device to a pr a3 ipped or to a ready / standby condition.

Restore To return to a fereer original condition. Generally used to require the reinstatement of a system or broad function to a pretripped or a ready / standby condition.

Set To adjust a device especially a measuring or control device 3

to a desired position. Generally used to direct the positioning of ( variable control device. For example,

" Set diesel speed to 720 rpm."

Page 3 of 4 REV. 0 4

FNP-0-AP-74 1 TABLE 1 (cont)

VERB DEFINITION /USE Shutdown To stop or cease to operate. Generally used to direct the placing of a system or complex piece of equipment in a normal nonoperating condition.

i Start To begin an activity or undertaking. Generally used to direct the placing of a piece of equipment from a shutdown to a running condition when such action is achieved by the placing of a control device in a corresponding " start" or "on" position.

Stop To cease an activity or to cause an activity to cease.

3 Generally used to direct the placing of a piece of equipment from a running to a shutdown condition when such action

. is achieved by the placing of a control device in a corresponding "Stop" or "Off" position.

Te rminate To bring to an end or to cease an activity. Generally used to direct the cessation of a system or complex function.

Throttle To control the flow of a fluid, usually by manipulation of a valve. Generally used to direct the operation of a valve or valves in an intermediate position to control fluid flow.

Trip To manually actuate a semi-automatic feature. Generally used to direct the manual actuation of a control which will cause the associated device to cease operation in a short time frame.

Vent To permit a fluid under pressure to escape.

Verify To ensure an expected condition or action has occurred and if necessary to take actions to make the condition or action occur.

1 .

1 Page 4 of 4 REV. 0

'l FNP-0-AP-74 TABLE 2 SYMBOLS / UNITS SYMBOL / UNIT DESCRIPTION NOTE Mathematical symbols are intended for use in calculations. Their use in instructional steps should be restricted.

X>Y X greater than Y X>Y X greater than OR equal to Y X<Y X less than Y X<Y X less than OR equal to Y X=Y X equals Y X/Y X does NOT equal Y X+Y X plus Y X-Y X minus Y X+Y X divided by Y X/Y X divided by Y XxY X multiplied by Y

( ) Indicates to perform operations within parenthesis prior to other operations X x 10 10 raised to the Y power multiplied by X.

A Amperes Btu British Thermal Unit Ci Curies ft, ft2, fts Feet, square feet and cubic feet gal Gallons hp Horse power h Hours Page 1 of 2 REV. O

FNP-0-AP-74 TABLE 2 (cont)

SYMBOL / UNIT DESCRIPTION l HZ Hertz (cycles /second) in, in 2 , in 3 Inches, square inches and cubic inches inHg Inches of mercury inHga Inches of mercury absolute I

inh O Inches of water 2

inh 20a Inches of water absolute kW Kilowatts Ib Pounds min Minutes NW Mega-watts psi Pounds /in 2 (pressure)

I psia Pounds /in 2 absolute psig Pounds /in2 gage rd Rad rem REM t

rpm Revolutions / minute V Volts

', W watts i

  • C Degrees Celsius i
  • F Degrees Farenheit
  • K Degrees Kelvin l R Degrees Rankine

% Percent t

I I

i i Page 2 of 2 REV. O i